Rs , sq ft

Removed from Shortlist

My Shortlist ()
Keep track of your shortlisted properties here. Shortlist a property to get started.

Maradu water treatment plant

Q: Guys please tell me about the upcoming Maradu water treatment plant. Will it make the water condition better in Maradu ? Im considering this place for shifting. And when can we expect this to be ready?

Reply

Replies (8)
1
Yes, and currently only one pump is being utilised in a two-hourly gap because of the small power capacity at the plant site.
Deepak Shetty


2
As of now the delay is happening because alhough all three pumps at the Piravom river have been installed to pump water to the treatment plant located 22 km away.
Abraham D'souza


3
Other than Maradu, localities like Fort Kochi, Mattanchery, Kumbalanghy, Chellanam, Thevara are also likely to benefit from this project, so you can consider those places as well.
Suneel Chakyar


4
The most important thing that the project needs right now are the transformers to augment the pumping, and they will reach here by end of the month,
Rajiv Unnithan


5
The budget for the Maradu water treatment plant is going to be Rs 210 cr, and the works are supposed to be completed by the end of this year.
Vivek Varrier


6
Once the 100 mld project is commissioned, it will solve the drinking water issues of Kochi to some extent. I think Maradu will reap the most benefits, because the water plant is right here.
Ashwini Eradi


7
What 100mlds! This plant has been providing less than 10 mld because of incomplete works in pipeline laying and adequate power connectivity.
Naresh Valiathan


8
Yeah this project is under the Jawaharlal Nehru National Urban Renewal Mission, The whole plant will have the capacity of supplying 100 mlds of water.
Arjun Sridhar


9

Ask a Question
120 Characters Left











    CommonFloor Property Search Mobile App now available on Android, iOS and Windows!