MASTER PLAN
FOUNDATION : Open raft / Isolated RCC Footing.
STRUCTURE : Framed Structure (RCC - Columns, Plinth / Tie Lintel Beams, Roof Sunshade & Slabs.
MASONRY WORK : 9" / 8" thick in main walls and 4" thick in partition walls in Cement Mortar.
WARDROBE : One with 3 Cuddapah Stone Slab 4' length without Shutters in Bedrooms.
One with 4 Cuddapah Stone Slab 4' length without Shutters in Kitchen.
LOFTS : In shorter span in Bedrooms & two side in Kitchen
PLASTERING : In Cement Mortar 1:4 & 1:5
PAINTING : Synthetic Enamel Paint for Doors / Windows & Grills, Putty finish with 2 coats of Emulsion for Inner Walls and exterior with exterior emulsion finish.
WINDOWS : Country Wood frames & shutters with glass panels and grills finished with Enamel Paints.
DOORS : Main Door and frame in Teak Wood, Varnish finish with Godrej or similar locks. All other door frames in Country Wood with Solid Core Flush Doors. In Bathrooms water proof doors.
VENTILATORS : In Country Wood frames with Glass panels and Safety grills.
WEATHERING COURSE : Lime Brick / Jelly / Coba.
STAIRCASE : Kota / Shabath / Terracota Tiles.
FLOORING : 600mm x 600mm Vitrified Tiles except Kitchen and Balcony. Tiles Cost fixed Rs.40/- per sq.ft.
WATER SUPPLY : All Concealed Pipes are by CPVC material. Other Pipes are by PVC Material.
Common Bore Well, Sump and Overhead Tank with Electrical Motor Pump will be provided.
IN BATH ROOM : Ceramic Wall for 7' height and anti-skid Ceramic Tiles in Floors with Standard CP Fittings. Tiles Cost fixed Rs.18/- per Sq.ft.
KITCHEN COUNTER : Finished with Black Granite Slabs with a Stainless Steel Sink. Ceramic Wall Tiles for 2' height above the Platform.
ELECTRICAL WIRING : Concealed electrical wiring by ISI Multi-Strand Copper Wires with Standard switches No Fittings will be Provided.
SANITARY FITTINGS : One EWC in attached Bath room, One IWC in Common room and 2 Wash Basins ( One in attached Bath room and other in Hall)
20% | At the time of this Agreement within 15 days |
30% | At the time of Registration of Undivided share of Land payment to be made within 30 days from the date of Agreement |
15% | On laying roof slab in this flat |
15% | On completion of Brick work in this flat |
10% | On completion of Plastering in this flat |
5% | On completion of finishing work in this flat |
5% | The final payment on completion of the flat |
There are still few places in Chennai's neighborhood which offers a breath of refreshing freshness. Yet just minutes from the prominent destinations of the city. Our project is located at the neck of tambaram, a prime part of South Chennai the residential flats are built in the scape of two floors with ground floor dedicated exclusively for parking, and the best of better homes designed in the floors are done by well experienced architects & constructed by our craft's men with great core.
#247/B, Velachery Main Road, Selaiyur, Chennai, Tamil Nadu, INDIA.
Projects in Chennai
Completed Projects |The project is located in Medavakkam, Chennai, Tamil Nadu, INDIA.
Apartment sizes in the project range from 750 sqft to 936 sqft.
The area of 2 BHK apartments ranges from 750 sqft to 936 sqft.
The project is spread over an area of 0.70 Acres.
The price of 2 BHK units in the project ranges from Rs. 53.74 Lakhs to Rs. 67.07 Lakhs.