By: Eros Group in Noida Extension
Change your area measurement
MASTER PLAN
Walls | Oil bound distemper over cement plaster |
Ceiling | White wash |
Floors | Vitrified tiles |
External Doors & Windows | Anodized Aluminium UPVC (Glazed) with aluminium fixtures |
Internal Doors | Flush doors with maranti hardwood frames |
Others | Copper wiring with adequate switches & sockets |
Additional Features | - |
Walls | Oil bound distemper over cement plaster |
Ceiling | White wash |
Floors | Vitrified tiles |
External Doors & Windows | Anodized Aluminium UPVC (Glazed) with aluminium fixtures |
Internal Doors | Flush doors with maranti hardwood frames |
Others | Copper wiring with adequate switches & sockets |
Additional Features | - |
Walls | 2'-0" ceramic glazed tile dado above counter and oil bound distemper upto ceiling 1v1 |
Ceiling | White wash |
Floors | Non skid ceramic tiles |
External Doors & Windows | Anodized Aluminium UPVC (Glazed) with aluminium fixtures |
Internal Doors | Flush doors with maranti hardwood frames |
Others | Granite/ Marbel counter top, Stainless steel kitchen sink, provision for R.O. system. |
Additional Features | Wooden cabinet below sink |
Walls | Glazed tile dado upto ceiling height |
Ceiling | False ceiling |
Floors | Non skid ceramic tiles |
External Doors & Windows | Anodized Aluminium UPVC (Glazed) with aluminium fixtures |
Internal Doors | Flush doors with maranti hardwood frames |
Others | White sanitary fixtures and CP fittings |
Additional Features | - |
Walls | Oil bound distemper over cement plaster |
Ceiling | White wash |
Floors | Ceramic tiles |
External Doors & Windows | Anodized Aluminium UPVC (Glazed) with aluminium fixtures |
Internal Doors | Flush doors with meranti hardwood frames |
Others | Copper wiring with adequate switches & sockets |
Additional Features | - |
Walls | Texture paint/ Cement paint |
Ceiling | White wash |
Floors | Non skid ceramic tiles |
External Doors & Windows | - |
Internal Doors | - |
Others | MS Railing/ Brick parapet as per elevation |
Additional Features | - |
Eros Sampoornam Phase III is an exclusive gated, secure, impeccably planned residential build out in Noida Extension. Splendid outdoor and indoor spaces, parks, sports facilities and super-marts all a short walk away complete the best living experience at Eros Sampoornam Phase III.
Eros Sampoornam Phase III consists of 2 BHK and 3 BHK premium apartments with the finest textures and finishes. These marvelous Apartments are located at Noida Extension. It is scattered over an area of 12.50 acres. Eros Sampoornam Phase III is meticulously designed and exclusively planned with world class amenities and top line specifications such as 24Hrs Water Supply, 24Hrs Backup Electricity, Badminton Court, Basket Ball Court, Billiards, Club House, Covered Car Parking, Gym, Jogging Track, Landscaped Garden, Lift, Play Area, Rain Water Harvesting, Security Personnel, Skating Rink, Swimming Pool and Tennis Court.
Eros Sampoornam Phase III comprises of unique design that affirms a world-class lifestyle and a prestigious accommodation. Eros Sampoornam Phase III is designed in such a way that these apartments comprises of wide space with proper ventilation at every corner of the house. The interiors are beautifully crafted with designer tiled floor, granite counter slab in kitchen, modern sanitary fittings in the bathroom and huge windows for proper sunlight.
Eros Sampoornam Phase III by Eros Group is meticulously designed with unbound convenience & the best of amenities and are an effortless blend of modernity and elegance.
Address:
Plot No GH-01, Sector-2, Noida Extension,
Greater Noida, Uttar Pradesh
8th floor, Eros Corporate Tower, Nehru Place, New Delhi - 110019, INDIA.
Projects in Greater Noida
Completed Projects |The project is located in Plot No GH-01, Sector-2, Noida Extension, Greater Noida, Uttar Pradesh, INDIA.
Apartment sizes in the project range from 835 sqft to 1560 sqft.
The area of 2 BHK apartments ranges from 835 sqft to 1070 sqft.
The project is spread over an area of 12.50 Acres.
The price of 3 BHK units in the project ranges from Rs. 53.33 Lakhs to Rs. 61.62 Lakhs.