Vardhaman vatika projects.

Replies (82)
1
Hi all,
My advise to you all that we need to approach him in a proper manner and right spirit and he wouldsurely listen. This builder has past good records I don't think this is his last project so he would not spoil his name and business. Please approach him in right spirit. What we hear always is not correct. So, taking any further step we should make sure that what is wrong or right.
Vatsa Suman


Hi Suman,

I am not sure in which regard you are talking about. But if it is for contructing road, then let me tell you that I had visited the site 2 weeks back & Punita told me that they are going to construct road after completeion of site.

Let me know if anybody listened anything else on it.

Regards
Kedar Thatte
11th August 2014


Hi Kedar,

Had same discussion and once rain stop they are going to start road construction work,and already PCMC team visited 2-3 times for possession related work and they are planing to give us possession letter with flat possession but it may be not in Sept probably oct may come for this.

Regards
Anant Borse
15th August 2014


Hi Vatsa Suman,

In my opinion, first try to understand the actual problem of delay. Still if you guys are planning to approach legally, then no need to hurry. Discuss with an advocate or lawyer. Let the lawyer check all legal documents. Then as per your lawyer you ca serve a legal notice to developer regarding your issue.
19th November 2014


2
I am new to this.. Please add me, just book flat in Vardhaman vatika.. email : ashu1312@gmail.com
ashish yelne


3
pravin.kae85@gmail.com please add me also
pravin


4
Builder is not ready to construct the road now.. I think we need to pressurize him together.
dhiraj gawande


we need to get it done from builder even Street light will be required which he will not do as road is also not done
pravin, Apartment Resident 
26th June 2014


How come when I was last meet with him, he told me he will develop the road.

Dhiraj what is your mail id I will add you in our Vatikans mail trail. Or you can add following facebook page..
https://www.facebook.com/groups/vardhamanvatikapuneresidents
Sandip ,  Pune
26th June 2014


Please add me in group
pravin.kale85@gmail.com
pravin, Apartment Resident 
27th June 2014


Hi Guys, don't get negative for every point, and I am sure he will do what he has promised. We need to approach him in right way and right spirit and he would listen. This builder has past good records I don't think this is his last project so he would not spoil his name and business. Please approach him in right spirit.
Manish,  Pune
27th June 2014


Manish you are right. Since last time we had bad experience people here is providing some kind of wrong information and when we reached at site and discussed with builder, he also come with us to check flat work and we almost 8-10 flats check and nothing we found as discussed in email. and no one is there to discuss with build only couple of guys, So please confirm twice before putting comments. and still couple of months for complete all work.
28th June 2014


HI All,

Could you please add me in the google group. My email id is kthatte@eaton.com.

Just an update - I recently visited the site. They have planted trees around the site along the compound side. Created boundry for garden. Both lifts are placed (2BHK side) but not yet working.

Regards
Kedar
28th July 2014


Hi,

Please ignore my email id above. Please add me with kthatte@gmail.com

Thanks
Kedar
28th July 2014


5
Hi there.. in wake of camp cola, pune wakad has come in limelight as read in pune mirror yesterday.. omega paradise in wakad has lost it's NA status as builder gave fraudulent documents...
http://www.punemirror.in/pune/cover-story/Residents-of-Wakad-hsg-society-get-a-taste-Campa-Cola-taste-of-Campa-Cola/articleshow/35962926.cms
rakesh kamble


6
Hi All ,
Please join facebook group 'https://www.facebook.com/groups/vardhamanvatikapuneresidents/'..It will make communication far easy and we can share the details
Bhushan


Bhushan Thanks for Sharing....!
Sandip ,  Pune
9th April 2014


7
Builder is using following brand of wire for concealed fiting in-house.if any one wants to change, pls check if electrical fitting for your flat is not done, you can change.
http://www.universalwires.com/index.html
Bhushan


8
hello all, did anyone visit site recently? Any updates?
Is builder going to construct the internal road before said possession date?
Bhushan


I visited the site recently and builder says he and other builder is going to do that.
Aditya Katoch, Apartment Resident 
24th March 2014


I have visited 3days back.. and he said no need to built d road as it will be used by others builders and will not long last..
dhiraj gawande, Apartment Resident 
26th June 2014


9
Hi, pls add me katochaditya@gmail.com
Aditya Katoch


10
Should we meet on coming saturday/sunday? Please suggest
Bhushan


11
Hi,
With respect to above comment, I guess many of us have faced similar experience.
Let all of us meet in week end and sort out the matter.
Also electrical feetings are going on, currently.
Does any body have idea what quality/brand of switches and wires builder is using in concealed electrical feeting?
Bhushan


12
Hi All,

Just wanted to add to the above, builder have not used the colour combination of snti skid tiles he showed in sample flat...

Regards
Kedar A Thatte
kedar thatte


but now those who have already booked flats those people don't have any option other than waiting and take flats ownership...
pritam,  
23rd January 2014


13
Hi All,

I am Kedar A Thatte bought flat in Vatika & recently I visited the site.
The work is going smoothly. While looking at the work I found that they started installing main door for all flats. In the specification they mentioned that they will provide the brass fitting for main door but they are not using the same, & it is the ame for all. Even I found that the boundry (adjacent to Sukhewani property)shifted inside than previously showed due to which the common area got reduced by around 1000 sq.feet.

Does anybody has any idea about these alterations. Builder has not intimated these things to me.

Just let me know if yo have any update.

Thanks
Kedar A Thatte
kedar thatte


I went some days before on site for inquiry ,because I wanted to book flat but now by looking construction quality and Builders attitude I really feel those who booked flats there did big mistake.. and its suggestion for builder if he want to maintain his name then he should not act like this.
pritam,  
23rd January 2014


14
Hi All,

Please join facebook group:

https://www.facebook.com/groups/vardhamanvatikapuneresidents/

Manish
Manish


15
Hi All,

I created a google group for all of us and sent invite to all. If I have missed anyone please join the forum by going to below link:

https://groups.google.com/forum/#!forum/vardhamanvatikapuneresidents

With this we can create a common place to store our information and communication etc.

Regards,
Manish Pandey
Manish


16
My email address is bhushanladdad@gmail.com

Thanks
Bhushan
9766362907
Bhushan


17
Hi All,

I am Kedar Thatte & my e mail address is ka_thatte@yahoo.com.

Regards
Kedar A Thatte
kedar thatte


18
there is one group created https://www.facebook.com/groups/532855000117826/?ref=br_rs
.. i dont know who is owner of this group
Vijay Sonawane


I don't think this is valid group. Will create a new group in facebook with photos and share you all. Then you can join the group.
Manish,  Pune
9th January 2014


19
is there any facebook page created vardhman vatika flat owners?
Bhushan


20
Hi All,Video shown on commonfloor website about Vardhman Vatika is saying that, builder will provide intercom, garbage system and meditation centre.Is this correct?ThanksBhushan9766362907 -
Bhushan


21
Lets meet to discuss about POSSESION DATE...
Amit Pathak


what you all will discuss about possesion date ? As per all your updates possession will be on sept2014 right ?
pritam,  
29th November 2013


you are right Pritam, but may be Amit wanted to sync with all. Sorry guys I am not in Pune otherwise would have joined.

In my last visit I was also told that possession will be in Sep'14. Long way to go. My flat is in 3rd floor so already paid 95% and full EMI started :)

I liked the house very much after seeing the sample flat so very excited and waiting for the day to come to start using :)
Manish,  Pune
29th November 2013


Hi Amit, I think we should talk to builder about the POSSESION DATE the sooner the better. He has mentioned as September 2014 in the agreement we should push for atleast May 2014.
Currently though the whole structure of the building is ready, but the the internal work is very slow.
Also recently I asked to the lady that sits in the office below the building, she said me that unless they get the completion certificate they will not give the possession.
So let us all meetup to discuss the same.
Ameet,  
2nd December 2013


Hi Manish,
you haev not replied to mine comments..do u think builder will give possesion on time... till time no progress. previously builder was saying he will give possesion till may end but now dont think so he will give possesion till sept end also...
pritam,  
6th January 2014


22
Hi All,

I visited the site on 11-Nov and was very pleased to see how the flats are coming up. I personally was also please looking at the construction quality. I have taken some pictures of sample flat and can share with anyone who is interested. Just let me know.
Manish


ok . can you share those pics ,my MailId :sheti.pritam@gmail.com . So that can get fair idea about the project and construction quality .
pritam,  
21st November 2013


Manish, Will really appreciate if you can share with me too kureellalit@gmail.com
Lalit Kureel, Apartment Resident 
21st November 2013


please sent me also on shewale.sandip@gmail.com
Sandip ,  Pune
22nd November 2013


please send me on svnit.rakesh@gmail.com
rakesh kamble, Apartment Resident, Pune
23rd November 2013


Hi All, I sent you photos link on your e-mails.
Manish,  Pune
29th November 2013


Thanks Manish for the photos.
Ameet,  
2nd December 2013


Hi Manish,
I have recently visited site , but I noticed that construction is almost stop . Max to max 1 or 2 labors are working . till date flooring , drainage , water feting, light feting , painting , etc , almost everything other than slap and brickwork is pending... how come builder will be saying he will give possession in sept 2014 ? almost the people who have booked before 1 year and so ,they had already paid 85% minimum payment . In fact show flats work should be with proper finishing but its not like that.. what are your opinion on that ? will builder give possession on time ?even contractor also not available there... the persons who has taken loan for paying builders money and if not getting possesion on time how they suffer cant imagine ......
pritam,  
9th December 2013


23
Hi Sandeep, Pritam
When asked to builder about still parking(reserved parking under building) he said you will get it and obviously yes he going to mention this in agreement.
Actually taking parking amount as white money is not legally possible, hence builder is demanding that money in black as development charges.
About road, sales guys are saying they will develop internal road and hand this over to PCMC. Considering new projects coming in the neighborhood. I think builders might develop road combinly.
suyash.temp


24
yes I have seen that site .. but in coming years any chances of developing that area ? and is builder commited about the roads and lights to anyone ?and who told you "once you booked they will not agree with their parking commitment" because he mentioned in agreement that you will get covered or reserved parking as you have purchased and In every project parkings are charged explicitely right? and its not added in your agrrement value . many builders doing the same thing right ?
pritam


There is 50 meter road being planned in city planning right behind Phase 2. Sukhwani developers as the plat right after the road dead end between phase 1 and phase 2 of vatika. That area is just 2 KM from Dange Chowk and bound to shoot high in coming time.
Manish,  Pune
21st November 2013


25
Hi Suyash
I have cancelled flat in Vatika because of parking issue, once you booked they will not agree with their parking commitment also they will ask you some part of payment in cash.... what is the psf rate you got?

Hi Pritam
Connectivity is not that much easy... visit the site during night you will get an idea....
Sandeep Patil


Sandeep,

Can not comment as this is your personal decision but that is how every developer deals with parking space. They will allocate parking only at the final stage of project after parking drawings are made final. 80% of the developers in Pune are charging for parking.

Connectivity for this area is not good today, but what about 2 years from now? Did you know people used to call Pimple Saudager as dessert just 8 years ago when I came to Pune.

Also, do you know that there are total 5 major project to be open surrounding Vardhman Vatika and they are not started just because builders are busy at other site and waiting for this area to develop to get more money.
Manish,  Pune
21st November 2013


26
Hi All,
I m also thinking to book 2bhk flat in vatika project ? can anyone tell me what is the current rate going on ? and is this site location is good considering connectivity and all ?waiting for reply....
pritam


Last time when went to office they said 4500/sqft. But better you check by either visiting the site or calling them. I really liked the way site is coming up.
Manish,  Pune
21st November 2013


27
Hi All,
Recently i inquired about 2 hbk in Vatika, First they are saying covered parking is full, but after talking to builder, he said, we have allocated just 52 covered parking under building..we still have few more parking available..and he is charging 1.5 lac more for it.
Does anybody has any idea about it ? Please guide me
suyash.temp


28
Does anyone know, what are current rate/ price going on psqft?? maybe whoever has booked latest may share if he/she wants to..
Lalit Kureel


29
Hi All

Has anybody taken open parking as I have booked recently they are saying no covered parking available and do they mention open parking as reserved open in agreement since they have said they will give reserved open parking. Please guide me here.
Sandeep Patil


which one you booked 1Bhk or 2Bhk...
for 1Bhk there is reserved opened parking
Sandip ,  Pune
7th October 2013


2bhk still he is saying parking is full
Sandeep Patil, Apartment Resident, Mumbai
9th October 2013


30
anybody booked flat on 8th floor ?
Vijay Sonawane


31
Will really appreciate if anyone can update the status of construction
Lalit
Lalit Kureel


Slab upto 8th floor is done, now brick work is started above 5th floor.
Also as you know Sample flat is ready.
Your flat is on which floor ?
Sandip ,  Pune
3rd October 2013


Thanks Sandip for the updates. Mine is 8th, what about yours? So, what is your expected date for possession.
Lalit Kureel, Apartment Resident 
4th October 2013


As per writing possession on Sept-14 now lets see.
Do you know other who booked flat on 8th floor coz, I have to confirm that how many people booked flat on 8th floor.
Sandip ,  Pune
4th October 2013


32
Dear All,
Will you please inform or reply back to me that how many of you booked flats on 8th floor.?
Sandip


33
visited recently.. sample flat is ready at site
rakesh kamble


Wow, which one 1BHK or 2BHK and What do you think after seeing it... Good, Better,Best... :-) ?
Sandip ,  Pune
7th August 2013


34
incident about a labor at site was really sad.. does anybody know how did this happen.. is the situation ok now or is there any impact on construction..
rakesh kamble


situation back to normal
23rd June 2013


35
good to c u all guys in common floor
Ajit Kumar


36
Hi prithvi .. this is Ajit here ..i have also my flat at 5th floor..
Ajit Kumar


Hi Ajit,My mail Id is mohiteprithviraj13@gmail.com...
prithviraj,  Pimpri-Chinchwad
17th June 2013


37
Hi Lalit..yes you may go ahead with cash payment for registration.. you will get original copy of registration copy once u will done with ur registration..u may go ahead for the same.
Ajit Kumar


Thanks Ajit
Lalit Kureel, Apartment Resident 
15th June 2013


38
pls reply with e mail address..we need to create yahoogroup mail address
Amit Pathak


I am Lalit , My id is kureellalit@gmail.com
Lalit Kureel, Apartment Resident 
14th June 2013


Ajit here , ajit.ust@gmail.com
15th June 2013


yes, one labour fell down from 5th floor and unfortunately he got spot death.. may his soul rest in peace
15th June 2013


Hi prithvi .. this is Ajit here ..i have also my flat at 5th floor..
15th June 2013


Hi Lalit..yes you may go ahead with cash payment for registration.. you will get original copy of registration copy once u will done with ur registration..u may go ahead for the same.
15th June 2013


bedi.roshan@gmail.com
bedi.roshan@gmail.com
Roshan Bedi, Apartment Resident 
15th June 2013


Hi I am Ameet and my mail id is kasliwalameet@gmail.com
Ameet,  
16th June 2013


If you are the owner or resident of apartment then you can join the owners group of the same and discuss with other owners/residents of the project in the group. To join click Owners Group.
17th June 2013


amit, my email id is svnit.rakesh@gmail.com
rakesh kamble, Apartment Resident, Pune
18th June 2013


mine is vinod.borse@gmail.com
Vinod Borse,  Pune
27th June 2013


mine is prashant.r.agrawal@outlook.com
4th July 2013


Hi... I have booked flat on 4th floor.... please add me in group mail... psandeep85@gmail.com
Sandeep Patil, Apartment Resident, Mumbai
5th October 2013


39
Hello Friends This is Prithvi ,I have booked flat on fifth floor.I got information yesterday that ther was accident on site which cause death of one worker.Is it true???
prithviraj


What was the accident? Can someone who is in local area visit and get more details?
Manish,  Pune
14th June 2013


yes..one labour unfortunately fell down.....Pl reply with your email address..we need to create the yahoogroup.
14th June 2013


40
For 1 bhk , they are giving open parking . Is it true with everyone?
Lalit Kureel


Yes, it is true..
Sandip ,  Pune
11th June 2013


41
Hello Everyone, Can you please suggest, what was the mode of Payment for Stamp duty + Parking charges, when you did the agreement?? Builder is asking me for Cash payment for stamp duty+Parking. If you have paid via Cash only. What kind of receipt you received from him. Please share
Lalit Kureel


Both will be cash. For stamp duty you will get receipt from registrar office (accept for advocate fee). For parking there will be no receipt, check with sharma ji that it is confirmed that is.
Manish,  Pune
17th May 2013


42
Hi All,
Hope you guys and families are doing well. Has someone visited the site recently and see what is the progress? I am not in Pune so can not do that myself hence checking here.
Manish


brickwork was done till 5th floor and plastering was done for all 1st floor flats around a week back..progress seems ok..
rakesh kamble, Apartment Resident, Pune
13th May 2013


Thanks Rakesh, I would urge to all that when you visit, just keep everyone posted here about the progress. Hope the work will be finished on time and we will get our flats soon :)
Manish,  Pune
17th May 2013


43
Hi I am Ashok Mane, I am also going to book the flat 2BHK. Is there any problem for agreement as Lalit mentioned? Please share if any. what will be the current rate?
ASHOK MANE


As per my experience, there is no issue with Agreement. I also booked 1BHK on 7th floor and my Agreement done smoothly 2 months ago.
So there is no issue regarding Agreement procedure.
It is better for you, your home loan will start accordingly.
Sandip ,  Pune
13th May 2013


44
Hi Guys,Nice to see a wonderful forum. My name is Lalit , I have booked flat on 8th floor around 7 months ago. Would like to be part of this forum My id is kureellalit@gmail.com
I am following Sharma Ji since 6 months to know agreement date for 8th floor but i haven't received any straight reply on same. Does anyone have any idea on this , please suggest
Lalit Kureel


45
Hi Vilas, Sorry for late. Please take my email id as vivek.mhasavekar@yahoo.com
vivek mhasavekar


46
Hi All, I wanted to know from those who have booked flat here, how is the payment schedule happening with each of you. Is it going according to the one that is mentioned in the agreement means based on progress.
Actually I have booked a flat on first floor and now the builder is doing plaster work for my flat and he is demanding the payment(10%) for the plaster work even though the exterior plaster is still to remaining.
Can you people share your experiences. My cell no is 9960688776.
Ameet


yes, mine is also on first floor and sharmaji has told me that as soon as internal plaster is done he will be sending demand letter...
rakesh kamble, Apartment Resident, Pune
3rd April 2013


47
As i visited last at site, saw 2 new projects are coming in around, sukhawani bulder is setting up infront of vatika site(beside the last turn, where gaavwale dump garbage), another one set up infront of sales office. hope this will make the road way more better, they should cover the canal as well..
rakesh kamble


Hi rakesh, I just wanted to know is this new project launched by Sukhwani.
2nd May 2013


this is from vardhaman developers.. refer vardhaman heights in pimple saudagar.. this is not sukhwani's.. infact sukhwani is now setting up 2 projects beside vardhman's sales office...
rakesh kamble, Apartment Resident, Pune
22nd June 2013


48
Hi, First of all thanks to all who are spreading information of this project.
I am planning to buy 2bhk in this project ..can you please help me.
Can you please tell me at what rate should i negotiate and if any body has any contact that one can give me less rate then pls pls share me.Thanks a lot.
My no is 9975589046.
Thanks in advance..
prashant


49
Hi All, I will be preparing e-mail distributing list for all members. Please post your mail IDs here who will be interested. My email ID is vilas_shendge@yahoo.co.in
Vilas Shendge


Hi Vilas, My Eamil id ananthaborse@gmail.com
9th February 2013


Hi Vilas i have sent my e-mail ID to your id directly.
Manish,  Pune
9th February 2013


Hi Vilas, My email id is rahulhkhairnar@gmail.com
rahul,  
9th February 2013


Hi Vilas my email id is kasliwalameet@gmail.com
Ameet,  
11th February 2013


Hi Vilas my email id is svnit.rakesh@gmail.com
rakesh kamble, Apartment Resident, Pune
11th February 2013


Hi All, thanks for your response. I will wait till this weekend in hope to see few more replies.Otherwise we can go ahead.
Vilas Shendge, Apartment Resident, Pimpri-Chinchwad
12th February 2013


Hi Vilas Plz note my email id is vishalkurmi@gmail.com
Vishal Kurmi,  Akola
24th February 2013


my id ajit.ust@gmail.com
15th June 2013


If you are the owner or resident of apartment then you can join the owners group of the same and discuss with other owners/residents of the project in the group. To join click Owners Group.
17th June 2013


Pl add me katochaditya@gmail.com
Aditya Katoch, Apartment Resident 
22nd March 2014


50
can anybody give SBI home loan agent's contact, it will be good if he is recommended by Sharmaji..
rakesh kamble


Hi Rakesh they are not giving NOC for SBI. Giving reason as SBI takes a lot of time for disbursement I myself had applied for a loan with SBI...but in the end after registration they refused to give NOC for SBI. Then I had to move to HDFC. I would advise you take in writing from them that they will give NOC for SBI only then go ahead with registration. I have faced a lot of issues with them.
Ameet,  
6th February 2013


ok, so there are nil chances of getting loan done with sbi..
hdfc, lic and axis are the available options..
rakesh kamble, Apartment Resident, Pune
6th February 2013


51
We need to see sample flat now...
Amit Pathak


Punita, lady who sits beside Sharmaji has mentioned that there is a plan to get sample flat ready withing next 5-6 months.
rakesh kamble, Apartment Resident, Pune
11th February 2013


52
Hi All, Today I received call from Sharmaji. He informed that all 8 floor had been approved by PCMC. He asked me to proceed for agreement for my flat on 7th floor. Does anybody got similar call and gone ahead for agreement for flats on 6th floor onwards?
Vilas Shendge


Yes, I also got the same call, you have to first take details from Sharmaji, then you have to process for Loan
Sandip ,  Pune
28th January 2013


Not sure about now, but in past Jagdish from SBI was doing for this project. Sharma ji can give you number for him.
Manish,  Pune
9th February 2013


I would like to suggest , plez get an enquiry from bank regarding the approval for each floor ..
15th June 2013


53
Hi All, I have recently booked a 2bhk at vardhaman vatika.. nice to see already we are having a platform to discuss.. if there is any DL please add my mail id svnit.rakesh@gmail.com
Thanks.
rakesh kamble


On which Floor and what Rate ?
Sandip ,  Pune
25th January 2013


Hi Sandip, got the rate 4075 psf,ongoing rate is 4200 psf. Its A wing, first floor. As discussed above there is no B wing now, its being treated as A wing only. Sharmaji mentioned that all floors at all wings have been already approved. I have few queries. my mob number is 8806660541, kindly provide me your contact. Thanks.
rakesh kamble, Apartment Resident, Pune
25th January 2013


Okay, my mobile number is 9960464435
Sandip ,  Pune
28th January 2013


54
Hi Guys, just now I had talk to my HDFC loan managerr and he said till now plan copy has not been provided to HDFC bank and it is not yet updated on system so builder i.e Mr Prakash has to submit their plan to Mr Chetan from HDFC technical and legal department. Once it will get updated in HDFC system then only disbursement can be done. When I talked to Mr Prakash Chajjed, he told me that he will submit their plan by tomorrow, so we can follow with him by tomorrow whether he has submitted the PLAN COPY to hdfc bank.
Ajit Kumar


Hi Ajit, did you get plan copy for 5th floor?
rahul,  
22nd November 2012


55
Atul what is your mobile no. Since we still not received the sanction plan of 5th floor. Hence above 5th Floor all Bank transactions are on Hold. HDFC has only approved 4TH FLOOR. SBI Only Approved up to 4TH FLOOR. Above 4th Floor no saction by Banks.
Amit Pathak


hi amit, 9970953529 this is my mobile number. I got the VAT letter, NOC , DEMAND LETTER only. Sharmaji told me that they had given the PLAN COPY to the agent.( I have approached Mr.Chaudhari for the loan case) but the agent told me that he has not yet received it,may be he will be getting it in next week.
atul,  Pune
3rd November 2012


Hi Guys, just now I had talk to my HDFC loan managerr and he said till now plan copy has not been provided to HDFC bank and it is not yet updated on system so builder i.e Mr Prakash has to submit their plan to Mr Chetan from HDFC technical and legal department. Once it will get updated in HDFC system then only disbursement can be done.
When I talked to Mr Prakash Chajjed, he told me that he will submit their plan by tomorrow, so we can follow with him by tomorrow whether he has submitted the PLAN COPY to hdfc bank.
6th November 2012


56
Hello everyone I am Atul I have booked my flat A wing 5th floor in the month of JULY. I have done the agreement 2 months before i.e in the month of AUGUST. Anybody got the PLAN COPY, NOC, VAT LETTER from the builder? I got the above documents today (almost after 2 months). Now the builders person has asked me for the further payment within 10 days. But as per my enquiry the process of loan sanctioning may take almost 1 month...Anybbody done with the loan case from SBI ?? How much time it takes n do the builder co-operates with us for this time span?? I request all of u to enlight me with the above queries...
atul


I have done the booking on 3rd floor and my loan is done with SBI. It takes about 3-4 weeks from the day you submit all your papers with SBI for processing.

No issue with SBI loan, this property is preapproved.

Also, yes you need all those documents (PLan copy, NOC, VAT letter etc for loan processing)

The builder will cooperate with you in all steps, no issues at all. Even they will help you find right agent for any bank you want to go for loan i.e., SBI, HDFC etc. Ask Sharma ji from office, he will help you.
Manish,  Pune
1st November 2012


hi manish, yes sharmaji has told me abt the agent n my loan case proceedings r getting done by him only..but yesterday i got the demand letter with all other documents..n it is written over that letter that i have to give the installment within 10 days otherwise intrest will be charged by the rate of 24%... but as u said loan case will take 3-4 weeks..so my query is that wheather the builder will co-operate for this 3-4 weeks?? Though I was ready with my documents the delay is there because i got the PLAN COPY, NOC n VAT LETTER late from the builder's side in this case I am expecting mutual understanding.If I was waiting for the documents for 2 months builder should also wait till the loan process completes..what is your experience??
atul,  Pune
2nd November 2012


Well do not worry too much about that 10 days notice. That is standard text and not very hard and fast. If you start processing genuinely, they will wait some more time for you. Also, I was not aware about the floor wise sanctions. May be you get in touch with Amit Pathak... he might have more detail. If something is not approved, then it is not your fault and they will not hold you responsible for that. You can contact the Agents and keep your papers ready. As soon as it is approved, then loan will be processed faster

Plus, you can always directly ask the status to the builder office, they will help you.
Manish,  Pune
2nd November 2012


Hi Atul, how is your loan process going on ? Is your loan Sanctioned from SBI ?
Sandip ,  Pune
4th December 2012


57
Hello All,
Is anybody does agreement for 6th or 7th floor flat ?

Regards,
Sandip
Sandip


HI Sandip, I have booked flat on the 6th floor, but agreement is not done yet. I will do it in the next month. Is there any issue in the agreement for 6th & 7th floor?
rahul,  
10th October 2012


No, not an any issue, I also booked flat on 7th floor and I just want to know is Agreement procedure for 6th and
Sandip ,  Pune
11th October 2012


and 7th is start or not.
Sandip ,  Pune
11th October 2012


I Sandip, I booked flat on 7th floor, but till date no idea about tdr approval and aggrement.
Vilas Shendge, Apartment Resident, Pimpri-Chinchwad
22nd October 2012


has anybody completed the loan sanctioning procedure with SBI for 5th floor of VARDHAMAN VATIKA??
atul,  Pune
31st October 2012


@ Vilas : Same here, l also dont have any idea about
Agreement date.
Sandip ,  Pune
1st November 2012


I have done the booking on 3rd floor and my loan is done with SBI. It takes about 3-4 weeks from the day you submit all your papers with SBI for processing.

No issue with SBI loan, this property is preapproved.
Manish,  Pune
1st November 2012


@Atul, ask to Sharma ji in office, he will give you SBI Agent name... that guy is really good and will help you get the loan faster.
Manish,  Pune
1st November 2012


58
Hi, I am Aryan,I have recived an offer for this project (2bhk) can any one tell me what are the MSEB charges,Parking charges(open & stilt),Registration,Maintainance for this project ,has any one gone thru this No one is talking about these issues and biggest thing is what is the position of VAT-4.1% WHO WILL PAY THE VAT.BUILDER OR u & me ?
aryan kokane


Hi Aryan,

Those charges are standard for everyone. The vat (for any service not just this one) is to be paid for the recipient of the service or goods. And according to the law, Builder is a service provider who is providing you a service of building your house for you so vat applies to it. The vat was 2% before but I think it is increased from 1st October on wards (I am not 100% about when it is increasing).
Manish,  Pune
30th September 2012


Hi Manish, You have gathered much more details about this project which are very helpful for all the friends. Please keep sharing. I just wanted to correct the fact on VAT as per my understanding. From 2010 onwards the VAT rate is 1% of the basic flat value.
Vilas Shendge, Apartment Resident, Pimpri-Chinchwad
5th November 2012


59
Hi Rahul, I am Tejas I am planning to book the flat there. May i know What is the Rate when you booked ?
B M Tanpure


Rahul or those who booked early this are definitely with lower rate than today. I think that might not be a good way to find it suitable. It those the rate was around 3K/sqr but certainly not now.

This project is good location and in coming 3-4 years it will be a busy and busty place no doubt.

We bought because we felt it was a good property. No issue with builder or work heard so far so I still think it is a good choice.

All I can say is do a proper evaluation based on your need and then go for any house.
Manish,  Pune
30th September 2012


Hi Tejas, I booked flat at the rate of 3800/- per sqft.
rahul,  
10th October 2012


60
Hi All,
I am Rahul. I have also booked flat here.. Please share your experience at the time of agreement.
rahul


Hi Rahul,

Congratulations for buying your house.

Agreement was smooth process. They will give a date, go with your required doc/cash (if applicable to you).

Work is also going in good spead. I just checked 4 weeks before.

Manish
Manish,  Pune
12th September 2012


Thanks Manish
rahul,  
14th September 2012


Hi Rahul, Can you please share how much did the builder negotiate. It would be helpful.
Ameet,  
19th October 2012


61
Hi I am Ameet. I visited this site last week, where they were quoting the rate of 3800. Looking at all the above comments/replies I am getting confused whether to book or not. Just wanted to know are there any issues with this project.
Ameet


Most of his flats are already gone. This is 6th project of the builder. No issues in the project. You can go for it.
Manish,  Pune
9th July 2012


62
ALLL ARE REQUESTED TO MEET AT 4 PM AT SITE OFFICE AS WE ALL NEED TO DISCUSS AGREMENT ISSUES BUILDER...PLS COME WITH ALL DOCUMENT RECEIPTS...THANKS
Amit Pathak


any progress guys ... Should we other go ahead to book her??
sachin,  Pune
4th May 2012


Share all yours email id for those who has booked flat in vatika..I am creating a DL for the same.Will have further communication there..
20th May 2012


amity_pathak@yahoo.com agreement sabka ho gaya hai...abhi hamko demand letter diya ja ra hai..
5th June 2012


Dear All,
I am Rakesh I have booked 2BHK. Nice to see you all here. My contact details are:
rakesh.kshatriya@gmail.com 9011076511
rakesh,  Pune
28th June 2012


Hello All , I am Vishal Kurmi I have booked 1-BHK on lunch day of project at that time my flat no. was B-507 . Now builder is saying he does not got NA for B wing & he changed all to A wing. I am not able to do registration because of change of flat number as register power of attorney i mentioned B-507. Please let me know if any know about issue. My email address vishalkurmi@gmail.com
Vishal Kurmi,  Akola
30th June 2012


conti my flat number is now A-501 please share if anyone know about this change of flat numbers
Vishal Kurmi,  Akola
30th June 2012


@ Vishal - U mean to say builder is not going to construct B-wing???
Vinod Borse,  Pune
2nd July 2012


He changed my all payment receipts with A-501 at time of booking it was B-507,so I am not clear ..
Vishal Kurmi,  Akola
6th July 2012


Builder has not changed this, actually PCMC as approved plan in that way. They said joint building cannot be called A & B wing due to one wall. There is no issue at all. Builder is transparent in his information. This is his 6th project and all projects have been well received by people.
Manish,  Pune
9th July 2012


Hi Ajit , hv u created DL ? If yes Pl. share
rajan, Apartment Resident, Pimpri-Chinchwad
13th August 2012


Anyone please update about the agreed possession date ? and if this project is approved by HDFC ? Kindly reply for further consideration, Thanks in advance
10th September 2012


Plan is approved by HDFC & SBI. So far no communication on change of possession date.
Manish,  Pune
12th September 2012


Hi Ajit, Please include my e-mail to DL. - vilas_shendge@yahoo.co.in
Vilas Shendge, Apartment Resident, Pimpri-Chinchwad
22nd October 2012


Please add my above e-mail to DL
Ameet,  
23rd October 2012


hi I am Atul I have booked flat on 5th floor A wing atul.kulkarni27@gmail.com is my mail id Please add my id to DL
atul,  Pune
1st November 2012


Hi Ajit Kumar, Please my email id to DL
shewale.sandip@gmail.com
Sandip ,  Pune
2nd November 2012


Finally booked a flat here on 1st floor A wing after a lot of thought. Thank you all guys for posting hellpful information here. Hi Ajit Kumar, also please add my e-mail kasliwalameet@gmail.com
Ameet,  
6th November 2012


Hi Ajit, Please add my email Id to DL rahulhkhairnar@gmail.com
rahul,  
22nd November 2012


63
Hi All,
I also booked one 2BHK flat at the rate of 3575 this month.
Does any one done the agreement till now?
Is the project is NA?
Does any one approach to the bank for Loan?
Can we all we be in touch in Face Book and Create one Group to have all updates about the Project?
Face Book URL: - http://www.facebook.com/prashant.r.agrawal

Prashant Agrawal


Please connect me at :- 9890319978
27th April 2012


64
Is any one has done Agreement ?
vivek mhasavekar


You please get the agreement raft...read the clauses very carefully...then go ahead with agreement...
1st May 2012


65
u can see some more information from below site-
http://www.vardhamandevelopers.com/about-vatika.html
Roshan Bedi


66
Hi All,

This page has the online browser for this project.

http://www.makaan.com/shreevardhmandevelopers-vardhamanvatika-pune-thergaon/microsite/1812/174
Manish


67
Hi All, I am planning to buy 2BHK in this apartment. Please let me know if someone took house loan for this and from which financial institution they took it.
santosh deshpande


68
Hi Vivek, Thanks for information it was really helpful :)
Hi All,
I have also booked a flat there.
Anant borse


69
Hi Anant, Actully rates are increasing, I had booked at the rate 3500 on 23 march. Now rates may be above to 3700. But I think for 2BHK we can gate some concession in rates. For 1 BHK less chance for low rates.
vivek mhasavekar


70
Hi Vivek, Could you please share rate am planing to book flat in this project. which will help me .
Thanks in Advances.
Anant borse


71
Hi I am vivek. I have also booked a flat there . My cell no .9730561139
vivek mhasavekar


HI All, Builder is asking for Registration. What is our next step.
Dhananjay,  Pune
3rd April 2012


get the soft copy of Agreement....better to share ,discuss , ask for Parking NO , Possison Date ... lets read the claus carefully....
6th April 2012


72
bulder launched web site
Amit Pathak


73
Hi All, I would suggest those who all booked flat in vardhaman vatika please share your cell no so that we can be touch ...
My Cell no : 9860487036
Dhananjay


Hi, I am Roshan, I have also booked the flat there. My cell number is 9823900406
Roshan Bedi, Apartment Resident 
29th February 2012


Hi All,

I also booked 2BHK in this project recently. I would say let us create a Dl and add all email ids there so that we can be in touch with each other about progress or anything we would like to discuss.

Regards,
Manish Pandey
Manish,  Pune
19th April 2012


74
Hi All, I have also booked there 2 BHK flat in Vardhaman vatika pune Thergaon
AJIT KUMAR


pls ask for parking plan ...i have also booked the flat but still parking layout is not shared. pls ask for parking layout and NA ORDER
18th February 2012


@Amit ..I have askd to builder ..they r telling there will be alloted covered parking and also they have taken NA order since they can not take such risk to spare such apartment ..but no idea whether we should trust or not..let me know you pleople suggestion
20th February 2012


my no is 91 9004469161..can call anyone..
20th February 2012


75
@Lalit that project you are talking about is in Thane mumbai, but we are talking about Thergaon,Pune
Ajit Kumar


76
@Ajit and Dhananjay, even I also went through the builder site and they it was mentioned as Vardhaman Vatika is a 14 storey tower. Even I check in Commonfloor it is the same project, for further details you an check the link by Clicking Here.

lalit.verma74


@ Lalit you are talking about Vardhaman Vatika mumbai and i am talking about Vardhaman Vatika pune
Dhananjay,  Pune
15th February 2012


its 8 sotery building
18th February 2012


77
Hi Dhananjay, Thanks for replying.I am also suppose to book 2bhk flat over there.seems location is fine.Yes you are correct that is 8th floor building there are total 3 wings A B and C where in A wing all 2 bhk flats are there but I could not find any information about this in any website , till now they did not put their info in Vardhamandeveloper.com..Can you tell me how is this builders? I believe there have already completed their projects like vardhaman hierghts,dhruv,bhumi etc..let me know your no so that I can discuss with you since you hav already booked flat there..
@Lalit, I believe that project you are talking about is different.This project is in Thergaon Pune area.
Ajit Kumar


i have visited vardhaman boomi and dhruv and these two projects are good and about builder in terms of settelment/deal i heard he is quite good
Dhananjay,  Pune
15th February 2012


78
Hi Ajit and Lalit, i have gone thr this project and also booked 2 BHK flat, building has 8 floor with modern facilities.
Ajit are you looking for flat over here .... its nice project .... you can visit the place
Dhananjay


Hi Dhananjay, On Which Rate you booked flat over thr abd how much is the Flat Area. I am in US so I need more info on this project. could you pls provide me some details.
10th February 2012


3300 Rs per Sq Ft
Dhananjay,  Pune
15th February 2012


actually i am the 1st customer who booked ... that why got this rate
Dhananjay,  Pune
15th February 2012


Hi am also booked the flat....But can you ask builder about the NA ORDER . DOES THIS PROJECT NA? PL S GET IT CONFIRM ASAP.
18th February 2012


If this project is not NA then will not get home loan from any reputed or nationalise bank (HDFC, LIC, ICICI, Bank of india) bank do all those verification.... any ways i will try from side also .... but if there are is any problem bank will not allow for laon... Amit On Which Rate you booked flat over thr
Dhananjay,  Pune
22nd February 2012


i checked with hdfc ,sbi,icici...as per them they are following up with builder but not got satisfactory document hence project still not approved... harm to us only might be if project do not get approved ..then it will go to Gunthewari Project ..then we have to take personal loan... i booked for 3300 rs sq ft ....pl try from your side..have u given 10% amount?...they are following up with us for that...i asked for proejct file and parking layout...pl check u also....keep in touch
23rd February 2012


79
Hello Ajit, I was going through some of the website about this project, the project seems to be a 14 storey tower with all modern facilities in the building. All the amenities has been provided along with superior marble & granite finishing and granite skirting all round.