Q: Hey, i have been facing many problems traffic wise, since the metro construction started. When will the roads be fixed, and what is the government doing about it?
The TS Central Power Distribution Company was also instructed to complete the relocation of overhead power lines at Jubilee Hills check post, Peddamma temple, Madhapur, Madhuranagar, Khairatabad and Nampally on priority. Senior officials of various Government departments were present at the meeting.
Well as far as i know, the traffic in the areas where metro is being constructed is in a very bad shape. So this is a very welcome move on the government's part, and i truly hope that whatever the government has planned work's out.
Hi, Mr. Reddy informed the meeting that with demolition of 27 properties, the total number of properties to be demolished has now come down to 254 (193 private and 61 GVM) and that this process will be accelerated as more and more private owners are now cooperating with the authorities in the implementation of the new Land Acquisition Act.
I wanted to tell you that the Irrigation Department was told to facilitate GHMC and HMR in constructing the bridge. I think it is a very decent move on the government's part to involve the irrigation department.
Yes! even i have some information about the same thing. Hyderabad Collectorate and the GHMC have both encroachted near the proposed third bridge connecting Rangmahal junction and the Mahatma Gandhi Bus Station Imlibun.
Did you know that while presiding over the weekly meeting to oversee the progress of the metro rail work on Tuesday, Mr. Sharma, the chief secretary called for removal of encroachments by the Revenue Department.
The principal secretary of Municipal Administration & Urban Development Department, M.G. Gopal, informed the CS that he had inspected the proposed location of the bridge along with HMR MD N.V.S. Reddy and engineers of RTC. So i think he is the one who is responsible.
Hey, as far i know, L&T Metro Rail Hyderabad (L&TMRLH), constructing the project, has been directed by Chief Secretary Rajiv Sharma to ensure that restoration works were done immediately after the construction to facilitate free flow of traffic across the three corridors.