The administrators are being very thoughtful about the whole procedure, They are considering the future needs and plans of Indian Railways, including running of double decker trains, the Metro ROB works are carefully planned and at some places the Metro ROBs will cross the railway bridges at double elevation
Oh, these are some heavily clogged areas, and there usually is a lot of traffic in the peak hours in the city. I guess there will be a lot of traffic due to the construction of these ROBs now.
The location of these ROBs is near the Corridor-I which goes from Miyapur to L B Nagar, having three ROBs, Corridor-II which goes from JBS to Falaknuma having one ROB and Corridor-III, that goes from Nagole to Shilparamam that has four ROBs
Completing the Rail Over Bridges is a very big step is the completion of this project of the Hyderabad Metro rail. In total, there are 8 junctions in total where the railway crossings have to be built in this 72 km project.
Hey Srikanth. the work on the ROBs for the Hyderabad Metro rail has begun recently, and the first phase of this project will be the construction of the ROB near the Bharathnagar Metro Station in Hyderabad.