Q:Can anybody tell me how is the work on the road widening in certain parts of the city going? Also i heard that SCB might demolish some properties to finish the work.Is it true?
Latest Answer: However, if either the Hasmpathpet or Bapuji Nagar roads are closed without easing traffic flow on the Tadbund Road, traffic control could get out of hand, fear SCB officials.
Latest Answer: Let me tell you that once laid, the pipeline would serve the sewage needs of the Secunderabad Cantonment residents for close to 50 years. So in my opinion the public should be patient and wait for the work to get over.
Q:Hey, i'm a daily commuter, and the road network around the city is a bit worrying. I mean is the government planning anything to improve the connectivity around the city?
Latest Answer: The plan works would mainly focus on laying new roads, construction of new bridges, widening and existing of strengthening of existing roads to the present traffic levels. Maintenance and road safety engineering works will also be taken up under plan works.
Q:Hey, i have been facing many problems traffic wise, since the metro construction started. When will the roads be fixed, and what is the government doing about it?
Latest Answer: The TS Central Power Distribution Company was also instructed to complete the relocation of overhead power lines at Jubilee Hills check post, Peddamma temple, Madhapur, Madhuranagar, Khairatabad and Nampally on priority. Senior officials of various Government departments were present at the meeting.
Latest Answer: But I tell you where the problem is. The GHMC is not very god at maintaining communications with other agencies for such works. So we will have to find out how this will pan out. Let's see how that goes.
Q:Hey i'm a citizen of Hyderabad, and just wanted to know what steps the GHMC is taking to ensure that the growing traffic problems in the city are taken care of?
Latest Answer: As per initial estimates prepared, the GHMC looks at earmarking Rs.90 crore for development of Kukatpally-Biodiversity junction, Rs.80 crore for Uppal-Sangeet junction, Rs.95 crore Mallapur-Habsiguda and Rs.140 crore for Hayatnagar-Nalgonda crossroads under the SRDP.
Latest Answer: The SRDP has a Rs. 30,000-crore outlay and will involve development of roads and creation of skyways in a phased manner.GHMC will now resume issue of approvals to building permission applications, after having kept them on hold over the last month.
Q:There has been a lot of water shortages around my area and i was wondering if i could get some updates regarding the Krishna water availability projects 3rd phase.?
Latest Answer: According to what i heard the trial run involves pumping of water in three stages. This quote comes directly form G. Rameshwar Rao who is the director of Hyderabad Metropolitan Water Supply & Sewerage Board.The first sttage of the trial run is now active from what i heard
Q:Hey I have recently heard that a new Hyderabad Pharma city is being established in Hyderabad? Where it is about to come up? Can I have more information on this?
Latest Answer: I bought few plots in 2011, went to see yesterday - of course not much activity though not sure if Pharma city is being considered in that part of the village
Latest Answer: ok...so the HMR is right on track. But the metro authorities are instructed to ensure that no heritage structure is disturbed due to project, especially the Telangana Martyrs' Memorial at Gun park as well as the legislative assembly building and the M.J market. as it is mentioned by the friend, Sultan Bazaar is also another place of heritage value.