To get best property as per your requirement list your requirement here or you can call on this toll free number (1800) (180) (180) (180) Or You Post your Requirements to get matching properties details on your Email and Mobile.
As far as project connectivity is concerned, it is just 5 mins away from the busy Sahodaran Ayyappan Road, head for the supermarkets or mini - malls at either Kadavanthara junction or Vyttila. MG Road and the bye - pass are both short drives away, worship, bank, school, college or hospital, you will get there in no time. Kadavanthra is surrounded by developed areas such as Warriyam Road.
I visited the site few months back and saw the sample flats. Some of the basic amenities which i saw there is provision for round the clock water supply through sump and overhead tank. Drinking water from KWA line. Water drawn from well or borewell for other purpose. Three phace KSEB connection with independent energy meter. Concealed copper wiring of Finolex or equivalent with modular switches of Crabtree or equivalent controlled by ELCB and MCB. Generator backup for lift, common areas and 6 points in each apartment (2 in master bedroom, 2 in living room, 1 in dining room and 1 in kitchen). Two Automatic Passenger Lifts including one capsule lift.
Galaxy Winston by Galaxy Homes Private Limited offers 3BHK residential apartments. it's sizes are 1026-1498 sq-ft. and the current quoted price is Rs. 3800/sq-ft. A 3BHK will cost around Rs. 38.98 lacs to Rs. 56.92 lacs onward. The price mentioned is all exclusive.
HI, Galaxy Knigston and Galaxy Winston is a twin projects right on the waterfront at Chilavannoor Road, Kadavanthra. A home at Galaxy Winston will be a wise investment for the future. You will have unmatched quality - the best fittings, in fact, at an affordable price. All of 13 storeys consists 64 units, these projects combine the finest interiors, locations and facilities. Each well - planned home offers ample cross- ventilation and natural light. This project is under construction and expected to be completed by April'2016.