Latest Answer: Hey, the construction of the Outer Ring Road won’t take so long, it has been declared that it will be finished within the next 8 months. I think the main problem in Narasimharaja Boulevard is the traffic congestion. If the Outer Ring Road construction is completed then it will take a huge load off the traffic at this place. That might help to improve the real estate situation at Narasimharaja Boulevard. Now, even the existing residents of this area are facing a lot of problems because of extreme traffic congestion.