Q: Guys please tell me about the upcoming Maradu water treatment plant. Will it make the water condition better in Maradu ? Im considering this place for shifting. And when can we expect this to be ready?
As of now the delay is happening because alhough all three pumps at the Piravom river have been installed to pump water to the treatment plant located 22 km away.
Other than Maradu, localities like Fort Kochi, Mattanchery, Kumbalanghy, Chellanam, Thevara are also likely to benefit from this project, so you can consider those places as well.
Once the 100 mld project is commissioned, it will solve the drinking water issues of Kochi to some extent. I think Maradu will reap the most benefits, because the water plant is right here.