Priyanka Choudhury

Bangalore-Chennai Expressway design study completed
The Bangalore-Chennai expressway design study was completed in 2013. However, the process of land acquisition is still underway with special teams designated in the three states of Tamil Nadu, Andhra Pradesh and Karnataka, through which the expressway is proposed to be developed. The length of the expressway is about260 kmwith significant progress seen in the past […]
Priyanka Choudhury

An in-depth overview of Metro-BIA route
There was a proposal to build a 33 km high speed rail link from MG Road to Bangalore International Airport at a cost of Rs 57.67 billion but later the five year plan to build a high speed railway connecting Bangalore International Airport to the city is discarded to extend Namma Metro lines till BIAL. […]