Hi Raghu!!! As per Bhubaneswar Development Authority, no multi-storied building shall be allowed to be constructed: A) with approach road less than 18 m. width; B) on plot the size less than 2000 sq-m., and C. within 100 mtrs from the center of the National High way on either side.