Whom to escalate for the work not getting done in CS6-1206 Capetown

Q: 1. Handle missing in all doors. Alluminium handles mentioned.
2. Lock quality is very poor
3. Name Plate is missing
4. Master Bed-room switch is defective
5. Shippages in master bed-room
6. Gap in the the bathroom-false-roof above window
7. Sliding tower bolt are of steel. Alluminium tower bolt mentioned.
8. Drawing room Floor has not cleaned. Has lots of spots.
9. Kitchen balcony has shippages.
10. PM untraceable
11. White cement filling between the tiles are not done
12. Intercom is not fixed
13. RO is not installed
Replies (3)
1
Hi Kamal!!!!
If your builder has failed to provide you with the promised amenities in your housing society and has not handed over the deed of completion and occupancy certificate to you, you can move the consumer forum for justice despite a delay in filing complaint.
Saran


2
Hi folks,
Recently Supertech Capetown was in news for falling of concrete slab on kid. Now, you can decide on the quality of their construction and they are blaming residents for their poor quality of work. This happened with them just after a year of taking possession. Only God knows what will happen after 50 yrs.
Yasheen Anwar


Hi friends!!!
I am not a victim of this project and live in a DDA flat for 35 yrs. in Delhi. I often used to say people that DDA used poor quality construction material but i can say that something like this never happened in DDA flat. But if the plaster is falling from the terrace within a year of possession, that is a sign of very bad construction quality.
Tushar Sinha,  Delhi-NCR
17th May 2016


3
Hi,
Buyers of Supertech Capetown have already written a letter for delay in completion of CC-1 by more than 2 yrs and demanded delayed penalty @12%. They want all the affected buyers to form a group to take on Supertech in consumer forum for compensation at reasonable rate instead of Rs 5/- psd as in the agreement.
Mukhesh


Hi Mukesh,
I am one of the victim of Supertech Capetown which they had promised for possession 3 yrs ago and still have no news on what's happening there. After reading the review of other people like 24% interest and labour charges and no compensation for the delay makes me feel that i made a wrong decision on buying this property.
Saran,  Noida
17th May 2016


4

Ask a Question