Get approval of Building Plan through Automated Building Plan Approval system

Comments(13) Sub Category:Property Posted On: Jun 10, 2011

An automated building plan approval system or process enable a person to get building plan approved faster than before. Earlier approval of a plan was taking between 20 days and one month. Now the process would take about a week and subsequently it could be reduced to four to five days. Under this system you will require the assistance of an Engineer, Architect or a Supervisor, duly registered with the Town Planning and Development or concerned civic authority of your city.

In the prescribed application form, the registered Engineer / Architect /Supervisor will guide you in filing all the required documents and affidavits. A checklist is also provided along with the application form to ensure that all the requisite documents are filed. Registered Architect/Engineer/Supervisor means a qualified Architect/Engineer/Supervisor who is registered with government or civic body. If the plan is as per the building byelaws and if all the requisite documents are enclosed and are in order, the plan will be automatically sanctioned and you can collect the plan within a week.

Building Plan approval process

As per the relevant provisions of the State Municipality Act, any person desirous of undertaking a construction activity (fresh construction as well as modifications to existing structures), is required to obtain prior sanction from the relevant local body before embarking on the same. Earlier the processes related to scrutiny, approval and rejection are carried out manually. The status tracking by the citizens & department officials becomes difficult & cumbersome with manual process in place. An automated building plan approval system speed up the Building Plan Approval Process and make the process more efficient and citizen friendly.

How to Apply

  • The prescribed application form along with the list of documents to be filed is available in the website of civic body or municipality. In the prescribed application form, the registered Engineer or Architect will guide you in filing all the required documents and affidavits. The Architect will make the necessary calculation for the fee payable.
  • In order to submit a plan for online approval, you will require Login ID & password. You can get this by submitting a request to the department.
  • Login using your ID & Password and click on Building License and select appropriate options from list available. Once you duly filled online application, click on Attach to upload the PreDCR formatted drawing from the local disk of your computer.
  • You will receive file number, which is important for future reference. Take print out of receipt and submit along with hard copy. Pay DD/Cash for fee of Building Plan approval.
  • If the plan is as per the building byelaws, Charges or fees are paid and if all the requisite documents are enclosed and are in order, the plan will be automatically sanctioned.

Obligations

The Engineer / Architect/ Supervisor is obliged to see that the plan prepared and submitted is as per the building byelaws and the general requirements prescribed by civic body. During the construction stages they are responsible to see that the building is built as per the sanction plan.

  • Once you receive Building Plan sanctioned, complete the building up to the plinth level and file an application for Commencement Certificate. Site inspection will be made by the authorized officer. If there are no objections you can collect the Commencement Certificate on the next working day.
  • After the building is completed you are required to file an application for Occupation certificate. The prescribed authority will inspect the building and after ascertaining that the building is as per the sanctioned plan, will issue a certificate. This certificate is called the Occupancy Certificate. Up to five per cent deviations are allowed. If the deviations/violations exceed these limits, the authorities, after issue of notice can demolish those portions that have exceeded the sanction plan.
  • Building plan approval procedure defined through AutoDCR is highly process-oriented and the progress of the file movement can be seen by department officials, architects, and citizens at any point of time from anywhere. Auto-DCR is the unique and innovative way of automatic scrutiny of building proposal by reading CAD drawings. This system reduces the paper work, valuable time and effort for architects as well as the authorities.

Your Architect will guide you in the documents that require to be filed along with the application for sanction of building plan. Previously sanctioned plan and Foundation Certificate (in case of additions/alterations/modifications) is required to enclose with application.

The system is currently being used in Pune, Delhi, Mumbai, Bangalore, Chennai and Hyderabad. With automated building plan approval system, not only builders or developers but also apartment owners, property buyers or property owners can also apply for new construction or modification of existing building.  People can get approval of their house though Automated Building Plan Approval system sitting at home.  If there are any corrections to be made, applicants can submit a fresh plan using the “Resubmit Plan” option.

 

13 Responses to “Get approval of Building Plan through Automated Building Plan Approval system”

  1. Hsdjhgabkaj says:

    not for me

  2. wouldn’t have to worry for a permit to take long

  3. cad drawing says:

    That is really interesting, You are an excessively skilled blogger. I have joined your rss feed and look ahead to seeking more of your great post. Also, I have shared your website in my social networks

  4. Sangeetha says:

    Can u please provide the website of Automated Building Plan System.

  5. Steve says:

    I look forward to seeing more great posts like this one.

  6. Landowski says:

    This is really a smartly written article. I will make sure to bookmark it and return to read more of your useful info. Thanks for the post. I will definitely comeback.

  7. Dhaval says:

    I have bought a flat in a Co-operative society which is 22 years old. I have Floor plan but it doesnot bear the stamp of Local Municipal Authority whereas I doesnot have the Building Plan [i.e. Blue Print]. Is there any way thru which I can get the Building plan & also stamp of Municipal Authority on the Floor plan.

    Please help me on this matter on urgent basis.

  8. Bhavesh says:

    A 30 year old Co-Op Hsg Society misplaced/lost its BMC Approved plan copy.
    Kindly suggest how to get this copy and where and whom needs to be contacted for obtaining the same.
    Kindly suggest.

  9. Ellis Baudler says:

    Your website has some really practical information on it. I’ve found your style helpful and engaging. I really do like your stuff appreciate it.

  10. azs says:

    “The system is currently being used in Pune, Delhi, Mumbai, Bangalore, Chennai and Hyderabad”. can you please explain where and how this happening?

  11. gaurav says:

    I’ve 1500 sq. Feet plot in pune, on sinhgad road. I’m planning construction on the same. But as informed by one architect, for sanctioning a building plan, minimum area needs to be 3000 sq. Foot. Is it true ?
    If yes , what can I do to sanction my 1500 sq foot plots .
    Please help me as I’m so confused n tried every possible way on Google for info.

  12. Andreas Katcsmorak says:

    Nice post. I learn something new and challenging on sites I stumble upon every day. It will always be helpful to read articles from other writers and practice a little something from their web sites.

Leave a Reply



CommonFloor Property Search Mobile App now available on Android, iOS and Windows!