Akshardam Bottlneck to be decongested

Q: Hi finally the plans to decongest Akshardam signal has been initiated- discuss

Reply

Replies (2)
1
There has been 2 km traffic jams everyday during peak hours in this stretch between Mayur Vihar and Akshardham Setu.

The reason for the bottleneck as much as i gather is the faulty geometrical construction of the loop from NH24 to climb the Noida flyover towards UP Link road and inadequate weaving space on the slip road going towards Ghaziabad.
Kasturi


Yea kasturi.. it is quite frustrating when traffic from Nizamuddin Bridge comes on a six-lane road and on reaching slip road is merges into a 3 lane road creating this situation.
Shenoy,  Ghaziabad
5th June 2014


2
WOW!!!! finally after years of wait traveling between noida and Ghaziabad on the NH 24 will be smoother with the PWD approving a decongestion plan.
Anis


Syed Pasha
There is a need to shift bus stand, remove toilet block, change the pedestrian crossing signal that was hindering traffic... i was told that some trees needs to be cut and that requires approval which was pending.
Syed Pasha,  Delhi-NCR
5th June 2014