Launched: Feb 2010

completed

Possession: Feb 2014

Property Type

Apartment

Location

Sector-76

2 BHK Apartment

1015 - 1150 sq.ft

47.70L - 54.05L

3 BHK Apartment

1455 - 1645 sq.ft

68.38L - 77.31L

4 BHK Apartment

2340 sq.ft

1.09Cr

Guide

User Reviews - Skytech Matrott

This project doesn't have any user reviews as yet.Be the first one to rate this project

MASTER PLAN

Amenities - Skytech Matrott

Health & Fitness :Swimming Pool Tennis Court Badminton Court Basket Ball Court
Community Amenities :24Hr Backup Security Club House
Connectivity :Intercom Wifi

Specifications - Skytech Matrott

Structure :
Earthquake resistant, R.C.C Frame Structure designed by IIT Engrs. (as per IS codes)

Flooring :
Vitrified tiles of (size 2’* 2’) of Kajaria or Equivalent in Drawing, Dining, Kitchen passage & Bed Rooms, Laminated wooden flooring in Master Bedroom and Dress room. Antiskid ceramic tiles in toilets & Balconies

Interior Wall Finish:
Oil bound distemper with pleasing shades on the apartment walls.

P.O.P. :
Designer P.O.P in drawing, dining & bedrooms.

Dado :
Glazed / Ceramic tiles up to 7 feet in the bathrooms in different colors.

Exterior :
Permanent finish.

Kitchen :
Slabs are of well-finished granite stone with stainless steel sink and drain board. Glazed tile dado on wall up to 2 ft. over counter. Complete modular kitchen with R.O. plant.

Doors & Windows :
O.S.T. Teak windows with ISI fitment. Teak flush doors.

Bathrooms
Equipped with ISI Standard washbasins, Mirrors and WCs in varied shades. Chrome plated tap fittings of standard make. Shower Panel.

Electrical :
Electrical (copper) wiring as per IS code with Modular switches. Circuits with MCBs of approved make. TV and telephone points in every room.


PLAN A: DOWN PAYMENT PLAN
At the time of Booking 10% of Total Price
Within 45 Days of booking 85% of Total Price
At the time of Offer of possession 5% of total price IFMS
PLAN B: Flexi CLP Payment Plan
At the time of Booking 10% of Total Price
At the time of Excavation 30% of Total Price
At the time of basement Casting 10% of Total Price
At the time of 3rd Floor Casting ` 10% of Total Price
At the time of 6th Floor Casting 10% of Total Price
At the time of 10th Floor Casting 10% of Total Price
At the time of 14rd Floor Casting 10% of Total Price
At the time of External Plaster 5% of Total Price
At the time of offer of possession

5% of Total Price

OTHER CHARGES
Open Parking 1,75,000/-
Interest Free Maintenance (IFMS) Rs. 40/- Per Sq.Ft.
Fire Fighting Free
Club Membership Free
Power Back-Up Free 1 KVA
Lease Rent Rs.95/- Per Sq.Ft.
PREFERRED LOCATION CHARGES
Central Park Facing Rs. 75/- Per Sq.Ft.
Road Facing Rs. 75/- Per Sq.Ft.

VIEW MORE

VIEW LESS

The SKYTECH GROUP have left their mark on the lives of modern citizens by constructing the houses with the assurance of quality and time bound possession. We have constructed various Residential/Commercial complexes with top quality and Modern amenities. SKYTECH GROUP have made a holistic contributi...Read More

C-60 ,Sector 63, Phase- III, Noida, Near Fortis Hospital, Uttar Pradesh, INDIA.

More About Skytech Matrott

Skytech Group has launched yet another project in Noida. Skytech Matrott is located in Sector-76.

VIEW MORE

VIEW LESS

Approvals & Loans

Bank

ALL MOST ALL BANKS AND FINANCIAL INSTITUTES

Compare Interest Rates

Real Estate Guide


Rate this Project(All fields are mandatory)

Flat quality
Poor
Average
Good
Very Good
Excellent
Project Amenities
Poor
Average
Good
Very Good
Excellent
Builder Score
Poor
Average
Good
Very Good
Excellent
Neighborhood Livability
Poor
Average
Good
Very Good
Excellent
You are a
*Minimum 50 characters
Submit