The construction of 4-lane bridge over river Brahmaputra including viaduct and its approaches connecting Gohpur on NH-52 and Numaligarh on NH-37 needs to be started immediately. Theer are other projects such as- six-laning of the Guwahati bypass with provision of a 6-lane flyover at Basistha Chariali, developing NH-151 connecting Karimganj to Sutarkandi and NH-53 from Silchar to Jiribam, to construct Malidhar RCC bridge on NH-44 and few more..
CM has told the Union Minister to start construction of two-lane alternate road between Barak Valley (Silchar) to Nellie near Guwahati via Harangajao-Turuk covering a length of 244.235 km under SARDP-NE Phase-‘A’. In this regard, the CM had even held a high-level meeting with the Union Minister. 4-laning works from Nagaon to Holongi (Assam-Arunachal border) will also come up soon.
The work of two national highways also has been declared recently- NH-127B from Srirampur to Phulbari via Dhubri including construction of a bridge over river Brahmaputra. and the other being NH-315A from Tinsukia to Hukanjuri (Assam-Arunachal border) via Naharkotia.
Hi Kaushik, many infrastructure development projects are coming up in Guwahati.. are you asking about which project? Do you want to know about four-laning of NH-37 work?