Q:Supertech North Eye project is delayed for 10 years, still under construction ,interiors not done. Supertech is demanding 20% of the cost stating superstructure is ready.I have a studio booking on 26th floor which is incomplete.Would like to get input from other allottees of North Eye for taking proper steps.
Q:1. Handle missing in all doors. Alluminium handles mentioned.2. Lock quality is very poor3. Name Plate is missing4. Master Bed-room switch is defective5. Shippages in master bed-room6. Gap in the the bathroom-false-roof above window7. Sliding tower bolt are of steel. Alluminium tower bolt mentioned.8. Drawing room Floor has not cleaned. Has lots of spots.9. Kitchen balcony has shippages.10. PM untraceable11. White cement filling between the tiles are not done12. Intercom is not fixed13. RO is not installed
Latest Answer: Hi Kamal!!!!
If your builder has failed to provide you with the promised amenities in your housing society and has not handed over the deed of completion and occupancy certificate to you, you can move the consumer forum for justice despite a delay in filing complaint.
Q:Since couple of days we are noticing that the supertech capetown is experiencing problem in supplying regular electricity. As far as supply is concerned the plot next to Capetown i.e. Ajnara is receiving electricity 24X7. Even the slums in between are receiving supply without any fault then is Supertech Capetown are defaulters in paying the bills?
Latest Answer: Hi Suneet,
Is it true that construction quality of Supertech Capetown is not good? I recently heard a news somewhere that a 3 month old infant suffered minor injuries after the roof of a flat in Supertech Capetown in Noida collapsed.
The owner of flat had brought the property in November 2015 and paid around Rs 50 Lakhs for the unit. Can any one Suggest me that, should I buy a flat in Supertech Capetown or not ?
Q:I heard about this capetown project. I am planning to invest on this project. I want to know when is the possession of this project. Kindly provide some information about bank approval of this project.
Latest Answer: Hmm Arvind the project is under construction and going to get complete by the end of 2014. I would like to suggest you to take a grace period of 5-6 month to be on the safe side.
Latest Answer: Hi ,
I am planning to have a 3 BHK apartment in Supertech ORB. I would like to know the special payment plan of this project. What are the amenities i can get from this project?