Rs , sq ft

Removed from Shortlist

My Shortlist ()
Keep track of your shortlisted properties here. Shortlist a property to get started.

information on Tolichowki, Kandikal Gate construction status

Q: Hello, a friend told me about the completion of the Tolichowki, Kandikal Gate flyovers in Hyderabad. Since i have to travel a lot, i wanted to know the latest updates regarding the same. Thanks.

Reply

Replies (8)
1
Hey, once opened for the commuting traffic, it is expected to ease congestion on Charminar – Falaknuma - Chandrayanagutta roads and reduce the travelling distance. It will also provide good connectivity between Hyderabad to Shamshabad airport via Barkas.
Sanjay Naidu


2
Here is some information about the rail over bridge, work on this project too has begun in June 2012 and the total length is 837.45 mt, carriageway width: 2x7.0 mt, service road width is 4.50 m, on either sides
Pravallika


3
The GHMC also stated that the Kandikal Gate road over bridge built at a cost of Rs.22 crore too is ready for inauguration. This is really good news for the connectivity of the city, don't you think?
Abdul Zafar


4
Well, like the comment below me stated the project faced a lot of problems, but still the project has been completed. The project was started in November 2013, and is finished, so thats pretty decent by government standards, don't you think?
Ramesh Hegde


5
Did you know that the municipal corporation had to face several hurdles in taking up this flyover, including religious structures on the way, stiff resistance from property owners and also delay in shift of utilities like power lines, water pipelines and sewer lines.
Subash


6
Let me tell you some details about the flyover. It consists of two spans - one from Mehidipatnam to Hi-tec City and second from Hi-tec City to Mehidipatnam to provide hassle-free travel for motorists. Its total length is 770 metres, carriage width is 11 metres and service road width is 7.5 mt
Verma


7
Well. the GHMC Commissioner along with his senior officials inspected the flyover and mentioned that the total project cost of the flyover is Rs.38.41 crore. Seems reaonable enough to me given the magnitude and scale of the flyover.
Sharan Basappa


8
Hey, good news for the connectivity of our city since the Tolichowki flyover has been completed in all respects and would be opened for public shortly by the Chief Minister. This will really help the city in terms of real estate development, don't you think?
Vineet raj


Can someone tell me if the flyover has been properly checked, and also what is the total cost for this project?
Siddarth Mamanthur,  Hyderabad
2nd March 2015


9

Ask a Question
120 Characters Left











    CommonFloor Property Search Mobile App now available on Android, iOS and Windows!