Rs , sq ft

Removed from Shortlist

My Shortlist ()
Keep track of your shortlisted properties here. Shortlist a property to get started.

Barapullah Phase III work gets green signal

Q: The yamuna standing committee has approved the proposal for the third phase of the bridge- discuss

Reply

Replies (3)
1
the plan is to integrate the Metro station as well as the flyover in Mayur Vihar Phase-I, and make it a two-way flyover with loops to facilitate movement in all directions. It is proposed that this 4 lane road will have loops to turn to noida also.
Jewel


2
Hmmm... The bridge will be 3.5 km long and the elevated road will be connecting near to the Mayur Vihar flyover.. this will provide much needed connectivity between east and south Delhi while bypassing the busy ring road.
Imran Khan


@imran , yes it will also ease the traffic on the DND flyway and Nizamuddin bridge and cut travel time between south and east Delhi to less than an hour
Prasad,  Noida
16th May 2014


3
Yes the Yamuna Standing committee has approved the proposal for the bridge which will be constructed on stilts so that the river bed is not disturbed and will connect INA market to Mayur vihar.
Tamal


The bridge it seems will be aligned similar to Pontoon bridge and will begin at sarai kale khan and end near to the mayur vihar phase 1 metro station.
Srishti,  Gurgaon
16th May 2014


4

Ask a Question
120 Characters Left











    CommonFloor Property Search Mobile App now available on Android, iOS and Windows!