Launched: Apr-2009
Ready-to-move
Possession: Mar-2014
Property Type
Apartment
The information provided herein have been collected from publicly available sources, and is yet to be verified as per RERA guidelines.*
Unit Types
Build-Up Area
Carpet Area
Price
Floor Plans
Live-in Tour
1 BHK Apartment
580 sq.ft
NA
19.57L

NA
2 BHK Apartment
993 - 1027 sq.ft
NA
33.51L - 34.66L

NA
3 BHK Apartment
1368 - 1371 sq.ft
NA
45.24L - 46.17L

NA

MASTER PLAN

Amenities - Sabari Serenity

  • Landscape :
  • Landscaped Garden
  • Indoor Games :
  • Indoor Games
  • Fitness :
  • Swimming Pool
  • Gymnasium
  • Meditation Hall
  • Outdoor Games :
  • Play Area
  • Green Living :
  • Rain Water Harvesting
  • Recreation :
  • Club House
  • Health Facilities :
  • Health Facilities
  • Eateries :
  • Cafeteria
  • Safety & Security :
  • Gated community
  • Security
  • Convenience :
  • Maintenance Staff
  • 24Hr Backup Electricity
  • ATM

Specifications - Sabari Serenity

General

STRUCTURE

RCC framed structure. Designed for seismic zone – III. Multi- storied building with stilt 9 floors. Solid blocks for walls with cement plastering.

FLOOR FINISHING AT

Living & Dining : Vitrified tiles (2’ x 2’)

Bed rooms : Ceramic tiles (20” x 20”)

Kitchen : Ceramic tiles (20” x 20”)

Balcony : Anti skid ceramic tiles

WALL FINISHING AT

Toilets : Colour glazed ceramic tiles from floor to 7’ height in shower area and floor to 4’ height in other areas

Above kitchen platform : Colour – Glazed tiles dado upto 2’ height.

Utility : Colour – Glazed tiles upto 3’ height to the required area

Kitchen platform : Black granite counter with stainless steel sink

PAINT FINISHING AT

Interiors : Oil bound distemper

Exteriors : Cement paint

Ceilings : Cement paint

DOORS, WINDOWS & VENTILATORS

Main door : Teak wood frame with OST flush door, front side varnished shutter, back side painted with Godrej or equivalent lock

Other doors : Hard wood / Sal wood frame with flush door shutter painted on both the sides

Windows : UPVC casement windows

Ventilators : UPVC glazed louvers

PLUMBING / SANITARY FITTINGS

Toilets : European closets and wall mounted wash basins – Hindware or equivalent. EWC includes seat cover and PVC flushing tank

CP fittings : Ess Ess or equivalent

2 in 1 shower will be provided & health faucet for closet

ELECTRICAL

ISI quality cables using copper wiring through PVC conduits concealed in walls and ceilings

3 Phase connection with independant meter

SWITCHES : Semi modular switches

ELEVATORS :Two lifts for each Tower

POWER BACK-UP :To connect two light points and two fan points in the apartment

CUSTOMISATION :Additional electrical points can be provided at extra cost subject to confirmation from our technical team.



VIEW MORE VIEW LESS

Sabari Foundation Pvt Ltd

In the year 2002, The Sabari Group, headed by its dynamic Chairman & Managing Director, Mr. K.R.V.Ramani ventured into the Hospitality business.



The Company Sabari Inn Pvt. Ltd. opened its Maiden Hotel, Quality Inn Sabari, a 4-Star Deluxe category Hotel on Thirumallai Pillai Road, T. Nagar. This Hotel has 72 rooms with state-of-the-art facilities.



After the successful launch of this Hotel, the second hotel named Quality Hotel Sabari Classic went into operation in September 2007, in Navalur, OMR in the visinity of the SIPCOT IT Park at Sirisery. This is also a 4-Star Deluxe category Hotel with 84 rooms, lazed with modern amenities.



In February 2009, the Company expanded its Horizon by entering Kodaikanal to setup a 3-Star Deluxe category Hotel - Quality Inn Sabari Resorts. This hotel has 50 rooms, 2 Banquet Halls, Victorian style bar and a modernized restaurant.



The Group acquired Nilgiris Nest Hotels at Chennai, Bangalore and Coimbatore in December 2008 and after refurbishing them have commenced operations with a total of 110 rooms in these locations.




Read More Read Less

2nd Main Road, R.A. Puram, Chennai, Pin Code – 600028, Tamil Nadu, INDIA

Projects in Chennai

Ongoing Projects

More About Sabari Serenity


Sabaris Serenity Chennai developed by Sabari Group is nestled at OMR, Siruseri. It is spread over 9 acres of land with 13 towers with 864 apartments in a range of 1/2/3 bedroom apartments. It is built up in Phase I and Phase II with phase I providing 1/2/3 BHK and phase II providing 2/3 BHK. It is situated near the booming IT corridor which is just 25 minutes drive from Tidel Park, 45 minutes from the airport and within proximity to SIPCOT IT Park. The main landmark is Siruseri Lake. Dwelling in the warmth and comfort of the serenity, people find the facilities as well. The modern infrastructure are also available as per the requirement of the people. The amenities includes landscaped garden, sewage treatment plant, power backup for common areas like lifts & lighting, hydro pneumatic pumps, reserved car parking, two elevators in each block with one passenger lift and another stretcher lift. The club house is also sophisticated with swimming pool, multipurpose hall, indoor games, children\'s play area, well equipped gymnasium,cafeteria, etc. There is the provision for commercial complex as well with almost all the civic amenities like drug store, convention store, polyclinic with lab facility, vegetable & fruit shop and others too. Sabari Group has interests in hotels, supermarkets and property development. In the last couple of years, the group had developed four landmark buildings on OMR under the banner of Vishranthi Sabari. Sabari is synonymous to elegance and consistency of design blended with beauty and contemporary style. Sabari has been a pioneer in changing the landscape in Chennai. Sabari has revolutionized the residential and commercial sectors by creating state of the art designs that concentrate on innovation and customization. Every project of Sabari is the outcome of synergy between good location, optimal space management, serene interior layouts and natural light. The Group holds an enviable position amidst the hospitality, construction and retail business since 2002.

This project consists two phases

Phase 1 will be completed by March 2014. 100% flats are sold out.

Phase 2 will be completed by June 2015.
VIEW MORE VIEW LESS

Approvals & Loans

Real Estate Guide