Q: I have booked an apartment in Red Apple Homez 8 months ago, but there is no approval till now.
Replies (128)
1
Hi , Can anyone confirm status of Red Apple Residency as well.
Anil Singh


I buyed two flats . Please share your number
17th April 2018


My number is+14164092897 how i can get refund . Please add me
17th April 2018


I am B B Singh, My contact No is 9910309182, I have booked one flat, what to do next any one suggest me
1st August 2018


2
This is fraud developer. They not able to complete any project, only demand money, after money received they does not replay.9716867343 group me add Karna mere bhai
31st May 2019


hi gaurav.
I am Tarun. I have also booked a flat . Is there any group for all buyer of red apple homez. It there is any group then add me in that group .My no. is 9990638354
Tarun Vishnoi, Apartment Resident 
2nd April 2020


2
Sorry to share this information, the builder office is closed, none of the numbers are active. they have made fraud with number of people, who bought the flat. Even the money has not paid to farmers. so its total waste of money.
Abhilash Narayan


Can you share your number . My number is+14164092897
17th April 2018


3
Is there anybody who got refund from Red Apple recently?
Vinod


4
Udit Sharma Ji, Can you send me the copy of court order.
Vinod


5
Is this forum is still alive...?
Vinod


6
Hi Manoj Mishra, I haved also booked the flat in red apple homes Please share your number i will create a group so we can share the latest update or call me on 9999709028
Ved Sharma


hi,dujendra, i have been booked 2bhk in red apple homes,please share my number so i can get latest news against fraudy builder.please add me
3rd October 2018


hi gaurav.
I am Tarun. I have also booked a flat . Is there any group for all buyer of red apple homez. It there is any group then add me in that group .My no. is 9990638354
Tarun Vishnoi, Apartment Resident 
2nd April 2020


7
Friends,what is latest update on Red Apple Homez.
Vinod


8
Is there any group of red apple Homez customers. I have also booked 2bhk flat in red apple homez. We should keep contact to each other. Please share your mail IDs and contact no.
Thanks
Rahul
Rahul


Court has order to demolish this building. GDA went to court when it found that builder is going against the approved plan.
20th June 2017


There is a whatsapp group of Red Apple customers. Please send your number to group admin Mr. Prem Kumar Dubey - 7838330939 and Sandeep Kumar - 8010552624 with your flat number they will add you in.
Sukh Nandan, Apartment Resident 
21st July 2017


What is the matter for demolishing the building . Why court has taken such steps.
25th August 2017


Hi Sandeep ji and Prem ji
I am Tarun. I have also booked a flat . Is there any group for all buyer of red apple homez. It there is any group then add me in that group .My no. is 9990638354
Tarun Vishnoi, Apartment Resident 
2nd April 2020


9
Hello folks, seems like this discussion has ended up, we are filing a case against this builder in this month. We already have a group of 25 people , those who wish to join can ping me at sanyaal.sid@gmail.com
Sid Sanyaal


Hi Sid,
request you to add me as well, i have also booked 2 bhk flat in redapple homez.
21st February 2017


Ved Sharma ji I have also 2 bhk flat in Red Apple Homez, please give me your mail id or contact no. I want to contact with you.
Thanks
Rahul
Rahul,  Ghaziabad
23rd April 2017


Dear Sid and Rahul Ji,
Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


There is a whatsapp group of Red Apple customers. Please send your number to group admin Mr. Prem Kumar Dubey - 7838330939 and Sandeep Kumar - 8010552624 with your flat number they will add you in.
Sukh Nandan, Apartment Resident 
21st July 2017


Please add me to the group . I booked 2 no 2 bhk in red applez project . PleSe guideme how can i file for refund .
My email is onlyvivej2007@gmail.com and my number is+14164092897
17th April 2018


hi,dujendra, i have been booked 2bhk in red apple homes,please share my number so i can get latest news against fraudy builder.please add me on 9582763293 (whatsspp)
3rd October 2018


hi,dujendra, i have been booked 2bhk in red apple homes,please share my number so i can get latest news against fraudy builder.please add me on 9582763293
3rd October 2018


hi
I am Tarun. I have also booked a flat . Is there any group for all buyer of red apple homez. It there is any group then add me in that group .My no. is 9990638354
Tarun Vishnoi, Apartment Resident 
2nd April 2020


10
Dear Friends, kindly share latest update about the construction/loan approval of Red Apple Homez
Vinod


waist of time. Nothing will happen in this project. Advisable to all to apply for refund. many other projects are with almost same rate is available ready to move or will get position in six month.

why you people are waistng your time.

You all knows this project will never complete.

strange still you are attached with this
Gopal Rawat, Apartment Resident, Ghaziabad
2nd December 2015


Yes, Gopal is right. Almost all the booking has been cancelled and buyers are fighting for their refund money. I think project is facing lack of approval. Construction work has not started yet.
14th December 2015


dear red apple homez investors please share your mobile numbers and mail id with me. my mail id is sanjeev65sharma@gmail.com and mobile no is 9810047868
16th December 2015


Dear Friends over phone they are saying that 2nd floor is under construction. kindly confirm if any body has visited the site.
Vinod, Apartment Resident, Noida
4th February 2016


Dear Vinod,
Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


11
Dear Friends, Is there any update about construction work?
Vinod


Hi Vinod,
As per my knowledge, Red Apple Homes is one of the popular residential development in affordable price. This project has spread over 50 acres of land. Currently builder quoted price is around 3299/ sq-ft. This is township project of G+18 floors. Possession of this project is around 2016 March.
Dinesh sahu,  Ghaziabad
22nd May 2015


Hi Vinod,

This residential project has approval from Ghaiziabad Development Authority. Currently up to 12th floor construction has completed. Schools, Institutes, University & Hospitals are surrounded to this project. Banks approving loan for this project are State Bank Of Travancore, Punjab National Bank, ICICI Bank, DHFL & HDFC Bank.
Anand Roy,  Ghaziabad
22nd May 2015


work has started on red apple homez and banks r going to disburse the amount to the builder, Dear all no need to worry as all of u know Red Apple Homez is totally sold out project, Banks r going to disburse the funds so there is no reason to delay of possession. if any body have any question can contact me
Kapil Tyagi,  Ghaziabad
24th June 2015


Hi Kapil,
Are you an real estate agent Register/Login at Agents Login to get matching buyers and tenants.
3rd July 2015


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


12
Dear friends , now the time has come when the all the buyers of the Red Apple Homez should put pressure on the builder for the progress in construction work or else we get our Money back with interest as soon as possible.
Vinod


You are right vinod ji. We are agreed with you. Its really shameless for all of us that we are the part of that worst project. I had booked in august 2011 and after three years project should be completed but still excavation is going on. Please raise the alarm. Dont sit normally and come together in their office at same time with Media also. .
amit,  
24th February 2015


Now they are saying approval has come and asking for 15% on all cost, while in brochure we had to deposit 10% on BSP, this is purely a cheating, if 15% is mandatory then they should ask for 15% on BSP only. Friends please get ready to put pressure on builder to take 15% on bsp only
26th February 2015


If we ask for refund from them they will deduct 50000+S.T. on total booking amount. Is this right thing they are doing?
26th February 2015


PLEASE VISIT TO THE PROJECT ON 10TH MARCH AND PUT PRESSURE ON THEM. THERE IS SATISFACTORY PROGRESS IN THE WORK. PLEASE CONTACT ME.
9th March 2015


THERE IS NO SATISFACTORY PROGRESS EXCEPT THERE CASUAL ATTITUDE AND LIE.
9th March 2015


I have booked a flat 2 yrs ago with this builder , but the property was not approved and the construction work was not started. I visited many times to office of builder but no solution was possible.
Finally builder gave me cheque without any interest and appreciation But I presented the cheque. given cheque by builder has been bounced.
21st March 2015


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


13
प्यारे दोस्तो , अब समय आ गया है जब रेड एप्पल होमेज़ के सभी खरीददार साहस के साथ सामने आये और प्रयास करे बिल्डर पर दबाब डालने का , ताकि निर्माण कार्य जल्दी शुरू हो या फिर हमें हमारा पैंसा ब्याज सहित वापस मिले.
Vinod


14
प्यारे दोस्तो , अब समय आ गया है जब रेड एप्पल होमेज़ के सभी खरीददार साहस के साथ सामने आये और प्रयास करे बिल्डर पर दबाब डालने का , ताकि निर्माण कार्य जल्दी शुरू हो या फिर हमें हमारा पैंसा ब्याज सहित वापस मिले.
Vinod


15
दोस्तो, कहाँ हो सब लोग, अब वक्त आ गया है जागने का और जगाने का '...........कहीं बाद में ये कहावत सहीं न हो जाये ....अब पछताये क्या होय जब चिड़िया चुग गई खेत .
Vinod


16
Dear Friends, what is the latest update of Red Apple Homez regarding construction and loan approval.
Vinod


They is nothing but a few yards underground excavation near their office. They are asking only money as I feel they are short of fund and liquidity. They are overcharging every thing and asking 15% on total cost. Call me @7838330939 for update.
9th March 2015


17
Dear Friends, excavation work started on site. The same can be checked personally visiting there or from their website. But still work is going very slow. They are also saying that They will got approval for 1 BHK by 15th of December.
Vinod


18
Friends, is there any update about BBA and construction work.
Vinod


Hi,
As per my knowledge, construction work in on full swing. Expected possession of this project is Feb 2017.
Amelia.J,  Greater Noida
18th September 2014


Hi Guys,
I am planning to invest on this project. May I know the flexi payment plan of this project? Kindly share some information about this project. Thank you
17th November 2014


Hi Aneek,
As per my knowledge, this project developed by Manju J Homes Pvt Ltd offers affordable homes in Raj Nagar Extension.
Flexi Payment Plan of this project is like:-

At the time of booking- 10% of BSP,
With in 60 days of booking- 10% of BSP,
On Foundation of block- 10% of BSP,
On casting of Ground Floor Slab- 10% of BSP, 50% of PLC,
On casting of 2nd floor roof slab- 10% of BSP 100% ADC,
On casting of 5th floor roof slab-10% of BSP 50% PLC,
On casting of 7th floor roof slab- 05% of BSP Car Parking,
On casting of 9th floor roof slab- 05% of BSP EEC,
On casting of 11th floor roof slab- 05% of BSP FFC,
On completion of Brick Work-10% of BSP Power Back Up,
On Completion of Internal Plaster-05% of BSP Club Membership,
On Offer of Possession-10% of BSP IFMS.
17th November 2014


Hi Aneek

Please dont try to invest your money in this project because they are just doing the total fraud with all of us and i am suffering from august 2012 in this project. that was the first and last mistake on my end when i had booked my flat over here. Till yet they had not started the project work and telling to US Bars are not in the market so we are not started the project. I am in LNT GROUP AND IN MY PROJECTS WORK IS GOING VERY FAST. ISSUE IS DIFFERENT WHICH THEY DONT WANT TO TELL ALL OF US. IF WE ARE DEMANDING FOR CENCELLATION OF OUR FLAT THEN THEY ARE SAYING WE dont have the fund. when fund is not with them then how can they give us the project completion. They are depend on our money totally.
Please its my appeal to all of you make a unity and come together in consumer court and take our money back with interest and invest some where else in good project. They are taking the profit of this thing thaT we are not together. Save your money.Call me.Amit Gautam 9891699481
amit,  
27th November 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


19
Hi all,
It is a good news for all that Red Apple Homez crossed all the hurdles. They are pleased to inform you that Red Apple Homez got GDA approval vide the letter number 85/Master Plan/Zone-1/14 dated 23/07/2014. Now they would like to execute the builder buyer agreements as soon as possible so that there no further delay in their project delivery plans. Soon you will receive a call from our office detailing your schedule for builder buyer agreement and other related formalities. They thanked you all for being with them and they assure you best of their services in coming times.

It is important to note that MJ Homes have mentioned the letter number and date of the GDA approval letter. Any one can get its copy from GDA through RTI.
Sukhpreet


Dear Mr Sukhpreet,
Real game will start now and it has started ....
they changed complete layout and others thing also.....
Following 3 issues need to be addressed:
1-Earlier 846... now 875 for 2 bhk
2-Earlier it was Rs.100000 as a Covered car parking now Rs.150,000 compulsory
3-Earlier Rs.120/sq-ft as a development charges now 180/sq-ft
Lohit Raj,  Delhi-NCR
7th August 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


20
Friends they got approval but they are saying they do not money to give us whose cheque got bounced so they will complete the project and give all of you possessions
Piyush Tripathi


my cheque also bounced. may i know what should do with red apple builder.
praveen,delhi
21st October 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


21
Hi frends.....RED APPLE HOMES has got GDA approval.....i hv also checked in GDA..no need to worry about this.
NITESH kr Agrhari


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


22
really it is approved or else?
pankaj bhatt


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


23
hi Parvinji and Piyushji, yes my cheque have bounced 2 times , can we get together and take some action. my contact number is 8802207980.
Arnab Verma


Friends Approvals are there, dont worry.. See their site and lets get together on Saturday and see with naked eyes.. What Say.... My no - 9266352120
CHETAN,  Delhi
25th July 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


24
pravin ji it is actual status that they have no money
pankaj bhatt


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


25
hello friends one person of Red apple phone no,9650600508 says we recieved GDA approval on 24/07/2014, please see and check it
pankaj bhatt


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


26
Hi guys ....its been more than 2 years and still they do not have approval from GDA and also I had confirmed with GDA they r not going to get approval in future too, so its time to go and take your money back else you r going to loose you money.. after lots of struugle I got the cheque from them but its getting bounced as they do not have money in their account so.....i will request to all come with me and firstly do file police complain against cheating. if any one interested you can write to me on .. verma.arnab@gmail.com else me alone going for ploice complain and do file crimnal case againgst cheque bounce.
Arnab Verma


Your cheque also bounced?
Piyush Tripathi,  Ghaziabad
23rd July 2014


Hi,
Agreed with You. we have recd post dated cheque of 30/08/14 from builder but i know that it will bounce. Please create a group for file case we ready for that.
23rd July 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


27
Any Update about GDA Approval
Abhishek


No approval till yet. Wait for another one week as per parveen mittal.
amit,  
30th June 2014


Hi I am Piyush tripathi booked 1 bhk in 2012 in Redapple homes and they have not got any approval from GDA. Now I have cancelled my flat and after 3 months of problems I got the refund cheque. Now their cheque also bounced. They are saying we will give money an nothing they are doing. People please do not invest in red apple they are making fool
Piyush Tripathi,  Ghaziabad
20th July 2014


If anyone want to contact me regarding red apple homes status call:9971015851
Piyush Tripathi,  Ghaziabad
20th July 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


28
Dear all, i want to know the present status of the project please update me as much one can.
Anurodh Gupta


Dear Friends, Now CELEBRATIONS time has come as finally Red Apple Homez got the GDA approval on Yesterday. Congratulations to all of the buyer's of RED Apple Homez. Lets cross our fingers and hope for the best this time.............
Vinod, Apartment Resident, Noida
24th July 2014


Tell me the mobile no. who say that Red Apple Homes got GDA Approval ,I also verify .
24th July 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


29
Over phone they are saying that they have fixed meeting with GDA which will be held on Tuesday, 17th June, 2014. Let us wait for one more week and if they fail in getting approval then we can go to Red Apple Homez site with a larger group to meet each other and form a community for the welfare of the applicants.
Vinod


Dear all please note that again approval of red apple homez project reject by GDA.
19th June 2014


Dear Pravin,

On which basis u r saying gain approval of red apple homez project reject by GDA.pls confirm me
25th June 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


30
Any news related to red apple homez we request to all please share
Pravin Kumar


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


31
agree with you
Abhishek


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


32
They will not come at sharp 10am to 11am bcz that day was sunday and if parveen will not come and we all will be there at 10-11am then might be after know this he will not be come over there so please meet at 12-1pm and then we will talk to him regarding our issue. If you are agree then msg me on my this number 9891699481.
amit


Kindly add me also in the group as i have also booked two bhk in red apple homez phone 9999709028
VedPrakash, Apartment Resident 
24th June 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


33
My mob no: 9650190680
Abhishek


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


34
I will also come at 10-11 am on sunday
Abhishek


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


35
ok. i will come at 10-11am and from all of you if any body want to come with me then he can. 9891699481 is my number.
amit


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


36
8800954443 Pravin Kumar
Pravin Kumar


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


37
9266352120 Chetan
CHETAN


38
Give the mobile no. all of person who will come on Sunday 15/06/2014.Because if some one not come then call others. My No. 9871618564 , Timing should be 10 to 11 am . it's OK then conform it.
Anurodh Gupta


39
Time will be 12.30 pm. All of you please confirm are you coming at this time on sunday. We have to take urgent decision because any thing can be happen with our money now. Regards.
amit


40
Ok I will coming please fix the time and request to every concerned come on the time this time to take decision builder speak every time lyeing
Pravin Kumar


41
Sunday will be fine with everyone. This coming Sunday will be very much comfortable. Can we meet there BC now the game is over. They are testing our patience. That was the worst day of my life when I had booked flat over there. Pls come on sunday
amit


42
U are right ,Pavin . I also with you & Fix the date like sunday or saturday this because max. person come with us.
Anurodh Gupta


43
Kindly fix a date and communicate to all for cancelation and recover with interest with current dated cheque from builder otherwise file case against them
Pravin Kumar


44
we have to go together and take a hard action against them.
amit


45
what 2 do i think we must get a date in written from dir of manju j homes on the commitment and construction date along with approval of project.but 4 this we all together have 2 plan common timing 2 visit there office.
my no is 9650745445 id-vdharamveer@gmail.com
DHARAM VEER singh


46
I am agreed with you Rashmi. Lets go all of us and take a proper action against them.
amit


47
Yes you are saing correct Rashmi... they are making fool of all around...
CHETAN


48
Kangla builder has him sabko ekjut hokar court Jana chahiye aur builder KO sabak sikhana chayihe
Kumari Rashmi


49
if they return my money I would like to book somewhere else
swapnil kumar


50
I am interested to book somewhere else if they return back money.
swapnil kumar


51
They are liers and cheaters. They are taking test of our patience actually. In two years they can complete that project but still they are not able to start that project even they are misguiding us again and again from july 2012 and we are listening them. Come together in a group and talk to them. Time is over now. Sarkar badal gai par hamare achhe din kab aaenge.????????????????
amit


52
I also called up the guys, they told me the same.Let's plan to go there this sunday(1st-June), we can ask them to show us the payment slip that they are saying they have deposited. As for the past 5months their payment is done and waiting for GDA meeting.
If you ppl are ready then let me know on whtsapp grp or here, so that we can plan.
Thanks & Regards,
Prashant Malhotra
prashant malhota


53
HI ALL

Yesterday i was visited Red Apple homez Site, and asked about project Mr Manoj choudhary advising as usual document is signed by GDA authority and this week may be they receive.

Any idea / suggestion what to do with this project please guide me.

Deepak Kumar
Deepak Kumar


54
Q: I have booked an apartment in Red Apple Homez 2 Years ago, but there is no approval till now.
Anurodh Gupta


55
how to know its Approval Detail.
Anurodh Gupta


56
HI All

plz advise if you any good news about red apple homz.
Anurodh Gupta


57
guptaanurodh@rediffmail.com,I also booked flat Two years ago however it seems they are cheating.

Anurodh Gupta GZB 9871618564
Anurodh Gupta


58
HAHAHAHAHAHAHA
CHETAN


Hi, you can join the owners group of this project and post discussion and all details there.. to join the Commonfloor Group, of Manju J Red Apple Homez, Raj Nagar Extension, Ghaziabad by clicking on this link Manju J Red Apple Homez, Raj Nagar Extension and http://groups.commonfloor.com/ to get in touch with other owners who have already booked a flat in this project and discuss about the same.

Commonfloor.com's apartment management software is absolutely free of coast, Anti spam and provides complete data security and privacy (http://www.commonfloor.com/apartment-communities/pricing).

Already 1 lakh apartment society are using Commonfloor Groups to bridge the gap of communication among the owners and MC (Management Committee)
(http://businesswireindia.com/news/news-details/commonfloorcom-launches-commonfloor-groups/38909)
Khushbu ,  Ghaziabad
23rd May 2014


59
Dear friends, they are saying that approval will be got withing the month of May 2014. They have started putting board of gda approval on the way of Raj nagar Extension and will update on their website as soon as they will get the approval letter.
Vinod


Dear Vinod

hv u visited site ?
where u see hording & board, i want to c
plz advise.
21st May 2014


60
HI All

plz advise if you any good news about red apple homz.
Deepak Kumar


61
I checked on red apple residency website, they don't have any construction image updates after Jan-14. So are they even completing that project???
prashant malhota


62
Can we meet on this sunday together. Actualy the time comes to meet with them. They are realy making us fool day by day and we are aslo supporting them in this. Sunday at 12.30 pm around come there. Is it possible then pls revert.
amit


63
Today I got a call from Red Apple guys, Praveen was not available thetefore somebody named as Manoj called me up and briefed about the approval status.. He said that the approval has been signed by Authorized Signatory/VC of GDA. However they did not get the approval in their hand because of Achar-Sahita and due to this they have put hordings across.Don't know, If this is the case then It's Good.. if not then God knows!!!
CHETAN


64
DEAR ALL,

I JUST RECIEVED AN E-MAIL FROM GDA. SAING THAT "THERE ARE NO APPROVALS GIVEN TO RED APPLE HOMES"

THESE PEOPLE ARE MAKING FOOL OF US AND MIGHT BE THESE PEOPLE RUN AWAY..
REQUEST YOU ALL TO GET ALONG AND GET HOLD OF THEM NOT INDIVIDUALLY, BUT WE ALL SHOULD TAKE TIME ON WEEK ENDS OR ANY TIME AND GO TO THEM..

I HAVE ALSO WRITTEN MAIL TO GDA THAT THESE PEOPLE ARE SAING THAT APPROVALS ARE THERE FROM GDA.

PLEASE SEE THE MAIL BELOW.

From: helplinegda
To: Makkar, Chetan
Cc:
Subject: Re: Status

not aprooved by gda

On Wed, Apr 30, 2014 at 6:23 PM, Makkar, Chetan wrote:
Hi,

Can you share the Status for Approval of Project “RED APPLE HOMEZ- RAJ NAGAR EXTENSION( GHAZIABAD)”

e information contained in this message may be CONFIDENTIAL and is for the intended addressee only. Any unauthorized use, dissemination of the information, or copying of this message is prohibited. If you are not the intended addres
CHETAN


65
What about their Bhumi Pujan? Is it really approved or not?I have also booked 2BHK in December
2012.I hope they will be able to clarify the things.
swapnil kumar


66
In this range no other obtion. stop trying to see here & there and go there for book your flat othervice with in 6 month you will not be able to catch their rates at all. Just go and book. I had already told you on phone that it will be a very great decision at this stage when they got apprvals. i am waitng from last 2 years almost and you are thinking for booking at this stage.

ok
amit


67
Pls, suggest other apartment within 20 lakh in ncr region.
subhash kumar


Hi Mr Kumar,
Could you please provide some more details of your requirement. NCR region having many sectors so have you thought of any particular sector. It would be very helpful for us to provide you details by knowing tour requirement.
Neel Sharma,  Gurgaon
18th September 2014


68
Thanks Chetan ji & Prasant ji for your valuable inputs.
I am being followed by there man to book flats as soon as possible,As per them just after BHUMI PUJAN (which as per them is on 1st may) they are going to increase rate.

But as per me if they could not get approval since 2 yrs and still they are running for this,how they can guarantee that they will be able to finish this project.
As they are not big builder they could have used your money for their salary or other expences, so this is also worrying me whether they have money for project or not.
subhash kumar


69
Yes Subahsji,

I agree with Chetan that if they are saying the approvals will be there in few days then you should wait for the final approvals. As we guys are stuck there for last 1.5 years.

Rest its your call.
prashant malhota


70
Subhash, you can invest in the same, but make sure you see their Approvals and cross verify. They are claiming that the Approvals have come, however some basic formalities with GDA is pending due to which they are not able to show their projest as GDA approved on their website.

I has a word with Mr. Praveen today morning and he was saying that the project has been approved, just basic formalities are pending.

Apart from this, The builder is New therefore, wont damage his image in first project. It could be fruitful decision to Invest.

Also catch hold of Mr. Praveen tomorrow when you go, and ask for the actual position, According to me he is the only one there who will not mis-guide you. rest all will make fool.
CHETAN


Hi,
You can join the Commonfloor Group, of Manju J Red Apple Homez, Raj Nagar Extension, Ghaziabad by clicking on this link Manju J Red Apple Homez, Raj Nagar Extension and http://groups.commonfloor.com/ and get in touch with other owners who have already booked a flat in this project and discuss about the same.

Commonfloor.com's apartment management software is absolutely free of coast, Anti spam and provides complete data security and privacy(http://www.commonfloor.com/apartment-communities/pricing
).

To find the benefits of joining the software please find this link ( http://www.commonfloor.com/apartment-communities/benefits-owners)

Already 1 lakh apartment society are using Commonfloor Groups to bridge the gap of communication among the owners and MC ( Management Committee)

(http://businesswireindia.com/news/news-details/commonfloorcom-launches-commonfloor-groups/38909)
Khushbu ,  Ghaziabad
29th April 2014


71
I m going tomorrow there office
subhash kumar


72
My no is 9654031218.pls add in your grp
subhash kumar


73
Dear all
i want to book a home in here. But all your grievances are making me to avoid. Pls suggest.
can i have other options with in 20lakhs.
subhash kumar


Hi,
You can call on this toll free number (1800) (180) (180) (180) Or You Post your Requirements to get matching properties details on your Email and Mobile.
Amelia.J,  Greater Noida
18th September 2014


74
Sunday would be a good option!
CHETAN


75
Lets all plan to meet and reach there office on 3rd or 4th may(which ever suits). We can demand an exact date for their project. As peer now they are just fooling us around with the words that the approvals are coming next week.
I came to knw frm sm1 that the project is geeting delayed as partners are having sme issue amng them.
Skywlks projct hs got approvl, which is adjct to Red apple.

Thanks & Regards,
Prashant Malhotra
prashant malhota


76
Hi Chetan,

I am there on the whatsapp grp created by Sandeep. My numbr is 8010651833.
prashant malhota


77
Hi Prashant,

Can we get your cell no.

Regards
Chetan Makkar
CHETAN


78
I visited them few days back and praveeni said that they have all the documents and they will be calling up customers next week for allocation letters.
Lets c, we guys have been listening to this kind of stuff for more then 1 year now. I bboked the flat in 03-Jan-13.
Prashant Malhotra
prashant malhota


79
Chetan,
I have Created the Group for the same who ever is on WhatsApp can join by sending request on - 8010552624
Sandeep Kumar


80
I have Created the Group for the same who ever is on WhatsApp can join by sending request on - 8010552624
Sandeep Kumar


81
Good Sandeep.. We all will be in touch.. 9717949205
CHETAN


82
Its Good lets create a WhatsApp group of Redapple investors so that if anybody contact them and get any info all others can know by that guy....
Mob - 8010552624
Sandeep Kumar


83
just chill guys......u dont worry about them...one of my known is in GDA....n they r giving me each n every updates regarding approval.....ther is some technical issue Of MAP dats y they r taking time too much..u cn contact me @ +91 9717515408 or its better to add in Whats app group....stay in touch
NITESH kr Agrhari


Hi guys myself also booked 2 BHK flat in same ,everyday they are making false statement .
Thanks for provide useful information my cont No-995325040
11th April 2014


84
me also booked the same in Sep 2012 ,today I talked to whom I booked the flat, previuosly he was saying its going to start in navratri , now he is saying , construction will start from 25 April, so go threre and kick their ass and take your money back with interest ...!!!
RAJESH VERMA


85
hi guys i hv also booked 2 BHK (Sep 2012) in red apple homez....n I m also in touch with them regularly....i thought they have some big issue regarding apporval dats y they r nt telling us right info n also they r making so much excuses...day by day they r excusing with us..lets do somthing to get actual reason....
NITESH kr Agrhari


86
They are telling lie every day. don't faith on them guys. they are liers. as simple as that
amit


Sir Ji ka gussa ab aaya.... hahahahah LOL!!!
CHETAN,  Delhi
26th March 2014


87
In Feb I met to Mr Mittal and he said to me that within 10 days we will start sending demand letter because we have got the approval but now he says it will take some more time.
don't know what he wants?
Sandeep Kumar


88
You Know guys, Mr. Praveen has assured that they would get the approvals by Navratra's and would be doing Bhumi Pujan. so lets wait till then...
CHETAN


89
I contacted them again but saying today that they will be getting approval in 10 days time. So, guys still there is no approval in place.
Sukh Nandan


90
any news with anyone about the approval.
Sukh Nandan


91
Can we meet there tomorrow, 23rd March 2014.

Regards,
Manoj-9811044490
Manoj Kumar Sinha


92
I would suggest, jst go and kick their Ass
CHETAN


93
I have 2 BHK flat in Red Apple Homez in Feb 2013 @ 2400 psf. Now, it is learnt that price have been increased to 2800psf. But still no hint of approval given by the authorities. plus they are asking for additional 5%. What to do
sushil negi


94
ok in next week. No issue
amit


95
16 would be an extended weekend due to Holi, So I dont think all of us, even those guys would be available. so if that could be possible next wek then I think would be more Feasible.
CHETAN


96
Can we meet on Sunday 16/03/2014 morning at 11Am there for finalising the real truth. I am going actually..
amit


97
Lest meet up at weekend and grab hold of these people and get the real thing out of it!!
CHETAN


98
Yes you are right its still pending and if we will take our money back then they will return only our given amount not as per the company rate so that's why they are not making the agreements. After a long 2 years wait if we will take only our invested amount without any profit then it will not be a good deal. Please suggest what we have to do all of us. Now water is coming over head.....
amit


99
seems still he is making fool and siince 1 month he is saying ..its been approved but still construction is far away ...please go through below URL:
http://www.justprop.com/forum/83-news/20034-red-apple-homez--gda-stop-construction-activities
RAJESH VERMA


100
No Update till yet, I called them up yesterday and Mr. Mittal gave his cell to PA and she said that he is not available. She said that they will start construction by 15th of March. Now somebody should tell these silly people that you are not dealing in a small builder flat. you guys are developing a Society that too without any experience. you guys also give some information if anyone gets any clue.

My no- 9266352120
CHETAN


101
Dear friends, Is there any latest update from red apple homez.....
Vinod


102
As discussed with Parveen Mittal on the Saturday,Approval has passed by GDA till 9th floor.
and they have to deposit huge amount to get the Release document for it. So Mr. Mittal said that within 10 days they will deposit the amount for the same and get the Approval Document. after that on behalf of that document they will send the Demanding letter to all for depositing the 2nd Payment as per their Booking plan.So guys lets wait to be pass this month and then will again contact to them.
Till then arrange your rest money which has to be deposited.
Sandeep Kumar


103
Sukh Nandan, are you confirmed?
CHETAN


104
Status Quo, there is no approval yet.
Sukh Nandan


105
Any latest update guys?????
amit


106
I am also going on this Saturday to check the docs.
9250985590
Sandeep Kumar


107
Hey Guys,

Lets visit their Office This Weekend. Say Friday or saturday and verify all the documents and have a discussion.

What Say.?? Be in touch. My no. 9266352120
CHETAN


friend i also booked flat in red apple homez
i am with u my email. id ssrawat_1978@yahoo.co.in
3rd March 2014


Hi
You can join the owner's group, of Manju J Red Apple Homez, Ghaziabad by clicking on this link Red Apple Homez and get in touch with other owners who have already booked a flat in this project and discuss about the same.

Commonfloor.com's apartment management software is absolutely free of coast, Anti spam and provides complete data security and privacy(http://www.commonfloor.com/apartment-communities/pricing).

To find the benefits of joining the software please find this link ( http://www.commonfloor.com/apartment-communities/benefits-owners)
Khushbu ,  Ghaziabad
10th March 2014


108
yesterday i talked with Parveen Mittal and he forwarded me a SMS with Bank Account No. and IFSC Code to submit the money.
I believe we should not pay any amount before visiting their office to verify the approval details docs. after that we should think about it.
Sandeep Kumar


Hey Guys,

Lets visit their Office This Weekend. Say Friday or saturday and verify all the documents and have a discussion.

What Say.?? Be in touch. My no. 9266352120
CHETAN,  Delhi
4th February 2014


Don't pay them any money guys, they have cases against themselves for cheque bounce on land acquisition payments in Ghaziabad civil court. They are not getting any approval, rather there would be stay on work on their sites upon judgement. Court have informed all banks to not fund them anymore and thus these guys are asking more money. I took my money back from them with 4% interest.

Don't waste your money on these.
4th February 2014


be aware he is cheating i do visited there office in april last week no means of approval is there
5th June 2014


109
Today, I got an e-mail from them stating that we need to deposit 5% more amount as they have changed the terms. But, this e-mail do not mention any line for approval or clearance they have received so far. So, I seriously doubt if they have received the approval. It may be just a false message they are spreading in order to get more money from the customers.
Sukh Nandan


Hey Guys,

Lets visit their Office This Weekend. Say Friday or saturday and verify all the documents and have a discussion.

What Say.?? Be in touch. My no. 9266352120
CHETAN,  Delhi
4th February 2014


110
Yes!! But the biggest party would be when the same would be updated on their site, and also when actual work would be started.
CHETAN


111
I had talk to them on yesterday and had given them my second installment also but i have one question in my mind that after a long time they got the approvals so why not we should all tell them to arrange one party there. I had Given my ideas to them now your turn............................
amit


112
Hey Guys Congrats to all i just came to know that Red Apple get approval on Last Saturday(1-Feb-14).
Regards,
Sandeep Kumar
Sandeep Kumar


113
I got a call from them that they have got approval and will soon start agreement formalities. Guys please inform if you have also got such calls.
Sukh Nandan


114
Approvals aa gae unke. All guys be haapy and ready with payments..
amit


115
Hi Amit,

Thats really good that you visited them, But the payment slip they are showing you is the payment they have made 2 years back and to each individual they are showing that slip only.
As far as the approval is concerned, I dont think they will get approvals in near future. IF they get the approval from GDA then they will go for Hindon Airbase approvals. So I dont think it to be a good deal, he has invested our money for 2 years and enjoyed a huge interest and now he himself want that we should remove money, thats why they are playing pranks with us.

lets all get together and go to their office and get all the things resolved. I also have some of my friends that are ready to do there. So we should all collate and go to their office. My no- 9266352120.
Chetan
CHETAN


MY Mobile No: 9717294750, I have booked 2BHK in Aug 2012 but till now no information from there, I have mailed to him many times but they are giving next date only.........Shiv Pratap Singh
Shiv,  Delhi
31st January 2014


116
Hello!! I had also booked one flat over there August 2012 on first floor and approvals had come already according to them. They had shown me one slip of payment and may be today or any time they get the approval letter in hand. wait there and take a good return. Hardly we had given them maximum 2 lakhs and you all heard these lines that "SABAR KA FAL MEETHA HOTA HA" so wait and watch. If they are cheaters then they should run threw from there after taking our money may be some genuine issue will be there. come over there and meet with Mr. Parveen Mittal he will definately tell you the exact situation and stage of approvals. This is my advice to all of you.

Regards
Amit Gautam
ACM Technical services- Larsen & Toubro Group Noida
amit


Mr. Amit,
Can you let us know what Mr Praveen said which is the genuine reason if you have asked?
Regards,
Sandeep Kumar
29th January 2014


Hi Amit,

Thats really good that you visited them, But the payment slip they are showing you is the payment they have made 2 years back and to each individual they are showing that slip only.
As far as the approval is concerned, I dont think they will get approvals in near future. IF they get the approval from GDA then they will go for Hindon Airbase approvals. So I dont think it to be a good deal, he has invested our money for 2 years and enjoyed a huge interest and now he himself want that we should remove money, thats why they are playing pranks with us.

lets all get together and go to their office and get all the things resolved. I also have some of my friends that are ready to do there. So we should all collate and go to their office. My no- 9266352120.
Chetan
CHETAN, Delhi
CHETAN,  Delhi
29th January 2014


117
I think If we take our money back, we should also ask for the interest, or file a case against the builder for false commitments.
CHETAN


118
Hi all.. i booked 2 BHK in redapple homes in Sep 2012 ...have any one from you have any idea when its going to approved ..delaler are still saying its going to approved and approval is on final stage, my mail id is rajeshverma18@gmail.com ..should we withdraw money from him or still needs to wait ...its been 2 years.
Rajesh Verma


119
Donot give these money at all
these are all cheaters and we should fle a case against them. we all should make a community and file a case against them. my email id- chetan.makkar01@gmail.com Please leave me a msg
CHETAN


hi All I also boooked a 2 bhk there in Aug-2012. my email id is bhopal_singh86@yahoo.com
11th January 2014


I have also booked HIG Flat in Red Apple Homez but no satisfactory response found. my email ID is sinhamks74@gmail.com
Manoj Kumar Sinha, Apartment Resident, Ghaziabad
24th February 2014


Your investment is in trouble. GDA went to court when it found that builder is going against the approved plan and Court has order to demolish this building.

mail me(uditsharmagzb@gmail.com) if you need court copy .
20th June 2017


120
I also booked flat here, same response every time you try to check. These guys definitely are scam or some fraud, Try asking for a refund and see what answer you get. This builder does not even has our hard earned money to refund, they will tell you for a post dated cheque for 15th January. They are cheaters.
Hitesh Pawadiya


121
avinash.pandey@thomsonreuters.com booked flat an year ago however it seems they are cheating
Avinash Pandey


They seem a fraud, have you tried asking for a refund.
2nd December 2013


122
I have also booked the Flat in it around 1 year has passed but nobody telling the actual thing why the builder not getting approval? every time we talk to the representative they tell its about to come next 10-15 days. but those days are not coming waiting since 1 year... :(
Sandeep Kumar


123
shiv_psh@rediffmail.com, i have also booked my flat one year before but still there is no any information to start the construction
Shiv


124
Hi Guys,

Can we make a Forum and request to add each one in the same so that we can pressuraise builder to give enough details. Please provide your email ID's and we will make a forum. I have some 20 odd friends who have booked flats there. So please share your email ID's for the same.
CHETAN


hi All I also boooked a 2 bhk there in Aug-2012. my email id is bhopal_singh86@yahoo.com
11th January 2014


in sept i do also had booked a flat in h block my no is 9650745445 my id is vdharamveer@gmail.com
5th June 2014


I have also booked 1 BHK flat 2 yrs ago. my Email id is shyamaptara@gmail.com, my phome no is 9582106227
25th June 2014


125
Yes approval was in final stage but rejected again, again his rep was saying before one and half month that this will take a month, but still not approved, now still he is saying that the work will start within 15days, please suggest what we have to do, we have booked my flat on Sept2012, but still the same situation are there.
Shiv


126
Dear Mr Mohit, I am also interested in the same property , Could you please help regarding same.
Mahendra Kumar Shukla


127
Is the rate same on which you booked your flat??
I have also booked my 3BHK flats in Red Apple Homez. However the rate has revised significantly till then.
No matter the approval is getting delayed, but increment in rates will surely help us in getting comprehensive benefits down the line.
I have checked in authority, and the approval is in final stages as commented by Authority officials.
Er. Mohit Singh


i want to know the present status of the project please update me as much one can.
5th June 2014


128
Manoj, before booking you have to verify such things. Why didn't you do so? Negligence at that time has led to such complications now. But anyways check the documents clearly, see what the builder has given in various documents. If there is delay then will there be any compensation provided or something like that will be allowed or not.
Sishir


I have no idea about property matters. just tell me whether I may continue with this project or I should come out from this ? builder has no satisfactory answer. pl z tell your best answer as I m in catch 22.
28th February 2013


Friends they got approval but they are saying they do not have money to give us whose cheque got bouncedso how they will ccomplete the project and give all of us possessions
Piyush Tripathi,  Ghaziabad
2nd August 2014


129

Ask a Question