GeneralFRAMED STRUCTURE
R.C.C. framed structure to withstand wind & seismic loads.
SUPER STRUCTURE
First class brick masonry in cement mortar.
PLASTERING
Internal: Double coat cement plaster with smooth finish.
External: Double coat sand faced cement plastering.
DOORS & WINDOWS
Main Door: Best teak woo frames and flush door shutters with teak / play teak vaneer, aesthetically designed with melamine polish and designer hardware of reputed make.
Internal Doors : Teak wood frames and flush door shutters with vaneer, polish and standard hardware.
French Doors: UPVC / Aluminum frame fitted with glass panel and hardware of reputed make.
Windows: UPVC / Aluminum frame fitted with float glass and hardware of reputed make.
PAINTING
External: Premium texture paint.
Interior: Premier emulsion paint with roller finishing for both walls and ceilings.
COMMUNICATION
a) Telephone points in all bedrooms and hall.
b) Video intercom facility connecting all service units and security.
c) Cable T.V: Provision for cable T.V in all bedrooms and living rooms.
ELECTRICAL & COMMUNICATIONS WORKS
Electrical: Concealed copper wiring in conduits of standard make for light, fan and power plug points wherever necessary.
a) Power outlets for air conditioning in all bedrooms.
b) Power outlets for geysers in all bathrooms.
c) Power plugs for cooking range chimney, refrigerator, microwave oven, mixer / grinder in kitchen.
d) Plug points for T.V. audio systems, etc., wherever necessary.
e) 3 phase supply for each unit and individual meter boards.
f) Miniature circuit breakers (MCB) & ECLB for each distribution board of MDS / Merlin Gerin or equivalent make.
g) All electrical fittings of reputed make.
WATER SUPPLY
Water purification plant for providing clean and pure drinking water.
GAS
Provision for cooking gas pipeline to kitchen.
TOILETS
All toilets will consist of
a) EWC with flush tank of reputed make.
b) Hot and cold water mixer with shower of reputed make.
c) Provision for geysers in all toilets.
d) All C.P. fittings of Jaquar or equivalent make.
POWER BACK UP
Back up power through silent generators.
LIFTS
4 Nos, 6 passenger lifts of Kone or Johnson brand / equivalent.
WATER SUPPLY, SANITARY & PLUMBING WORKS
Water supply ISI mark GI/PPR piping executed by professional plumbers.
EXTERNAL LIGHTING
Light posts with lamp fittings, energy saver lights for external staircase and corridor lighting.
COMMON EXTRAS
Standby generator, transformer, car parking, 3-phase power connection, intercom, etc.
VIEW MORE
VIEW LESS