Construction of elevated corridor between Jnanabharathi and Old Airport Road

Q: Hi, How this project going to impact on the real estate of this area? Has the construction already started?

Reply

Replies (3)
1
The proposed Elevated corridor from Jnanabharathi to Varthurkodi involve a stretch of 28 kms along the ring road from Tumkur to Mysore. The proposed elevated corridor is proposed to start from the Jnanabharathi (A) and connect to Varthurkodi via Sirsi circle (B), Town Hall (C), Hudson circle (D), Vellara junction (E), and Old Airport Road (F).
Mithilesh Roy


2
The impact of the elevated signal free corridor between Jnanabharathi and Old Airport Road is going to be largely positive. No the construction has not started although the feasibility report has been approved by the BBMP. There are delays are the tenders announced by BBMP did not receive a positive response from builders and developers. The cost estimated by the builders has been way too high than the cost expectations of the BBMP. The negotiations between officials of BBMP and builders have failed. Either the BBMP will issue new tenders or they may cancel the project. There is a lot of uncertainty as of now and the overall sentiment is quite negative.
Dilip Joshi


What are the components of the project?
Janak Desai,  Bangalore
31st July 2013


Components of the Project
The construction of elevated corridor along the identified alignment will include the following:

• Widening of roads

• Pavement improvement

• Provision and relocation of concealed drainage under the pavements on either side of the roads

• Overlay treatment

• Improvement of junctions

• Provision of crash barriers

• Road and overhead signage

• Upgrade of 4 lane carriageways
Manjunath,  Bangalore
31st July 2013


3
The construction of elevated corridor between Jnanabharathi and Old Airport Road is part of the five signal free corridors which were planned as pride of Bangalore. The project has been delayed although the first feasibility report conducted in the middle of 2012 was passed. The Nayandahalli junction is congested with vehicles entering Bangalore city from Mysore. The proposed corridor is envisaged to ease the traffic flow and result in unhindered traffic movement along this route. The estimated cost of the project was calculated to be around Rs. 2800 crores. The Bruhat Bengaluru Mahanagara Palike (BBMP) invited tenders for the five signal-free corridors but the submitted bids have been lower than expected. BBMP officials are likely to announce new bids for the project as well as the other four signal free corridors.
Mithilesh Roy


The corridor will pass through Sirsi Circlr, Town Hall, Huidson Circle, Vellara Junction and Old Airport Road. This is will definately have positive impact on the real estate market in these area.
Dilip Joshi,  Bangalore
31st July 2013


Will the elevated corridor ease the traffic problem in that stretch
Rajkumar,  Bangalore
31st July 2013


The Nayandahalli junction is congested with vehicles entering Bangalore city from Mysore via SH-17 adding to the chaos along this stretch. The proposed corridor is expected to ease the traffic flow and result in unhindered traffic movement along this route.
Manjunath,  Bangalore
31st July 2013