Bangalore
  • Bangalore
  • Mumbai
  • Delhi
  • Pune
  • Chennai
  • Hyderabad
  • Kolkata
  • Ahmedabad

5.17 Cr onwards

  • Total Project Area 34.12 Acres
  • Total Units 245 Units
  • BHK 4 BHK
  • Area (295.8 - 475.66 sq.m)
  • Possession Apr-2028 (Ongoing)
  • Price Range
    All Inclusive With Reg*
    5.17 Cr - 7.45 Cr
  • Property Type Villa
  • Launched Date Nov-2014
  • RERA ID
    RERA detail displayed here, is obtained from the respective State’s RERA website. CommonFloor is an online platform, publishing info “As Is” available on RERA websites.
    PRM/KA/RERA/1251/309/PR/1 ...Show More
  • Loading...

Unit Configuration

Unit Types
Super Built-Up Area
Carpet Area
Price
Floor Plans
4 BHK Villa Availability*: Sold out
3184 - 5120 sq.ft (295.8 - 475.66 sq.m)
NA
5.17 Cr - 7.45 Cr
NA
*Availability Yes/Sold Out depicts Availability with Builder only.Taxes and other charges may apply. Last Updated on 14-Oct-2025

Location

Master Plan

MASTER PLAN

Amenities - Total Environment After The Rain

  • Society
  • 24Hrs Water Supply
  • Badminton Court
  • Bank/ATM
  • Basket Ball Court
  • Billiards
  • Cafeteria
  • Card Games
  • Carrom Board
  • CCTV Cameras
  • Chess
  • Club House
  • Compound
  • Covered Car Parking
  • Gym
  • Indoor Games
  • Landscaped Garden
  • Library
  • Play Area
  • Security Personnel
  • Squash Court
  • Swimming Pool
  • Tennis Court
  • Toddlers Pool
  • Indoor
  • 24Hrs Backup Electricity
  • Fire Alarm
  • Fire Safety
  • Gas Pipeline

Specifications - Total Environment After The Rain

General

STRUCTURE

Shell  

  • RCC frame structure with masonry partitions. The height of each floor shall be 9’6” from slab top to slab top and shall vary based on the profile of the curved roof.

Masonry  

  • High quality exposed brick masonry using specially procured high-strength terracotta wire-cut bricks and/or stone masonry shall be provided for parts of the exterior with deep-set waterproof pointing. For other parts and for the internal walls, terracotta blocks, table molded brick masonry or Aerocon blocks or Concrete block masonry with plaster shall be provided.

FLOORING AND DADO 

Living & Dining

  • Beige coloured imported marble laid with paper joints and finished with 8 coats polish.
  • Kota stone laid with paper joints and finished with 8 coats polish •

Family (V50a)

  • Cut-pile carpet.
  • Kota stone laid with paper joints and finished with 8 coats polish.

Media (V50a)

  • Kota stone laid with paper joints and finished with 8 coats polish.

Kitchen

  • Beige coloured imported marble laid with paper joints and finished with 8 coats polish. Glazed tiles above the counter up to a height of 2'. Counter shall be in granite.
  • Green marble on the floor and counter. Glazed tiles above the counter up to a height of 2'.

Utility

  • Green Marble flooring. No dado or counter shall be provided.

Master Bedroom

  • Kota stone laid with paper joints and finished with 8 coats polish Hardwood flooring.

All Other Bedrooms

  • Kota stone laid with paper joints and finished with 8 coats polish.

Master Bathroom

  • Imported marble on the floor and counter, Marazzi or equivalent tiles on the walls up to 7' in shower area and 3' in other areas.
  • Green marble on the floor and counter, Marazzi or equivalent tiles on the walls up to 7' in shower area and 3' in other areas.

Other Bathrooms

  • Green marble on the floor and counter, Marazzi or equivalent tiles on the walls up to 7' in shower area and 3' in other areas.

Maid’s Room

  • Kota stone laid with paper joints and finished with 8 coats polish.

Maid’s Bathroom

  • Green Marble on the floor and Glazed tiles on the walls upto a height of 7’ 0”.
  • External Deck Engineered Solid wood /Brazilian Ipe Terracotta tiles.

SANITARY FIXTURES

Water Closets

  • Western style, porcelain EWC of Kohler or equivalent make shall be provided in all bathrooms, except the Maid's bathroom which shall be provided with an EWC of Parryware make.

Health Faucets

  • Health faucets of Jaquar or equivalent make shall be provided in all bathrooms.

Wash Basins

  • Porcelain wash basins of Kohler or equivalent make shall be provided in all bathrooms. Parryware wash basin in the Maid's Bathroom. All basins shall be provided with CP waste coupling & CP bottle trap of standard make.
  • Porcelain wash basins of Parryware or equivalent make shall be provided in all bathrooms. All basins shall be provided with CP waste coupling & CP bottle trap of standard make.

Kitchen Sink

  • Stainless steel sink with drain board.

Cockroach Traps

  • A detachable stainless steel cockroach trap with lid of Chilly or equivalent make shall be provided in all bathrooms.

Bathtubs

  • One Bathtub of Parryware / Woven Gold or equivalent make shall be provided in the Master bathroom. One Bathtub of Kohler or equivalent make shall be provided in the Master bathroom.

Shower Cubicles

  • Glass doors shall be provided for the shower area in Master Bathroom and Children's Bathroom.

Overhead Showers

  • Showers of Grohe or equivalent make shall be provided in all bathrooms except the Powder room. A Rain shower of Grohe or equivalent make shall be provided in the Master bath.

Hand Showers

  • Hand showers of Grohe or equivalent make shall be provided in all bathrooms except maid's bathroom & powder room.

Faucets

  • All faucets shall be CP, heavy body metal fittings of Grohe or equivalent make. Hot water connection shall be provided to the shower and wash basin in each bathroom and to the sink in the kitchen.All faucets shall be CP, heavy body metal fittings of Grohe or equivalent make. Hot water connection shall be provided to the shower and wash basin in each bathroom. All faucets shall be CP, heavy body metal fittings of Grohe or equivalent make.

Bathroom Accessories

  • Towel rings &, toilet paper holders in all bathrooms, towel racks and soap dish in Master, Children and Guest Bath. - all of Jaquar or equivalent make shall be provided.

Washing Machine Point

  • One cold water inlet and drainage outlet for a washing machine shall be provided in the Utility.

Plumbing

  • All water supply lines & drainage lines shall be in CPVC pipes. Sewage lines shall be in PVC pipes.

ELECTRICAL

Wiring

  • All wiring shall be of Havells or equivalent make, concealed in PVC conduits.

Switches & Sockets

  • All switches shall be of Crabtree or equivalent make. Apart from the basic light and fan controls, the following number of sockets shall be provided in various rooms:

Living Dining

  • 4 nos - 5 amp switch & socket.

Kitchen

  • 3 nos - 5 amp switch & socket, 4 nos - 15 amp switch and socket

Utility

  • 1 no -5 amp switch & socket, 1 no. -15 amp switch and socket

Master Bedroom

  • 4 nos - 5 amp switch & socket. 2 nos - 5 amp switch & socket

Other Bedrooms

  • 2 nos - 5 amp switch & socket.

Bathrooms

  • 1 no -5 amp switch & socket, 1 no. -15 amp switch and socket.

Family (V50a)

  • 2 nos - 5 amp switch & socket, 1 no - 15 amp switch and socket.

Media Room (V50a)

  • 4 nos - 5 amp switch & socket, 2 nos - 15 amp switch and socket.

Maid’s Room

  • 1 no - 5 amp switch & socket.

Telephone & Data

  • 1 Telephone Point each shall be provided in living and master bedroom. Provision for Fibre to the home (FTTH) connectivity shall be provided.

Television

  • 1 Television Point each shall be provided in either living or family and guest bedroom. Provision for Direct to Home (DTH) connectivity shall be provided.

Light

  • Fixtures No Light fixtures shall be provided anywhere in the home.

Power & Back Up

  • A power connection of 5 KVA shall be provided to each unit. Back-up power shall be provided for the same capacity A power connection of 5 KVA shall be provided to each unit. Back-up power shall be provided for the same capacity. A power connection of 8 KVA shall be provided to each unit. Back-up power shall be provided for the same capacity

HOME AUTOMATION

Main system & Terminal 

  • A home-automation system shall be provided with a main console / terminal with color display control with touch screen for controlling all the automated functions.

Sub-phones

  • A multi-function display performing most of the functions of the main console shall be provided in the Master Bedroom & Family / Living Space.

Occupancy Sensors

  • The main centre light in four bathrooms shall be controlled by occupancy sensors.

Main Door Lock

  • A high quality proximity card based or bio-metric sensor based door lock shall be provided that can be controlled from the main console as well the sub-phones.

Door Camera

  • A colour door camera with call bell facility shall be provided outside the main door.

Motion Detector

  • This shall be provided in a few locations for detecting intrusions.

Magnetic Sensors

  • This shall be provided in all windows, French windows and main door to detect intrusions.

Smoke & Heat Detector

  • This shall be provided in the kitchen.

CABINETRY AND FURNITURE

Kitchen

  • Floor & wall mounted cabinets complete with cutlery tray, vegetable baskets, breakfast counter etc. in laminate of Veneta Cucine or equivalent make shall be provided.

Utility

  • A storage cabinet and a foldable ironing board of Hettich or equivalent make with a heat proof ironing surface shall be provided.

Master Bedroom

  • Double bed with bedside tables, study unit, 3 module walk-in wardrobe.

Master Bathroom

  • Mirror with backing ply and edge trim, louvered shutters below the counter.

Children’s Bedroom

  • 2 single beds with bedside table/s, study unit, 2 module wardrobes.

Other Bedrooms

  • Double bed with bedside tables, 2 module wardrobes, TV unit.

Other Bathrooms

  • Mirror with backing ply and edge trim, excluding Maid's Bathroom.

Family (V50a)

  • TV unit, audio storage cum library unit.

Media Room (V50a)

  • No furniture or cabinetry shall be provided in the Media Room.

Maid’s Room

  • Single cot, half module wardrobe.

Basic Materials

  • All woodwork except for modular units shall be in termite resistant good quality plywood or MDF panels and natural veneer or laminate. Modular units shall be in particle board and veneer or laminate.

Hardware

  • All hardware shall be in brush finished stainless steel of Hettich or equivalent make with soft close system for the drawers in wardrobes and telescopic channels for the drawers in the study units.

Finishing

  • Natural veneer exteriors shall be finished in melamine matt finish and the interiors in laminate.

Mattresses

  • Mattresses shall NOT be provided for any of the beds.

LANDSCAPING

Soil

  • Good quality red soil and sand mixture with manure shall serve as the base layer for landscaping.

Irrigation

  • Sprinklers and a drip irrigation system shall be provided for landscaped areas.

Soft

  • Landscaping Grass, shrubs and bamboo etc. shall be provided and all garden areas shall be completely landscaped. Expensive exotic plants may be provided at additional cost.

Plunge Pool (V50a)

  • A 4' deep pool with Filtration equipment shall be provided along with underwater lights.

FACILITIES AND AMENITIES

Clubhouse Clubhouse with a common space for parties.

Swimming Pool

  • A 4' deep swimming pool with a separate paddle pool for kids.

Gym

  • Commercial low-impact Treadmill, Total body elliptical fitness Crosstrainer, Upright cycle, 4 station Multi-gym, Flat incline, decline Multipurpose Bench, dumbbells.

Sporting Facilities

  • Tennis Court, Badminton, Squash.

UTILITIES / SERVICES

Gas Supply

  • Reticulated gas supply shall be provided to individual units.


VIEW MORE VIEW LESS

Properties in Total Environment After The Rain

About Total Environment After The Rain

Total Environment After The Rain is located in Bangalore and comprises of thoughtfully built Residential Villas. The project is located at a prime address in the prime location of Yelahanka. Total Environment After The Rain is designed with multitude of amenities spread over 34.12 acres of area.

Location Advantages:. The Total Environment After The Rain is strategically located with close proximity to schools, colleges, hospitals, shopping malls, grocery stores, restaurants, recreational centres etc. The complete address of Total Environment After The Rain is Sir MVIT College Road, Yelahanaka, Bangalore, Karnataka, INDIA..

Builder Information:. Total Environment Projects India Private Limited is a leading group in real-estate market in Bangalore. This builder group has earned its name and fame because of timely delivery of world class Residential Villas and quality of material used according to the demands of the customers.

Comforts and Amenities:. The amenities offered in Total Environment After The Rain are 24Hrs Water Supply, 24Hrs Backup Electricity, Badminton Court, Bank/ATM, Basket Ball Court, Billiards, Cafeteria, Card Games, Carrom Board, CCTV Cameras, Chess, Club House, Compound, Covered Car Parking, Fire Alarm, Fire Safety, Gas Pipeline, Gym, Indoor Games, Landscaped Garden, Library, Play Area, Security Personnel, Squash Court, Swimming Pool, Tennis Court and Toddlers Pool.

Construction and Availability Status:. Total Environment After The Rain is currently completed project. For more details, you can also go through updated photo galleries, floor plans, latest offers, street videos, construction videos, reviews and locality info for better understanding of the project. Also, It provides easy connectivity to all other major parts of the city, Bangalore.

Units and interiors:. The multi-storied project offers an array of 4 BHK Villas. Total Environment After The Rain comprises of dedicated wardrobe niches in every room, branded bathroom fittings, space efficient kitchen and a large living space. The dimensions of area included in this property vary from 3184- 5120 square feet each. The interiors are beautifully crafted with all modern and trendy fittings which give these Villas, a contemporary look.

Read More Read Less
The information provided herein have been collected from publicly available sources, and is yet to be verified as per RERA guidelines.*

About The Builder :

We believe that it is the people at Total Environment Projects India Private Limited that make the difference and deliver what our customers need. From our promoters to our craftsmen who work on our buildings, the commitment to quality remains unchanged. We work together as an integrated team from concept to completion. This high degree of interaction between architecture design, structural design and the construction teams, ensures that every little detail gets the close attention it deserves.


Read More Read Less

IMAGINE, No. 78, ITPL Main Road, EPIP Zone, Whitefield, Bangalore-560066, Karnataka, INDIA.

Projects in Bangalore

Completed Projects   |   Ongoing Projects   |  

Home Loans & Legal Approvals

Other project by Total Environment Projects India Private Limited :

Frequently Asked Questions on Total Environment After The Rain

The project is located in Sir MVIT College Road, Yelahanaka, Bangalore, Karnataka, INDIA.

Villa sizes in the project range from 3184 sqft to 5120 sqft.

Yes. Total Environment After The Rain is RERA registered with id PRM/KA/RERA/1251/309/PR/171014/000483, PRM/KA/RERA/1251/309/PR/180519/001763 , PRM/KA/RERA/1251/309/PR/191015/002923, PRM/KA/RERA/1251/309/PR/300322/004795, PRM/KA/RERA/1251/309/PR/160825/008002 (RERA)

The area of 4 BHK apartments ranges from 3184 sqft to 5120 sqft.

The project is spread over an area of 34.12 Acres.

View All

Real Estate Blog

Log in to your account