Bhubaneswar
  • Bangalore
  • Mumbai
  • Delhi
  • Pune
  • Chennai
  • Hyderabad
  • Kolkata
  • Ahmedabad

Citicon Mahadev Nagar Duplex Phase II

By: Citicon Engineers Limited in Patrapada

25 L onwards

  • Total Units 7 Units
  • BHK 3 BHK
  • Area (185.81 sq.m)
  • Possession Dec-2011 (Ready-to-move)
  • Price Range 25 L
  • Property Type Plot/Villa

Unit Configuration

Unit Types
Super Built-Up Area
Carpet Area
Price
Floor Plans
Plot Availability*: Sold out
2000 sq.ft (185.81 sq.m)
NA
25 L
NA
3 BHK Villa Availability*: Sold out
NA
NA
NA

*Availability Yes/Sold Out depicts Availability with Builder only.Taxes and other charges may apply. Last Updated on 04-Sep-2025

Location

Specifications - Citicon Mahadev Nagar Duplex Phase II

General

Foundation

6" P.C.C. 1:4:8 below brick missionary 1:6 in foundation over sand filling of l' 0" to -6" as per requirement.
Plinth Band
6" thick Plinth band at plinth level using 8mm and 6mm Dia. M.S rod with MI5 Concrete.
Lintel
Continuous lintel will be provided at a height of 7' from the plinth level as per requirement with c.c. 1:2:4 using 1/4" hg chips with ms rod as per design.
Super Structure
The Super Structure will be constructed with K.B. bricks missionary having (1:6) cement mortar for 10" thick walls and 5" thick walls will be with 1:4 cement mortar.
Kitchen/Toilets
  1. Kitchen and toilets will be TN with glazed ceramic tiles of 151 standard.
Roof
R.C.0 roof shall be provided at the height of 10' from plinth level with R.C.C. work of (M20) grade as per required design. (Normally 4'.thick).
Flooring
All floors of bed room, drawing & dinning rooms will have marble Flooring. Bath 8: Kitchen floor shall be of marble. Kitchen cooking platform shall be Granite/Green Marble.
Doors & Windows
All the doorframes & Window frames will be of Sal wood of 4" x 1/2 "Section with factory made shuttered. Main door will be of Teak wood of 3'-6" and other doors will be of 3'-0" except toilets, which will be of 2'-6' width (wall to wall).
Painting
All interior walls shall be furnished with 2 coat cement paint and doors and windows shall be finished with (Asian/Berger) paints of approved quality. Exterior walls shall be coated with cement paints.
Electrical Work
Concealed PVC pipes will be laid in roofs and walls .The wires will be of I.S.I Standard .Other Fittings will be of 1.5.1 standard (Finolex/Havell), Modular Switches- (Anchor/Cona) to be fitted. Other fittings shall be IS! standard.
Sanitary Work
The toilets will have Indian panes with low tap connections. Each toilet has one Towel rail, one soap disc and necessary tap connections.
Water Supply
Common Bore well for water supply.
Other Expenses
Rs. 1,50,000/- (One Lakh Fifty Thousand Only) extra will be paid separate the following works.
1. Over Head Tank-R.CC. Well rings 4'6" height.
2. Boundary Wall - 2'6" height- 5" thick brick wall with 10"x10- pillars at 19' distance over.
3. Two layers of late rite stone missionary 10' width.
4. Soak pit& Septic Tank-as per plan.


VIEW MORE VIEW LESS

Properties in Citicon Mahadev Nagar Duplex Phase II

About Citicon Mahadev Nagar Duplex Phase II

About Project:. Mahadev Nagar Duplex Phase II is an ultimate reflection of the urban chic lifestyle located in Patrapada, Bhubaneswar. The project hosts in its lap exclusively designed Residential Villas, each being an epitome of elegance and simplicity.


About Locality:. Located at Patrapada in Bhubaneswar, Mahadev Nagar Duplex Phase II is inspiring in design, stirring in luxury and enveloped by verdant surroundings. Mahadev Nagar Duplex Phase II is in troupe with many famous schools, hospitals, shopping destinations, tech parks and every civic amenity required, so that you spend less time on the road and more at home.


About Builder:. Mahadev Nagar Duplex Phase II is engineered by internationally renowned architects of Citicon Engineers Limited. The Group has been involved in producing various residential and commercial projects with beautifully crafted interiors as well as exteriors.


Units and Interiors:. Mahadev Nagar Duplex Phase II comprises of 3 BHK Villas that are finely crafted and committed to provide houses with unmatched quality. The Villas are spacious, well ventilated and Vastu compliant.


Amenities and security features:. Mahadev Nagar Duplex Phase II offers an array of world class amenities such as Villas. Besides that proper safety equipments are installed to ensure that you live safely and happily with your family in these apartments at Patrapada.


Read More Read Less
The information provided herein have been collected from publicly available sources, and is yet to be verified as per RERA guidelines.*

About The Builder :

Citicon Engineers Limited is an established & renowned ISO 9001-2008 Certified Real Estate Company & also a Member of CREDAI-Odisha. Within a short span of time it has set up many branches across different parts of Odisha and also even outside OdishaKolkata, Delhi, Surat & Bangalore. Our Projects includes independent Housing Scheme, Apartments, Flats, Residential plotted schemes, Farm Houses, etc. We have been crowned with numerous awards like Utkal Sanman, Jewel of India Award, and Bhartiya Nirman Ratna Awards. CEL is headed by the Charismatic Personality Mr. Antaryami Badu Chairman cum Managing Director a civil engineer & experienced businessman.




Read More Read Less

Plot No- 540, Saheed Nagar, Near Saheed Sporting Club, Bhubaneswar, Odisha, INDIA.

Projects in Bhubaneswar

Completed Projects   |  

Home Loans & Legal Approvals

Frequently Asked Questions on Citicon Mahadev Nagar Duplex Phase II

The project is located in Bhagawanpur, Patrapada, Bhubaneswar, Odisha, INDIA.

The project is spread over an area of 1.00 Acres.

Price of 3 BHK unit in the project is Rs. 25 Lakhs

View All

Real Estate Blog

Log in to your account