Kadavanthra bridge construction progress

Replies (3)
1
This project keeps on getting derailed because of material shortage. Earlier it was sand shortage. Despite having the permission to be able to quarry now, there still is a gravel and granite shortage here.
Amal Anthony


2
Yes, the GCDA are currently facing a shortage in gravel and granite, which is why they havent been able to proceed with the construction. Both the Kadavanthra bridge and the Kadavanthra market bridge have been put on hold:(
Smitha Ravi


3
Ok so I have some bad news for you. The construction work on the bridge has been stopped temporarily due to some unavailablity of materials.
Rajagopal Menon


4