GeneralFOUNDATIONS & STRUCTURE:
RCC Pile Foundations and bearing walls of Ground, First and Second Floor.
WINDOWS:
Imported UPVC open able/sliding Windows with pinned Glass.
DOORS:
Main Door – teak door frames and teak shutters & toilet doors – PVC(Sintex) -Shutters, frames, Bed Rooms & Balcony door – Seasoned Country Wood Frames with hard core waterproof flush doors.
FLOORING:
Vitrified tiles (24â€x24â€) for all areas with plain colour tiles. Glazed Tile Wall Dado up to Height of Four Feet above cooking platform for the Total length of Ten Feet and Seven Feet Height Wall Dado in the Toilet Walls Using plain colours Glazed Tile (10â€x12â€) and all other stair landing areas with Ceramic/Shaped Tile with plain colour Tiles and (All Tiles are Economy Series).
KITCHEN:
Red/black Granite Table Top in Kitchen with Red/black Granite Sink Total to a length of (10'x2') with one Exhaust Fan Hole.
SANITARY FITTINGS:
Attached Toilet with one Wall Mixer(jaquar/paryware), Over Head Shower, one Geyser Connection (any one Toilet per Flat), One Health Facet near Closet, Wash Basin & Western Water Closets (White) with LLC and one Indian Water Closet (White) without LLC for Common Toilet.
ELECTRICAL:
PVC conduits concealed wiring with quality ISI (Finolex) branded wires and Litaski Brand switches with Pre-laminated Hylam sheet in all rooms the electrical point provision (without fittings) for the following. 1. Hall & Dinning: Two fan, one chandelier, two light points with one TV and Tel., one 5Amps plug., Calling Bell. 2. Bed Rooms: One fan, two light, one A/c plug provision for Split unit (Master Bed Room Only) and one 5Amps Plug. 3. Kitchen: One exhaust fan, two light and Two- 5 & 15Amps points. 4. Toilets: One light, one geyser and exhaust fan point. 5. Ups Line For hall, Dinning, bed rooms and kitchen(One Light & One Fan Point)
WARD ROBES/ CUP BOARDS:
Open type - 4 ft* 18 * 7ft in all bedrooms/s with cuddapah slabs (3 nos) without shutters.
WATER SUPPLY:
Metro water from underground sump (5,000 lts), to kitchen Sink & Bore well (120') water supply to the Toilets and Kitchen sink, through common Over Head Tank.
DEPOSITS:
All deposits to TNEB, CMWSSB , Land Registration & Property Tax expenses would be additional.
PAYMENTS TERMS:
Booking = 25%, Basement = 20%, Roof level / UDS Regn. = 20%, Brick Work = 20%, Flooring = 10% Occupation = 5%.
FINISHING:
One coat of primer and two coats of Emulsion paint to walls and three coats of white cement to ceiling.one coat of wood primer and two coats of synthetic enamel paints to all wooden doors and grills(All materials-Asian).