Ozone Metrozone, Chennai

[ Under Construction ]

Pillaiyar Koil Street, Anna Nagar, Chennai-600040, Tamil Nadu, INDIA.

Ozone Metrozone, Chennai [ Under Construction ]

Pillaiyar Koil Street, Anna Nagar, Chennai-600040, Tamil Nadu, INDIA.

Project Photo

APARTMENTs

6 BLOCKS , 17 FLOORS
Price:
1.63Cr to 5.05Cr
Unit Details:
More than 1000 units
2, 3, 4, 5 BHK
1555 - 4818 SQFT
Locality:
Builder:
Possession:
From Dec 2016

Featured property Agents in the locality

Loading...
Project Last Updated on : 17 Jul 2014

Specifications of Ozone Metrozone

Structure
* RCC, in compliance with Seismic Zone III
* Walls will be of RCC using Mivan system of framework
* Deep pile foundation
Wall & Ceiling Finishes
* Internal walls finished with lime punning and acrylic emulsion
Doors, Windows & Ventilators
* Imported engineered panel doors for all the rooms
* Anodized aluminum sliding windows with mosquito proof shutters
* Anodized aluminum ventilators with translucent glass for all toilets
Floor Finishes
* Living, dining, internal passages & bedroom finished with quality vitrified tiles
* Imported wooden flooring for master bedroom
* Anti-skid ceramic tiles for toilets and utility areas
* Matt finish ceramic tiles in balconies and open terraces
Bathrooms / Toilets
* Wall mounted EWC
* Washbasins with granite counter top and mirror
* Ceramic tile dadoing up to ceiling
Kitchen & Utility
* Polished granite counter with SS sink
* Sink in the utility area
* Matt finish vitrified tiles in kitchen
Electrical
* Concealed conduit with modular switches
* Split A/C power points in living, dining and all bedrooms
* Power points in all rooms
* Cable TV and telephone points in living room and all bedrooms
Plumbing
* Concealed piping (pressure tested)
* Hydro- pneumatic system for water supply
* CP fittings of reputed make
* Water Treatment RO Plant
* Fully treated water through an exclusive water softening & purification plant
Sewage Treatment Plant
* Treatment plant of adequate capacity as per norms
* Recycled water used for flushing & gardens
Elevators / Lifts
* Two automatic passenger lifts for each tower
Telecom
* Fully integrated EPABX system
Cable TV
* An exclusive network of cable TV points will be provided for each unit
Car Parking
* Basement car parking in excess of 4000 cars
* Visitors' car parking facility up to 250 cars

Payment Plan

On Booking (5L – for Apartment Units & 10L – for Pent House Units)
Balance of 10% within 15 days of Booking
10% within 30 days of Booking
10% within 75 days of Booking
10% within 120 days of Booking
10% on completion of First Basement
10% on completion of 2nd Floor Roof
10% on completion of 7th Floor Roof
10% on completion of 12th Floor Roof
10% on commencement of Internal Painting
5% on completion of Flooring
5% on Registration of UDS / on Unit Handover

 