completed

Possession: Nov 2013

Property Type

Apartment

2 BHK Apartment

1155 - 1300 sq.ft

34.65L - 39L

NA

3 BHK Apartment

1650 - 1950 sq.ft

49.50L - 58.50L

NA

Guide

User Reviews - Concrete Opus

This project doesn't have any user reviews as yet.Be the first one to rate this project

MASTER PLAN

Amenities - Concrete Opus

Community Amenities :Garden 24Hr Backup Maintenance Staff Security Community Hall
Kid Friendly :Play Area
Connectivity :Intercom
Green Living :Rain Water Harvesting
Health & Fitness :Gymnasium Indoor Games

Specifications - Concrete Opus

STRUCTURE:
Reinforced cement concrete.

SUPER STRUCTURE:
Light weight clay bricks in cement mortar with two coats plastering inside and sponge finish outside.

DOORS:
Main door with teakwood frame and designer teakveneer shutter with melamine polish and brassfittings;other internal doors with teak wood door frame & HDF designer skin moulded paneled door shutters.

WINDOWS:
Teakwood frames and shutters with glass panels and M.S. safety grills.

FLOORING:
Good quality 2'x2' vitrified tiles with 4" skirting.

KITCHEN
Granite slab for kitchen platform with 8"x12" tile dado up to 2' height and stainless steel sink.

FINISHES:
Alltek luppam finish for total flat.

TOILETS:
All the toilets will consist off:
a) EWC with flush tank of Hindware make.
b) Hot and cold water wall mixer with head shower.
c) All CP fittings are chrome plated of Hindware or equivalent.
d) Anti skid tile flooring for all toilets and 7'0" height dado for walls.

PAINTING:
a) Inside: Asian tractor emulsion for internal walls.
b) Asian enamel paint for all frames, shutters and grills.
c) Outside: Texture & Tiles elevation with Asian Apex.

ELECTRICALS:
Concealed copper wiring in conduits for lights, fans; power plug points wherever necessary.
Power outlets for air conditioners in all bedrooms.
Power plug for cooking range chimney, refrigerator, mixer grinder in kitchen.
3 phase power supply for each flat.

GENERATOR:
Standby generator for lightening in common areas, lift and pumps. for 2 BHK flat will be provided 6 points and for 3 BHK flat will be provided 8 points with change over switch.

TELEPHONE & TV:
Telephone points in hall & Ch.bedroom and TV points in hall & M.bedroom.

WATER:
24 hours water supply is ensured with overhead water tank.

LIFTS:
2 No.s of Six-passenger lifts with V3F Kone/ Johnson make.

PARKING:
Car parking provided at extra cost.

VIEW MORE

VIEW LESS

Established by A.Anil Kumar reddy and T. Praveen kumar Reddy in 2002, concrete constructions in one of the reputed developers in twin cities. In just 10 years, the firm has delivered more than 20 projects, and has to it’s credit over 7,00,000 – square feet of constructed area, over hundereds of sati...Read More

CONCRETE CORNET, Plot No. 8, HUDA Trade Centre, Lingampally, Hyderabad, Andhra Pradesh, INDIA

More About Concrete Opus

Concrete Constructions has launched yet another project in Hyderabad. Concrete Opus is located in Nacharam, Hyderabad, Andhra Pradesh, India. The Project has various modern amenities like Garden, Play Area, 24Hr Backup, Maintenance Staff, Security, Intercom, Rain Water Harvesting, Gymnasium, Indoor Games, Community Hall etc.

VIEW MORE

VIEW LESS

Approvals & Loans

Bank

HDFC Bank
LIC Housing Finance Ltd

Compare Interest Rates

Real Estate Guide


Rate this Project(All fields are mandatory)

Flat quality
Poor
Average
Good
Very Good
Excellent
Project Amenities
Poor
Average
Good
Very Good
Excellent
Builder Score
Poor
Average
Good
Very Good
Excellent
Neighborhood Livability
Poor
Average
Good
Very Good
Excellent
You are a
*Minimum 50 characters
Submit