Information on Quality of work of Tirupati Balaji Builders and Developers Pvt Ltd

Q: Tirupati Balaji Buiders and Developers PVt Ltd New Panvel
Information on Quality of work of Tirupati Balaji Builders and Developers Pvt Ltd New Panvel Mahendra P.K. Singh is managing director.

Reply

Replies (81)
1
Tirupati Balaji Builders & Developers Pvt. Ltd.
Balaji Residency Phase 3 Akurli

Can anyone in this forum please guide me how to start cancellation process of flat legally.
Also members of Balaji Residency Phase 3 Akurli, can we form a whatsapp group.

K S RANA
Ph 900 423 4723
K S RANA


2
whats is the status of case
Praveen Vishwakarma


3
Yesterday H'ble Alibag court postponed hearing on anticipatory bail of other Directors of TBG and bail of Mahendra and Bablu till 18.06.2016. Court also directed to Police and Public Prosecutor to merge all FIR against TBG. Dear consumers, Investigation of EWO is till going on and they has to submit charge sheet against them. Then we will take further legal action. PICTURE ABHI BAKI HAI Dosto.
rajiv sonwane


Even Padamavati Builders and Developers did promised this almost 2.5 years back. Now people who have cancelled there booking are struggling to get there money back. Mr. Vidhya Prakash an allied of Mahendera Pawan Kumar was absconding for couple of day.
Praveen.
Praveen,  Mumbai
24th June 2016


Hi Pravin.
I have cancelled the Booking in Padmavati
They are nor receiving any calls.
Anyone who had Done the Same. Please contact me. 9833091337. So that together we can file a case.
Vinayak Sawant,  Mumbai
5th August 2016


Hi Vinayak,

we all need to get connected and lounge a fraud complain about Padmavati as well.

Few of the people I know too who have been cheated by them.

Regards,
Praveen Singh.
09867972031.
Praveen,  Mumbai
12th August 2016


I, myself Amol Shejale. I had also booked a flat in Balaji Residency-II. I came to know about all this just now when i was searching for their website. Last two months I was trying to call Bablu and office and no one was picking up the phone. and now i came t know this. This is really shock for me. Please keep me informed about the developments.
AMOL SHEJALE,  Navi Mumbai
21st August 2016


Till date all Director's of Tirupati Balaji are under judicial custody. They are applied for bail and today we are strongly opposed to grant bail them. Next date given by H'ble Panvel Court is 05/09/2017. Kindly make UNITY that day.
rajiv sonwane, Apartment Resident 
23rd August 2017


I my self, Amit Singh, I am also a victim of padmavati builders and dedevelopers fruad, i had booked 2bhk in Padmavati Lifestyle in year 2014,
if anyone have any details, pls help me out
regards
Amit
18th August 2019


4
Hi friends!!!
I had booked a flat for my son on 9th Dec- 2012 through Tirupati Balaji Builders & Developers Pvt. Ltd. for their project ”Balaji Kalash” in ph-3 by paying 10% booking amount as asked. This was to be completed within a period of 2 yrs and possession promised during June/July 2015. I had been regularly visiting the site at Adai as well as their office but till last month neither the work has been started nor promises fulfilled by the builder on starting the construction work.
Purva Parundekar


Hello Purva!!!
We all are facing the same issue and our money has got stuck. More than 1000 booking have been done in this project as well as other 4-5 projects located within the vicinity of New Panvel. Builder has promised in January this year to start the project within 3 months or will refund the amounts collected as soon as possible. However, neither the construction work nor collected amounts refunded to me and many other cancellations done by the consumers. I don't know what will happen in the future.
Hitesh Thawani,  Mumbai
31st May 2016


5
Dear Friends,

A home of your own: dream or delusion?

Fraud ... Tirupati Balaji Builders & Developers Pvt. Ltd.

I have booked flat with Tirupati Balaji Builders & Developers Pvt. Ltd. (Balaji Residency - Akurli project) in the year 2014 (August), but still bhumi pujan is yet to be done...(God knows when it will be done).i went to office many times (Mentally exhausted) and it is closed, also no one picks phone. After checking i found they(Tirupati Balaji Builders & Developers Pvt. Ltd) have NOT got any approval from CIDCO for Akurli project.

Guys please checkout below links:

http://www.livemint.com/Money/tnN8gXcWST7HlVZ39sFRjP/Home-builder-delay-may-need-legal-action.html

http://economictimes.indiatimes.com/wealth/real-estate-woes-after-unitech-home-buyers-take-legal-route-against-builder-frauds-delays/articleshow/50569318.cms

http://www.powertoconsumer.in/blog/2015/02/14/filing-a-case-against-a-builder/

K S RANA
Ph: 900-423-4723
K S RANA


owner is in police custody till 11th May. visit at khandeshwar police station and file ur complaint.
8th May 2016


6
Please post copies of FIR if anyone have it
Sameer Patil


7
Investors in Balaji ARCADE (Balaji Buildcon) project. Plz share your contact number so that v can have a proper follow update...
VIJAYKUMAR


I have booking in Balaji arcade phase IV. Please contact me if any one have update on this case

Sagar Ghole
9930469077
Sagar Ghole,  Mumbai
10th May 2016


I am also waiting for updates
Sachin, Apartment Resident, Mumbai
10th July 2016


If any updates please contact 9221253550
Sachin, Apartment Resident, Mumbai
10th July 2016


i also have booked a flat in Balaji Arcade Extension please add mi in your group for the information updates. 8108872008.
22nd August 2016


hello friends!!!!!!

I also booked a flat in BALAJI ARCADE PHASE-IV . Please add mi in your group if any one have . so i also got any updates n information.

Nilesh Mapelkar
8082410803
4th November 2016


8
Dear Friends,

A home of your own: dream or delusion?

Fraud ... Tirupati Balaji Builders & Developers Pvt. Ltd.

I have booked flat with Tirupati Balaji Builders & Developers Pvt. Ltd. (Akurli project) in the year 2014 (August), but still bhumi pujan is yet to be done...(God knows when it will be done).i went to office many times (Mentally exhausted) and it is closed, also no one picks phone. After checking i found they(Tirupati Balaji Builders & Developers Pvt. Ltd) have NOT got any approval from CIDCO for Akurli project.

Guys please checkout below links:

http://www.livemint.com/Money/tnN8gXcWST7HlVZ39sFRjP/Home-builder-delay-may-need-legal-action.html

http://economictimes.indiatimes.com/wealth/real-estate-woes-after-unitech-home-buyers-take-legal-route-against-builder-frauds-delays/articleshow/50569318.cms

http://www.powertoconsumer.in/blog/2015/02/14/filing-a-case-against-a-builder/
K S RANA


All consumers of "Balaji City", S.No. 16/1a & 17, Vihighar, Panvel are requested to present at the H'ble Court, Old Panvel on 08.05.2016 (Sunday) for put up our grievances to the Court and extend PC of Bablu Gupta. I have a list of 86 consumers who have join us till date. If any person want to join us pl. bring their documents (5 copies each) for update information of consumers and finalised list for handed over to Economical Offence Wing, CBD, Belapur. All consumers who have not join on or before 08.05.2015 their names are not included in the said list. All consumers also noted that they have to bear some fund for fees of our advocate and expenses towards legal action taken various level. It is also noted that we are not given surety or guarantee to any body for refund of money form Bablu Gupta. But we are legally fighting by various action.

Rajiv Sonawane
Mob. No. 9869210441
rajiv sonwane, Apartment Resident 
4th May 2016


All victims of Tirupati Balaji Group are requested to lodge FIR against MD, Mahendra Pawankumar Sing and all Directors including wife of MD who is also one of the Director at Khandewar Police Station, New Panvel and handed over proof of cheating done by this group. Mahendra Sing is in Police Custody up to 11.05.2016 and Bablu Gupta up to 08.05.2016. Other Directors are not traceable till date. But at the earliest they will be arrested by Police.
rajiv sonwane, Apartment Resident 
4th May 2016


I have booking in Tirupati Balaji Builders & Developers PVT Ltd. (Akurli Project) phase 2. Please contact me if any one have update on this case

VENKATESH NAIDU
9920047936.
4th August 2016


9
Hi,i have booked flat in balaji city but still they are not yet done with bhumi pujan.i went to office and it is closed fom last 15 days even no one picks phone all there phone numbers are temporary unavailable. I came to know that the there is issue between the landowner ad bablu gupta.they have not got any approval from cidco fom past 1 year.Please contact me if anybody haveany other further details.mobile number 9967333546
Amol Ghokshe


hi Amol, first go and file police criminal case against bablu gupta. they are known as a cheater. Do not wait for their invitation. Project approval pending from since last three years not last one year. I am lucky that i took quick decision to withdraw the money before last two year and i received my all money. Thank God.
25th April 2016


Hi Amol Gokshe, On whatsapp "Aditya Balaji City" group in action from March 2016. The lodged FIR and yesterday on 24.04.2016 Mr. Bablu Gupta in police custody. Today I heard that he is not getting bail. Pl send your full Name, Amount paid and Mob. No. to 9869210441 by SMS. I will add to you in this group. so you will get updates.
rajiv sonwane, Apartment Resident 
25th April 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


Good to know that....Mahendra PK singh is arrested, but what after that?
K S RANA,  Mumbai
30th April 2016


10
This Builder is cheater, he has cheated many people in the name of 1) Tirupati Balaji builders & developers 2) Aditya Builders And Developers Private Limited 3) Tirupati Builcon Private Limited. At the current situation, all have been absconded. This builder even might has taken a fraud medical certificate. A Strong action is need to be taken against this type of builders. He is just giving and given a false promise, by showing his fake money power. all this money belong to investors only
Sapna


Hi sapna,
I have booked a 1bhk in Padmavati lifestyle. Want to cancel it. But builder is asking to surrender all original documents to cancel the booking. What should i do.
Vinayak Sawant,  Mumbai
10th April 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


11
No any body pick-up the phone from Aditya Builders panvel office. Mr. Bablu Gupta and TBG not responding my email. kindly updates please.
rajiv sonwane


Now it is learn from the other colleagues that Mr. Bablu Gupta after discharging from "NEER" Hospital will hold meeting at his Panvel office on 22.03.2016 at 4.00 pm regarding recent status of "Balaji City", Vihighar. Also he assured that Bhoomi Poojan will be conduct on occasion of "Gudi Padva". However, after inquiry at CIDCO that there is no any proposal from Mr. Bablu Gupta or TBG Director Mr. Mahendra Sing or Other Directors for development of the said project. Also learn from Sub-Register Office, Panvel to register sale deed of the said Survey No. 16/1a, N-17, Vihighar, Panvel in the name of Aditya Builders or TBG.

Kindly any new updates please.
rajiv sonwane, Apartment Resident 
21st March 2016


Now on site there is board of "Sagar City" in lieu of Balaji City, Vihighar, Panvel. Deal with Mr. Bablu Gupta has cancelled by Mr. Sagar Patil owner of the land and his is own carried out the project in the name of Sagar City. But till issue is pending whether Mr. Patil has kept customers who have already booked or return the money those want cancellation. Also pl guide me if Bablu has handed over or due to cancellation of his deal what about my booking? If Mr. Patil demanded extra money for my booking then what I can do. Because he can say if you want to cancel the booking and return money Mr. Gupt is responsible. From today Mr. Gupta is treasable.
rajiv sonwane, Apartment Resident 
8th April 2016


We have created a whatsapp group for Balaji Kalash Project (Phase - 1). If any of the same phase interested to join please write to me with your details (e.g.Name, Mobile No., Flat No., Flat area, etc.).
9th April 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


This is Ajay Karanjekar, I booked flat in Balaji Kalash Phase 3 in Dec 2012.
Every time these bugers gave some or the other reasons, for last 6 months i was not able to trace any of them.
Please ad me to the whatts App group so can take some joint actions
My cell number - 9920386669
29th April 2016


Hi I am rashmi I have also invested in aditya builders vihighar 1rk and their panvel off is sealed by local police if u have whatsap group add me my no 9833870017
6th May 2016


12
I have booked flat in Balaji City, Vihighar, Panvel which is the up coming residential project of Aditya Builders and Devlopers who is one of the builder joint with TBG, Navi Mumbai. Yesterday I was received call from Mr. Anna who is employer of Aditya Builder that Bhoomi Poojan Celebration on 5th March, 2016. Kindly intimate me all consumers who booked in the same project that they have any update about this project.
rajiv sonwane


Hi Rajiv,
I had inquired about this project and its approval, i found that Balaji Dream City is HDFC, Standard Chartered and ICICI approved project. As far as project possession is concerned, it will be around December'2017.
Ravi Waghmare,  Mumbai
16th February 2016


Hi Rajiv,
Instead of making call to them you should mail and ask for the current status. In this way you will get evidence of discussion which will help you in near future. or, you should visit the project site to check the ground reality.
Shantanu Kumar,  Mumbai
16th February 2016


I have already sent mail to the Aditya Builders and Devlopers in details but he is not replied,
rajiv sonwane, Apartment Resident 
16th February 2016


Mr. Ravi Waghmare & Mr. Shantanu Kumar kindly intimate me your mobile no. My mobile no. is 9869210441
rajiv sonwane, Apartment Resident 
16th February 2016


hi rajiv, i have also booked in the same project and yesterday visited the site and office too..there is no progress so far ....was told that bhumi pujan wil be in mid march ...land papers are still not in his name ...plz visit and enquire more....my mobile no. is 9869141689 ...update me too if have any further details abt the project...
21st February 2016


Builder booked for cheating homebuyers in New Panvel. Column in HT Media. THANE II. Case is registered under section 420 on Wednesday. I think it Tirupati Balaji Builders only
26th February 2016


Till date I have not received any phone call or msg from Aditya Builder, Panvel for Bhoomi Poojan of Balaji City, Vihighar, Navi Mumbai. Kindly posts any updates.
rajiv sonwane, Apartment Resident 
6th March 2016


Since Mr. Bablu Gupta not sitting in his office, not pickup the phone calls so many consumers are withdrawing their money. It is learn that Mr. Gupta has return money to them by SBI cheque due to his bank account at ICICI is closed by bank for "insufficient fund". Mr. Bablu also agreed that those are not cancelling the booking he will given written on stamp paper notified by Notary for possession in March 2017 he will pay monthly compensation to them. I don't know how I trust Mr. Bablu. Because he is not pick up my phone, not answer to my email or not meet at his office. Kindly suggested what action I do in this situation.
rajiv sonwane, Apartment Resident 
5th April 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


13
Hi Guys..
Any update or news on Tirupati Balaji builder..
I have book flat at "Kashish Park".
yogesh juwatkar


As CMD Mahedra said, they are still studying about soil. How long will take God knows.
21st January 2016


Hi Yogesh,
I recently talk to their sales guy and found that they are giving possession Kashish Park in December'2016. How is it possible when they are studying about soil? I think there might be some other reason of delaying.
29th January 2016


Hi Yougesh,
Tirupati Balaji Builders & Developers are giving possession kashish Park in June 2017 as per their executives.
Arushisha,  Mumbai
3rd February 2016


Hi Yogesh,
What wuld be resale prices of 2BHK in Kashish Park all inclusive? Any idea? Is the locality livable?
3rd February 2016


Mr. David, after reading whole negative feedback regarding to TBG, u are still willing to invest here? don't buy your dream home here.
8th February 2016


New Real Estate Bill :

Prime Minister Narendra Modi's government on Tuesday approved changes to a Bill that seeks to regulate the country's property market, notorious for black money and delayed possessions. The Real Estate (Regulation and Development) Bill, 2013 is aimed to protect the interest of consumers from errant developers and ensure timely execution of projects.

Here are 10 ways how the Bill will help property buyers:

1) Each state will get a real estate regulator, which will settle disputes and impose compensation. All housing and commercial projects will have to be compulsorily registered with the regulator so that buyers can have access to genuine projects. Ongoing projects that have not received completion certificates will also be covered.

2) Developers cannot advertise or launch projects without prior registration with the real estate authority.

3) Sale of property on the basis of super area (area in which a flat is spread plus common area such as lobby) w
9th February 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


14
Dear All, this is an request to all kindly come together to recover our money. Who all had cancel their bookings with Balaji and not got the money back.
Anupama Khaitan


Hi,
I wish to buy residential property and since Mumbai is extremely expensive, I have chosen to settle down in Navi Mumbai. I would like to hear from all the experts here as to which area will be most suitable one to prefer and its benefits?
6th January 2016


Hi Sashi,
If you really want good investment you have one another option which is in Khopoli, Navi Mumbai. Bajaj Habitat Builder and construction company offering a very good investment opportunity with major facilities and amenities. Ongoing project of Bajaj Sahil is available for booking of 1BHK and 2BHK flats with super deluxe rooms.
Arushisha,  Mumbai
6th January 2016


Anupama Khaitan, we too came to know today that Tirupati Balaji Buiders is not responding call ........can you tell me whats is goign on as we had booked flat in Tirupati balaji panvel Balaji Residency project in jan 2014 . since then it has has not even started & always the reason is paper are not cleared.
Please feel free to contact me anytime via e-mail at besumitbe@gmail.com, or on Skype at bpshbp or call me 919004108811
bpshbp,  Mumbai
11th January 2016


Hi,
i have booked in balaji kalash 2 years back, no registration yet. today evening i got the news that builder is absconding, police case is filed. last sunday a lot of people gathered in new panvel office etc.
i just want to know if the info is correct. pls if somebody knows the actual picture pls bring it in front of all of us.
rajan L,  Navi Mumbai
13th January 2016


Now everyone might have understood that the value/motive of my review. The builder Tirupathi Balaji Group is absconding with 100 Cr. and more than 600 people has under gone their trap though like you people. The scam is under investigation and not a single money will get
He has started the builder business in different name like TBG, Aditya, Balcon etc..... Every one lost their money and he has arranged a medical certificate as Brain cancer patient from Fortis, Vashi for bail. Any way I've taken my money back.
14th January 2016


today i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


Hi, snehal keluskar i booked flat in balaji kalish i also heard new about the arrest of Mr yogesh Sharma director of T.Balaji properties.. what can do all of us can we gathered on 17th jan on new panvel head office
15th January 2016


Hi all,
plz let mi when all of us gather in panvel , plz share when coming all of us ...
15th January 2016


Guys i already mentioned a post that withdraw ur money from TBG, which i did in last year. they will not give proper response to u. God thanks i m safe.
17th January 2016


9920758444 Mr. Zha from TBG. contact him he us accountant of TBG
17th January 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


15
I have recently booked a flat at Tirupathi balaji dream city.panvel but project is not started yet . Can anybody tell me what is going on with this project
sanket ambre


oday i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


Dear Sanket I too booked the flat in the same project. Kindly share your contact details for further discussion
23rd March 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


16
My friend have recently booked a flat at Tirupathi balaji Govind dham. Can anybody tell me, is the builder really genuine?
Sahil Sharma


oday i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


17
frod................
Sandeep Golatkar


Hi Sandeep!!!
What is your opinion about this builder? Do you have any updates on Tirupati Balaji Builder's project, Balaji Kalash Ph-3? Plz. share with us as lot's of flats owners are waiting for their flat possession.
Sunil Joshi,  Mumbai
10th September 2015


Hi Sunil,
I think you should study a lot before your investment as lot's of buyers are facing the same issues but at the same time you should find out the realty visiting the project site. May be someone wants to make the developer's image dull.
Monica,  Bangalore
29th September 2015


Hi Sunil,
The land is plane still after 5 years. There is no construction work happening. People are waiting because they have invested while the property rate was just 2700/sq-ft. and now the current rate is Rs. 4500/sq-ft. If they will withdraw they wont be able to book another building with the same rate. It is also come to hear that they have not submitted the document to CIDCO properly.
Rakshit,  Mumbai
30th September 2015


Rakshit you are correct.

Monica, I think you are from banglore as mentioned in your signature, I have very bad experiance of TBG group. I have withdrawn the money from the project. Nobody has made the builder image dull. It is actual situation.
10th October 2015


Yes, in phase-2 &3 lot of flats are vacant. People are withdrawing the money from Builder. They can't even complete there existing phases. Already, lot's of people are struggling with this project. This could be a lesson for the new buyers, don't invest your hard earned money without checking the legal aspects of the project.
20th October 2015


Yes, a new buyer should always prefer under ready-to-move property instead of under construction. You may face delay issue, loan EMI issue with under construction project. But in a ready-to-move property, you have only to pay the booking amount and rest of the payment as per slab basis.
Debanjan,  Noida
20th October 2015


Dear All, After waiting for 3 years i have choose option to withdraw my money, They have issued me 4 cheques in July month. All of them are dishonoured. Still I have not received my complete money back. Neither they are picking the phone nor giving any response. I am following with Mr. Bablu Gupta and Mr. Jha since last 4 months, but no response
Atul Khare
Atul Khare,  Navi Mumbai
8th November 2015


Hi,
i have booked in balaji kalash 2 years back, no registration yet. today evening i got the news that builder is absconding, police case is filed. last sunday a lot of people gathered in new panvel office etc.
i just want to know if the info is correct. pls if somebody knows the actual picture pls bring it in front of all of us.
rajan L,  Navi Mumbai
13th January 2016


today i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


18
Tirupathi Balaji group at New panvel is not genuine party. Their first project is not been started yet. After booking we are waiting for 5 years to start the project. But not yet been started even. Lot of people are struggling with this group. Those who want updates of the projects please join commonfloor forum.
Girishma M Pothan


aap ke paas book karte samye koi to slip ya koi raseed hai to hame dikhaiye
mujhe balaji group mein ek flat book karna hai par jab se maine aapka comment dekha hai tabse mere dil mein daot aagaya hai
plzz aap mujhe koi proof dikhaiye
3rd September 2015


I would request you to share some current updates on forum so that people will aware of the reality. This will help a lot of genuine buyers. People, scared of sharing their mobile nos in forum because anybody can misuse the no. Thanks....
Sunil Joshi,  Mumbai
3rd September 2015


after 2.5 years i have withdrawn the money. and had return the money in two slot after struggling.
4th September 2015


Deepakji, Poora 60 aathmi ka raseed apko milenke. Whats app me join keejiye. Apko or details miljayega.
4th September 2015


Sunilji, What I have mentioned is current status only. The land is plane still after 5 years. We people are waiting because the money was them with for last 5 years amounting 5 lakhs. If we will withdraw we won't be able book another building with Rs.2700 rate. More over they are not ready to pay interest of paid amount. The builder also is delaying purposefully for his benefit. That every one knows. The maximum withdrawals benefit to builder by reselling the same on current rate ie.4500. But we people who were invested by loan and paying the interest over and above monthly rent. Bulder is enjoying and the investors struggling. He is not even submitted the documents to Cidco properly. Oncwe they have rejected and asked to resubmit. We are very much worried,
4th September 2015


@Girishma...
As a buyer, you should be aware of the protection that is available to you in the event of the late delivery of the immovable property you have purchased and also some of the things you need to avoid including in your contract.

In case there is a delay in a project and the builder is not willing to pay a compensation as discussed in the builder-buyer agreement, buyers can approach the Consumer Court or the civil court for the execution of the penalty and grievance redressa
Sunil Joshi,  Mumbai
9th September 2015


I think Sunil is right.....
It is right time to send a legal notice on consultation with a competent lawyer, clearly stating consequence on failure to deliver property immediately. If builder does not respond to the legal notice, you should either file a complaint in the consumer forum or file a lawsuit in the civil court against the concerned builder.

As per Consumer Protection Act, 1986, buyer can file a case with the consumer forum for a quick redressal of his grievances.
Ananya,  
9th September 2015


i think we all need to get together and stand against same
Hanmant Pawar, Apartment Resident, Mumbai
15th September 2015


i think we need to stand together against same.
Hanmant Pawar, Apartment Resident, Mumbai
15th September 2015


Dear Sandeep can you please help me with your contact no. I am also one of the victim. Just wanted to know how you have recover your money. My no. is 9833205284.
Anupama Khaitan,  Mumbai
31st December 2015


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


19
If anyone want current updates on Balaji project please mail us on uupdator@gmail.com
Updator


Hi Updator,
What is the current status of the project Balaji Phas-3? I have booked a 2BHK in it. When are they giving possession of this phase? I heard a lot of bad news about the locality. Is the locality safe for family living? I also want to know the construction status of this phase.
Sunil Joshi,  Mumbai
20th August 2015


It is came to know that In phase 2 &3 lot of flats are vacant. People are withdrawing the money from Builder. They can't even complete there existing phases even after 4 years. Lot's of home owners of this projects are struggling with their held up money.
Arushisha,  Mumbai
21st August 2015


I already booked a 1RK flat in Sadguru Angan in last year Dec-2014 but work not yet start.
Sunil,  Mumbai
28th August 2015


Tirupathi Balaji group at New panvel is not genuine party. Their first project is not been started yet. After booking we are waiting for 5 years to start the project. But not yet been started even. Lot of people are struggling with this group.
2nd September 2015


Those who want updates of the projects please join with our whatsapp group 9321160350
2nd September 2015


Today i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


20
Please share your contact I have current updates on Balaji phase 1234
Updator


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to allow that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, most of things are not available. so think before u invest. I think ulwe is better option that panvel.
17th August 2015


Tirupathi Balaji group at New panvel is not genuine party. Their first project is not been started yet. After booking we are waiting for 5 years to start the project. But not yet been started even. Lot of people are struggling with this group. Those who want updates of the projects please join with our whatsapp group 9321160350
2nd September 2015


Many comments which you find on common floor for example 1) its nice project 2) I booked 3) I m staying in Balaji 4) best deal bla bla bla bla all fake please don't cheat middle class people the reality is not a single project started but they received booking by diifrent names of project. They not even purchased land. If you really want to know the reality please visit Cidco office . they always show some kind of NOC and papers but please don't believe them . I challenge them if they really have all document or they started work tell there to share Cidco link on this page. Please don't put your hard earn money before you put your singe penny ask for all documents then show you it to your lawyer and cross check with Cidco too. Don't just go for low rate .
One more truth that this group never handover single house to anyone .
18th October 2015


Many comments which you find on common floor for example 1) its nice project 2) I booked 3) I m staying in Balaji 4) best deal bla bla bla bla all fake please don't cheat middle class people the reality is not a single project started but they received booking by diifrent names of project. They not even purchased land. If you really want to know the reality please visit Cidco office . they always show some kind of NOC and papers but please don't believe them . I challenge them if they really have all document or they started work tell there to share Cidco link on this page. Please don't put your hard earn money before you put your singe penny ask for all documents then show you it to your lawyer and cross check with Cidco too. Don't just go for low rate .
One more truth that this group never handover single house to anyone .
18th October 2015


Today i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


21
The location of the project is quite good as you can find a hospital and school. It is also situated within 15 to 20 mins of the railway station and the airport. The amenities provided include a club house, power backup, swimming pool, lift, security, park, reserved parking, visitor parking, intercom facility, gymnasium etc.
Rashi Sawant


Can you suggest any good project of TBG in New Panvel? What will be the price of 2BHK and its current price per square feet? Can you share some details and the payment plan of the project as well?
Devika,  Mumbai
4th August 2015


i suggest u that invest in 12.5% cidco project it is very safe to invest and no illegal projects. all facilities approve by cidco. all areas are reserved by cidco for school, garden, roads, and many more.
17th August 2015


Hi Devika,
Please, do not do any booking only on the basis of the brochure, some presentation or looking at a sample flat.

Make sure you visit the actual project site and see the location, how well connected the area is city, how are the roads, what is nearby the place and other important factors. A lot of people book properties in real estate expo and exhibition, which I do not think is a good idea at all.
pradyumanapte,  Mumbai
3rd September 2015


Many comments which you find on common floor for example 1) its nice project 2) I booked 3) I m staying in Balaji 4) best deal bla bla bla bla all fake please don't cheat middle class people the reality is not a single project started but they received booking by diifrent names of project. They not even purchased land. If you really want to know the reality please visit Cidco office . they always show some kind of NOC and papers but please don't believe them . I challenge them if they really have all document or they started work tell there to share Cidco link on this page. Please don't put your hard earn money before you put your singe penny ask for all documents then show you it to your lawyer and cross check with Cidco too. Don't just go for low rate .
One more truth that this group never handover single house to anyone .
18th October 2015


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


22
good projects to see. I have a Flat in Balaji Sneha dham. m staying in Sneha Dham.. good quality construction..
Nitin kale


What is the price they are quoting for 2BHK in Balaji Sneha Dham? I need some useful details such as payment plan and possession date? Are all the approvals are in place for this project?
Shreya Agarwal,  Mumbai
4th August 2015


Hi Shreya,
If you are seriously looking forward to buy the property and want to get a good deal, then do not show your eagerness to buy. Hide that over enthusiastic and needy person inside you.

The agents/sales executives are paid commission on closing the deal and they will go to an extra mile to close the deal with you. Show them that you are not in hurry and your life does not depend on the property. Show them that you are a serious buyer who is not in hurry and if they have to win you, you will require a good incentive to invest money.
Anuskha Chandan,  Mumbai
3rd September 2015


23
HI, i just visit in Tirupati Balaji Group projects there r so many project around 3km. very good projects
sarika w


Can you suggest some good project? As i am looking for a 2BHK and my budget is Rs.30-35 lacs.
Shreya Agarwal,  Mumbai
3rd September 2015


24
Recently i booked in balaji kashish park it is a CIDCO project & NAINA apruval project it was very nice project
sagar


tbg all projects are not cuming under cidco. so the rates are low and negotiable. i quit from balaji kalash project. it is not yet started from last 3 years.
2nd August 2015


I will suggest you move out from this project, I have exp. with this builder since last 3 years. Also this project is under High tention wire so be carefull.
Hitesh Niranjan,  Navi Mumbai
3rd August 2015


there are so many fake comments on tbg that it is good project. the comments are mentioned by tbg own team and most of similar.
3rd August 2015


Today i went to their new panvel head office to enquire about the arrest of Mr yogesh Sharma director of T.Balaji properties.. Mr ashok was only in office & every body was absconding.. Mr Bablu gupta cannot be contacted neither Madam Sneha. No idea where they are as told by Mr Ashok the receptionist. He has given phone of Mr Alok Singh One of the relative of Managing Director Mr Mahendra Pwan Kumar Singh. Mr alok Told that this sunday 17th . they are organising meeting in Vashi for all the customers were all the directors of TBG group will be present. they were supposed to inform the venue details but till now No info is received from their side. Pls if anybody has the better details pls share with all of us.
rajan L,  Navi Mumbai
14th January 2016


Mahendra PK singh is arrested & he will in police custody till 3 May 2016.
29th April 2016


25
I was booked in balaji sheh dham, that project interiar desin very nice
ketan


Hi Ketan,
I am planning to buy a 2BHK flats and my budget is 40-45 lacs. Can you suggest me some good project as well as good localities? It is my first investment so i am a little bit scared of TBG project. As there are lot's of negative comments are coming.
Arushisha,  Mumbai
3rd September 2015


Arushisha,

There are good projects in the area of Ulwe, karanjade, taloja in navi mumbai which comes under CIDCO. You can by your dream budgeted home here without any scare. Do not buy collector approved projects.
10th October 2015


26
They have number of projects in panvel might ve 25 runing projects are there in their group.. I have verifid in cidco offce. it is trustfull group so m going to book in balaji citi in chiple.. good locality n place.. wonderfull nature
Rashmi Veturekar


chiple nt comes under cidco
2nd August 2015


27
yesterday i have visited in sample flat of vichumbe constuction... it was awsome flat which m looking.. aminities n quality simply good to see. soon will book in kashish park..
sanika chavan


Never ever enter in to this project . Visit CIDCO office for more details.
Hitesh Niranjan,  Navi Mumbai
3rd August 2015


28
Realy it was a very good consctruction & good quility
mitesh gole


29
Tirupati Balaji Group is prominent builders from mumbai pune & new thane.. I m invester i have book in their 4 projects in panvel, Thane & Pune. I really liked their projects....
Sahil Dalvi


30
Im recenty book in Balaji snehdham project it is very nice project & very good construction.
harshda lad


31
I Pooja Sandim as per mail id Created , recently visited sites of Tirupati Balaji Group in New Panvel , I was given plenty of options as per budgets and staff was quite supportive. and i am decided the Book 1 BHK Flat in Tirupati Balaji Group.
Pooja Sandim


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to enter that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, load sheading, most of things are not available. so think before u invest. I think ulwe is better option than panvel.
17th August 2015


32
Tirupati Balaji Group has many good projects in New Panvel . so if anyone is interested to INVEST in property then go with TBG only, because they are giving best facilities and features .
Shweta Mane


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to enter that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, load sheading, most of things are not available. so think before u invest. I think ulwe is better option than panvel.
17th August 2015


33
Recentlya i booked 1BHK flat in Balaji City,New Pnavel which i found very nice. So i will recommend u all to try Once in Tirupati Balaji Group.
monika devre


34
I Shradha Dalvi buy then Tirupati Balaji Group is best place to INVEST . Recently i Book 1 BHK Flat in New Panvel. which i found very nice. so i will recommend you all to try once in TBG.
Shradha Dalvi


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to enter that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, load sheading, most of things are not available. so think before u invest. I think ulwe is better option than panvel.
17th August 2015


35
Tirupati Balaji Group is very good construction company realy that company buid states
guruprit shah


when? they have desided to start the projects from last 5 years in navi mumbai. But not yet start.
10th October 2015


36
Tirupati Balaji Group have many good projects in new panvel, New thane & pune soif anyone is interested to invest in Tirupati Balaji Group
sarita pawar


37
I Pranali Salve as per mail id Created , recently visited sites of Tirupati Balaji Group in New Panvel , I was given plenty of options as per budgets and staff was quite supportive , Also i have gone through the site visit and as i have been a satisfied customer , i recommend you to try atleast once , worth place and company to invest in.
Pranali Salve


have a site visit in night hours. no safe. i have invested before balaji kalash but no progress after three years so removed the money from the project after hard follow up.
17th August 2015


38
tirupati balaji group is good construction company in navi mumbai
nisha kadam


39
Tirupati Balaji Group has many good projects in New Panvel . so if anyone is interested to INVEST in property then go with TBG only, because they are giving best facilities and features .
Sakshi Chavan


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to enter that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, load sheading, most of things are not available. so think before u invest. I think ulwe is better option than panvel.
17th August 2015


40
tirupati balaji group is good construction company in navi mumbai
nisha kadam


41
Im invested in balaji kashish park it is very nice project
swati gupta


42
If you are looking for a property to buy then Tirupati Balaji Group is best place to INVEST . Recently i visited sites in New Panvel and Thane which i found very nice. so i will recommend you all to try once in TBG.
Hemant Jadhav


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to enter that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, load sheading, most of things are not available. so think before u invest. I think ulwe is better option than panvel.
17th August 2015


43
If you are looking for a property to buy then Tirupati Balaji Group is best place to INVEST . Recently i visited sites in New Panvel and Thane which i found very nice. so i will recommend you all to try once in TBG.
Nikita Raut


Hello Nikita,
Can you give me the current status of the Tirupati Balaji Kalash, New Panvel, Navi Mumbai? When are they giving possession for this project?
Shaunak Verdla,  Mumbai
10th July 2015


Hello Ms Nikita
I had invested in Balaji Arcade Phase IV last year september by paying 20%installment, but still no construction yet started always giving reason of CIDCO approval, most of investors invested since more than 2yrs yet they are waiting to start construction, how can we trust you nor your group bother to intimate or give call to investors for any assurance or development in this matter, please reply with favorably to regain investor trust, thanks, ANANT G.P.,Mumbai
Anant G.P,  Mumbai
27th July 2015


all projects comes under collector area and cidco giving only approval for construct the buiilding. mostly villagers staying nearby the projects and they will not allow cidco to enter that particular areas. It will take more time to get all facilities. there is no bus facility, only auto rickshaws and six seaters runs on sharing basis, roads are not wide, night travelling is not safe, general stores are not nearby, load sheading, most of things are not available. so think before u invest. I think ulwe is better option than panvel.
17th August 2015


44
Tirupati Balaji Group is good Construction Company in Navi Mumbai.
Nikita Raut


45
Tirupati Balaji Group is good company.
Nikita Raut


46
Hi everybody,
There are many reasons for project delay. While some project delays are caused due to developer's fault, delay in securing in project approval also lead to project delay. Consumers should be aware that a certain degree of due diligence and awareness about their rights can protect them against immoral practices by developers.
Chintakpujara


Right Chintak,
Before a project is officially launched in the market and offered to buyers, there are countless approvals that a developer needs to obtain from the state and central agencies and ministries. In any business, the longer raw material is held, the higher is the holding cost which, in addition to interest costs in case of borrowed funds. This causes an increase in the overall price of the finished product.
Rajiv,  
9th June 2015


47
Kindly drop your contact no for more details abt balaji group projects
Vikas More


Hi Vikash,
I am planning to invest in New Panvel. What is the current price per square feet you are asking and what will be the cost of 2BHK including all? When is the project possession date?
Chintakpujara,  Mumbai
22nd April 2015


Hi Vikas,
I came across this project and found that the project "Balaji Kalash phase-2" is delay for 2-3 yrs. What is the main reason of delay?
Anuj Gupta,  Mumbai
22nd April 2015


Hi Chintak,
Good to know that you are planning to buy property in New Panvel. Locality is under development and price is very economical. If you invest here and hold for at least 3-5 years then you will surely get a good return. The average property rate in New Panvel is Rs. 5450/sq-ft.
Sandeep Mhatre,  Mumbai
27th April 2015


Right Sandeep,
But if you book your property in Tirupati Balaji Builders & Developers project you will get a very attractive rate. Their project comes under Rs. 2500-4200/sq-ft. range. So if you are planning to buy property in New Panvel, go for the Tirupati Balaji Builders & Developers once.
Anirudh Patel,  Mumbai
27th April 2015


Hi Vikash,
Is there any 2BHK available in Tirupati Balaji Phase-3? What are the sizes available in 2BHK and it's current price per square feet? I also need payment plan and possession date.
Niyati Juthali,  Mumbai
13th May 2015


48
Hi everybody,
If you are planning to buy property in New Panvel then i would like to suggest Tirupati Balaji Builders & Developers Pvt. Ltd. Company was founded in the year 2008, the company today is one of the fastest growing and a key player in real estate development industry in Country. Tirupati Balaji Pvt. Ltd. has successfully maintained to form a strong client base in the whole Indian Subcontinent as well as N.R.I clients.
Mansoor Bithal


You are absolutely right Mansoor,
If you are looking for ongoing projects of Tirupati Balaji Builders & Developers in Panvel, Navi Mumbai then i would suggest Tirupati Balaji Kalash. And if you are planning for Bhiwandi then i would like to suggest Tirupati Balaji Pushpa Kalash.
Roshni Pawal,  Mumbai
16th April 2015


we know this, it is all mentioned in their prifile but making fool to people. still no any priject completed. i withdrawn my money from this project after 2 years. no approvals for project. all projects located in gaonthan area.
16th April 2015


49
Guys, from past few month, i was searching property in new panvel. i heard about Tirupati Builders. Before investing i read all this column and just wannat know about this builder. has any 1 been allotted a flat.
Sapna Shah


do not invest in tirupati, my suggestion to u all
7th April 2015


if u want to invest go to ulwe connected to palm beach for future good returns. rates starts from 4200/-
7th April 2015


Hi Sandeep,
Why to invest in Real estate market of Ulwe , Navi Mumbai? What happened to the Navi Mumbai Internation Airport? Will the construction work of Airport will start or not?
Sandeep Mhatre,  Mumbai
8th April 2015


Hi Sandeep,
The modification of Ulwe from a exhausted suburban area into a realty hotspot in only a period of 5 years is definitely excellent. Improved and maintained by the City and Industrial Development Corporation of Maharashtra Limited (CIDCO), Ulwe is a hub of the city of Navi Mumbai.CIDCO has started land acquisition for the Navi Mumbai International Airport and the development work will start soon.
Manisbapu,  Mumbai
8th April 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


Hi all,
Are you planning to invest in Ulwe, Navi Mumbai. Here are the list of available projects in the locality ;- Kailash Crystal, Delta Tower, Dev Krupa, Steel City City Elite, Yushan Maple IVY, Naivedya Stuthi in Ulwe, Shree Ganesh CHS, Sahil Siddhivinayak Splendour, Bhagwati Bay Bliss, Shagun White Woods etc.
Mansoor Bithal,  Mumbai
14th April 2015


The current residential property rate in the locality is Rs. 5350-5950/sq-ft. The values may vary depending on the location infrastructure, amenities, facilities and other related issues.

This locality is developed and maintained by CIDCO. is going to be a major successful planned place to live after Vashi. The metro project of Navi Mumbai connects Ulwe prominently. Ulwe has rising land rates based on the pretext of a proposed international airport.
Anirudh Patel,  Mumbai
14th April 2015


50
Guys,,,Avoid this project
ravi


Hi ravi I am Munira even I have invested in this property in November 2011 in Phase # 3 . They told us project will complete in 3 yrs. Since that they always said in this april registration will be done n all from last 3 years. No one is answering the call properly.

Could any one help me how i can get my money back with interest from there becoz last month we gone to check sight 1 phase is not yet completed.
munira,  
24th March 2015


Hi Mumnira,
I can see that this project is delayed by approximately one year. In such cases, the builder is legally responsible to refund the amount paid with interest (for the period of delay) as there has been a violation of contract.

Your first duty is to sit with the developer and find out the reason of the delay. Sometime a project delay due to legal approvals. If there is a genuine delay then wait for the possession.
Anirudh Patel,  Mumbai
31st March 2015


If you don't get any proper delay cause then send a Legal Notice through your lawyer to the builder. If still the possession is not granted, then file a case in the Consumer Forum for recovery of money and compensation for the delay.
Anuj Gupta,  Mumbai
31st March 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


51
Who knows when is the project going to complete. .......... 4 years have gone after payment advanced....
Anuj Gupta


withdraw the money
26th February 2015


they have just used our money for the projects without any intrest
26th February 2015


Hi all,
In case of delay in project, the builder is legally responsible to refund the amount paid with interest (for the period of delay) as there has been a violation of contract. A promoter, who constructs or intends to construct either commercial or residential building, shall define in writing, the date by which possession of the flat is to be handed over.
Arushisha,  Mumbai
12th March 2015


I appreciate what Arushisha mentioned above,
Send a Legal Notice through your lawyer to the builder. If still the possession is not granted, then file a case in the Consumer Forum for recovery of money and compensation for the ensuing delay.
pradyumanapte,  Mumbai
12th March 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


52
Hi,

From last three months work has been stooped for balaji Kalash (aadai) phase 2/3.
We are trying to contact the builder but every time he reply that work is getting start in next 10-12 days
Any body have an any idea about the same ?
please suggest me

Thanks
Arjun
Arjun Balip


Hi Arjun,
I called builder and ask about the current status of the project like price update, flat sizes, locality, connectivity and possession. Now, they are saying that they are giving possession in May'2015.
Arup rajan,  Mumbai
25th February 2015


for balaji kalash? impossible in May 2015
26th February 2015


its impossible for balaji kalash, last Sunday only I visited the site and work is not started yet
26th February 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


53
Yes Vineet,
Panvel is a very nice location. It is surrounded by some major MIDC managed regions like Patalganga, Taloja, Nagothane, Roha and Khopoli. It is considered as important junction point as many major highways like Mumbai-Pune Expressway, NH 4B, Sion-Panvel Expressway and NH-17 meet and pass through the city. It is proposed Navi Mumbai International Airport is the major ongoing project of Mumbai which is located adjacent to Panvel.
Praveen Modi


54
Hi all,
I am planning to book a flat of this project and i heard a lot of news regarding this project like Tirupati Balaji is one of the well known township, that is been projected in whole Navi Mumbai. The location provided is about 1.5 km from the Panvel railway station.This plan is being instructed by all the professional architect. Its infrastructure is projected in a pollution free area, with all necessary sanction approvals. It is strategically situated at the place of walking distance. If it is really true then i will surely go for this project. Can anybody give me some more feedback on this project. thanks...
Vineet Tendulkar


all projects are 3 km far from the station.
9th February 2015


Yesterday I visited to site & checked No construction has been started ,,agent Mr Anil is said bhumi poojan plan in next 2 to 3 days ...Also visited in office snehal said only 2 flat is vacant take it fast ,,,,since last day i got many called to submit cheque @ 20 % ....today I checked they in cidco site there is no information abt permission on NAINA area
ravi,  
9th March 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


55
I have also booked a flat in Balaji Arcade Phase I, paid 20% for booking amount. When I asked to copies of property documents for my pre-approval loan, they denied by saying all documents will provided to everyone after 6-8 months. Is that a sign of fraud?? Becoz builders suppose to present all documents to customers when any token paid to the builder? This should be right of buyer. Any Suggestion plz what should we do in such cases
Jitu


Yesterday I visited to site & checked No construction has been started ,,agent Mr Anil is said bhumi poojan plan in next 2 to 3 days ...Also visited in office snehal said only 2 flat is vacant take it fast ,,,,since last day i got many called to submit cheque @ 20 % ....today I checked they in cidco site there is no information abt permission on NAINA area
ravi,  
9th March 2015


hi jitu, ravi...do not invest in tbg. if already invested then go and withdraw. i also withdrawn
16th April 2015


hiii, do invest in tbg. if already invested flat in tirupati balaji group.Tirupati Balaji Group is Very Good Construction in Navi Mumbai, Thane & Pune.
2nd August 2015


56
Other Projects by Tirupati Balaji Builders & Developers in Navi Mumbai are Shree Vaman Residency, Krishna Valley, Royal Park, Lilavati, Balaji Kashish Park, Balaji Pushp Kalash in Bhiwandi, Balaji Kalash, etc.

The current residential property value in the locality is between Rs. 4800-5000/sq-ft. depend on the locality and the amenities in the projects.
Padma G


57
Tirupati Balaji Builders & Developers Pvt. Ltd. is a key player in Realty Development Industry. TBG is opening its branches into various sectors. The group has been in its core Business of Construction and Property Development since over last 6 years, and has been successfully ventured into different fileds like Realty & Housing, BPO, to name a few.
Ashish Sharma


naam bade aur darshan chote...i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


58
Hi,

Firts I have booked the @ BHK flat on Balaji Kalash, Adai , Phase 3, 1 year back.Then he change the floor map without informing us and when we inquired about the same builder has give me a new plan detail ,that time builder promise he will going to give an possession on December 2015 but from last one year there is no progress towards the project completion and today he told me that because of CIDCO cc is not cleared yet and he will get the same on next 2-3 days after that he will start work and try to give an possession til December 2016 or Jaunuary 2017.

Can any one suggest me that I invest my money with right builder ?
Can any one give me information about the Tirupati Balaji Biulder and there completed projects, for my reference.

please contact me on following details
mailID = arjunbalip@gmail.com

Arjun
Arjun Balip


Hi Arjun,
Tirupati Balaji Builders & Developers Pvt. Ltd. established in the year 2008, the company today is one of the fastest growing and a key player in real estate development industry. Griping on the latest technologies and intelligently planned work schedules, they have been able to create the finest structures known for being durable. As a builder and Real Estate Developer, their work specialty includes civil engineering, building models etc. They develop township projects and budget housing projects for every class in the area of Panvel and Navi Mumbai.
Abhijit Thanki,  Mumbai
25th November 2014


Some of their ongoing projects are Swarna Kalash, Balaji Kalash, Pushp Kalash and Balaji Residency in and around Mumbai. All the projects are completing in 2015 end or 2016 first quarter.
Abhijit Thanki,  Mumbai
25th November 2014


they have not yet completed the projrcts yet, whenever we ask they are saying due to NAINA project its all delayed from CIDCO.
9th February 2015


i withdrawn my booking amount from project of balaji kalash adai
9th April 2015


59
We have booked flat in Balaji Residency 1 year back. Still the work has not started. Builder saying cidco isn't giving NOC. any one please help who has booked in balaji groups.
Shiva


I also booked in phase 1 . please contact me on 9757139727 then we will get together all other persons.
10th November 2014


i ve booked a flat in balaji residency phase 2 ...but no progress yet..if you people get any information please contact me on 8286683365-Jayesh Khandagale
jayesh,  Mumbai
20th November 2014


I am also booked 1 & half year back but their is no progress I don't know when registration will start. I heard that builder have no mony for further work.Please all of you be careful.Can we make group & make complaint in consumer cort. My contact No. 9820488731
Patil, Apartment Resident 
21st November 2014


i have booked in phase 3. They saying work will start in nov. Not even sure if their papers are cleared
22nd November 2014


please let me know if u have any additional infomation. My number 9664287223
22nd November 2014


Hi ,

i ve booked a flat in balaji residency phase 3
Few days back, i hv visited the office to get the update on Balaji residency, they told me you will receive a call in the first week of dec 2014, they giving me a date of bhoomi pujan i.e. on 3rd dec 2014...lets seee
29th November 2014


if anybody get the update on balaji residency , plz circulate on this portal..
29th November 2014


I have booked flat in Balaji Residency phase 3, five months back. If any body get update on balaji Residency pl contact me on 7506337803. Vidyadhar Jagdale. Mumbai
30th November 2014


I hv read all the comments nobody mentioned that the anybody did bank loan for the same and done leagal check from reputed .bank ..!! please do comment if anybody done bank loan bcoz banks are doing legal check for NOC!!!
30th December 2014


Please make a group in whatsapp to share the informations for Balaji Residency ...
Anil,  
28th January 2015


Hi all Yesterday I visited to site & checked No construction has been started ,,agent Mr Anil is said bhumi poojan plan in next 2 to 3 days ...Also visited in office snehal said only 2 flat is vacant take it fast ,,,,since last day i got many called to submit cheque @ 20 % ....today I checked they in cidco site there is no information abt permission on NAINA area
ravi,  
9th March 2015


Any one has visited CIDCO office to check permission status of Balaji residency phase 1,2,3,,,Might be not given till Now by CIDCO ....This Land is under NAINA schem and builder has to take permission from CIDCO...without permission cant start work ,,,,
ravi,  
9th March 2015


Yesterday I visited to site & checked No construction has been started ,,agent Mr Anil is said bhumi poojan plan in next 2 to 3 days ...Also visited in office snehal said only 2 flat is vacant take it fast ,,,,since last day i got many called to submit cheque @ 20 % ....today I checked they in cidco site there is no information abt permission on NAINA area....Seems Fraud
ravi,  
9th March 2015


I also Recently booked a 1 BHK Flat in Balaji City. This Comapany is a very supportive.
Nupur Parab,  Mumbai
2nd August 2015


I had booked a flat in June 2014 Balaji Residency Phase 2. In Oct '14 the boomi poojan was carried out. I had visited there office on 17th Oct '15 and the site as well. There is still no work started. If we have a Whatsapp group, do include me. My Contact number 9821725211
Ashish J,  Mumbai
23rd October 2015


Hi all, I have done booking in Balaji Residency : Phase II, 2 years back by paying 20% amt. And now worried about my money. Will i get it back. If there is any whtsapp grp for balaji residency, pls add me to get proper updates. My no is 8655362098.
10th November 2016


60
But wrok completed 80 per
Kalpana Turukmane


Wrong Information.
Patil, Apartment Resident 
21st November 2014


61
I have booked in balaji araced phAse 4 how they are not started for wroked teeling procession on 2017 end whatto do plz reply
Kalpana Turukmane


Hi kalpana, Is there a delay in possession? Did you talk with the builder as and when they are going to start the construction work?
Bikram,  Mumbai
3rd November 2014


Even I have booked in phase 4 but not seen any signs of starting of construction from their side.
13th December 2014


totally fraud builder.plz withdraw yr money.i booked in balaji arcade but not received up to dated my money....
VIJAYKUMAR,  Mumbai
4th May 2016


62
I am also booking one flat in Balaji Residence. Please me give suggestion for same my mobile number is 9757139727. you can also chat with me on wats up. Reading above post I am also worried about my investment so please get back to me
Raj shetye


Hi Raj, If you are worried then why don't you invest your money into some other projects located or coming up in Panvel
Lalit Verma,  Mumbai
3rd November 2014


everyone is worried with every investment..............but if I withdraw then I loss.........
10th November 2014


Try to recover investment from Balaji or put police complaints againts Fraud
ravi,  
9th March 2015


63
Hi,
You can call on this toll free number (1800) (180) (180) (180) Or You Post your Requirements to get matching properties details on your Email and Mobile.
Ramesk Polekar


64
Hi,
My budget is Rs. 20 lacs. I am planning to buy flat for investment purpose. Please. give me advise which area is good in western express highway. Is it Palghar Naigav or Nalasapora. How much appreciation i can expect in next 3/4 years?
Shrikant Kejriwal


@Shrikant,
Within this budget, you can look for a 1BHK unit in Nallasopara. Nallasopara falls in the western suburban areas of Mumbai. There is a lot of development in the eastern and western parts of the locality. Developed by CIDCO, Nallasopara is directly connected to Mira Road and Mumbai through the Mumbai-Ahmedabad National Highway or Western Express Highway. As of now the returns are not very high but within 5 years you could expect 25% returns.
Ashish Bhoite,  Mumbai
10th September 2014


65
Hi,
Kashish Park situated at LBS Marg, Naupada, Thane West, is a ready to move project since January' 2002. Only few flats in resale option from 556-700 sq-ft are available.

To get more details about the project and its price click the link Properties for Sale in Kashish Park, Thane
Ashish Bhoite


66
i m planning for kashish park, pls advice me..
Madhav


Hiii, Madhav I am invested in Balaji Kashish Park Project. Very Nice Project in Tirupati Balaji Group.This is a Cidco Approved Project & work in Progress in TBG.
Smita Shinde,  Mumbai
2nd August 2015


67
Hello people,
Reading the comments here makes one feel scared like I am. I never would imagine this to be fake as a lot is on stake just like u all. I am curious n worried as well. People let's get united n share more n more information we have. I hv a booking in Kashish Park n I request all concerned future residents to come join me on facebook with this email balaji.kashish2705@gmail.com. Let's come together. Thanks.
Regards,
Aviator.
balaji Kashish


Hi All,
I and my friends have booked 7 flat in balaji sneha dham 9 month ago already 90% work has been completed,The builder has a good name in new panvel and has lot of project in new panvel.
31st August 2014


if reply coming from Balaji Arcade then mention proper name and contact number also
10th November 2014


68
Hi,

Has anyone booked booked flat with Tirupati Balaji Builders & Developers, New Panvel for their Balaji Residency project - phase 1/2/3 ?
Devesh


I am planning to book a flat in Balaji Residency project phase 2. Would like to know if I need to proceed? Let me know if anyone has any feedback about the project.
Ashish J,  Mumbai
19th August 2014


Ashish, are you sure that you are planning to book flat in phase 2, because builder told me that they are not taking any booking for phase 2, Balaji Residency, Panvel.
Devesh,  
20th August 2014


I have done booking for phase 3.
4th September 2014


I already booked in phase -1 , if you are planed to book I will advice u dont book. Because from last 7 month they shows trees on plot and taking booking 20% amount. That is not correct. we are created one wats up grp joint wiht us ........
my contact number is 9757139727
10th November 2014


Mine is in phase 3
30th November 2014


I m interested to book flat in Balaji kashish park, Please suggest is all property papers are clear?Please add me as well in whatsapp group.- 9820436618
Mahesh,  
9th April 2015


Hi all, i have done booking in Balaji Residency : Phase II, new panvel, two years back. Pls add me in the whtsapp grp. My no 8655362098.
Pooja Tandel, mumbai
10th November 2016


69
Lets get together here : https://www.facebook.com/pages/Balaji-Kalash-New-Panvel/616282068487123
Raj


70
Hi all,
Balaji kalash by Tirupati Balaji Builders and Developers located at Panvel, Navi Mumbai, Maharashtra offers 1/2 BHK residential apartments from 348-909 sq-ft and the current price quoted by the developer is Rs.4000-4050/sq-ft. It is expected that the date of possession will be near around May'2015.
Suraj Kalled


Hi Suraj,

What phase will be given posession by Mar2015 ? I guess there are Phase 1-5 planned.
Raj, Apartment Resident, Mumbai
11th August 2014


i withdrawn my booking amount from project of balaji kalash adai. fake commitments by builder
9th April 2015


71
Hi,
Tirupati Balaji Builders & Developers Pvt. Ltd. is the foremost Real Estate Builders and Land and Plot Developer in Navi Mumbai. They offer residential building construction services. The services offered are customized to meet the client`s needs and specifications. They have formed a strong team for the timely completion of all their projects. As a builder As a builder and Real Estate Developer, their work specialty includes civil engineering, building models. Some of their ongoing projects are Swarna Kalash, Balaji Kalash, Pushp Kalash and Balaji Residency in and around Mumbai.
Rakshit


Panvel Navi Mumbai project - builder no have his Own Land & not any Plan Passed for Uchchmba Panvel project as CIDCO not passing any Plan less then 25 Acre Land, how this builder can get Plan Passed from CIDCO , his showed land not even under his name nor showed land is 25 Acre ???
How he getting booking from Poor People - this is big scam going on .
6th August 2014


72
LETS GET IN TOUCH ALL OF US. LIKE THE PAGE ON FACEBOOK. BALAJI KASHISH PARK & DICUSS MORE THERE.
balaji Kashish


Hello everyone. I booked a 2-bhk flat in Balaji Kashish Park. Work have not yet started. Is there anyone who have booked in this project, so that we be in touch about the happenings....?

Pradeep
pradeep Kumar barla, Apartment Resident 
31st July 2014


As per stick law builder can't take booking without having own land & plan passed . How people booking flats without checking land papers & passed plan ??? Police already arrested one big builder in Delhi who sold flats without having land & passed plan. How people knows if this builder doing same in Panvel ??
5th August 2014


I have created a FB page here https://www.facebook.com/pages/Balaji-Kalash-New-Panvel/616282068487123
Raj, Apartment Resident, Mumbai
11th August 2014


Hey Pradeep ,
I too have a booking in Tirupati balaji Buildcon's Kashish Park, Vichumbe, New Panvel.
I have made a page on FB let's get in touch there or else search me with this email ID balaji.kashish2705@gmail.com
Let's share the information so that it is helpful for u , me n others.
23rd August 2014


Hello everyone. I Booked a 1 BHK Flat in Balaji Kashish Park. Work have statrted. I looking for the site work has started.
Priya Gujar,  Mumbai
3rd August 2015


73
Can we make a group in facebook/whatsapp to share the informations for Balaji Kalash Phase1?
Sri


74
Hi Friends, I have booked 1BHK flat in Balaji Kalash Phase 1 in Feb' 13 and paid 20% amount. But registration is pending till date from the builder. Even construction is going very slow.
Builder is telling the project is going to be affiliated by CIDCO and delay is because of the same.
Do anyone have any other/correct information for delaying registration as well as construction.
Sri


I went to book yday..n read ur post ...u mean to say ur flat is still nt registered ??
Wat is d builder sayin??
Sud I put my Investment on hold ?
natasha, Apartment Resident 
22nd July 2014


how he can sell without plan passed ?? i think should not buy any flat without check passed plan.
good luck to you!!!
Gopal Sharma
25th July 2014


how builder can sell without plan passed ?? people should not buy without plan passed . without plan passed can be cheated easily
25th July 2014


Builder always make fool to poor people, taking booking - collect money & runaway, these poor people can't do anything.
5th August 2014


i withdrawn my booking amount from project of balaji kalash adai. dont invest
9th April 2015


75
There is no transparency in their dealings. They take booking amount even when plan / approvals are not in place and once plan is ready then they sell good/prime flats to new customers and give non-premium flats to first customers. So be careful while dealing with them. I have faced this issue in Balaji Residency. More ever if final approved plan is not ready then do not book as they change plans drastically. When I visited their office for Balaji Archade project, people there were saying all phases till phase 3 are sold out and they were taking bookings for next planned phase for which even draft plan was not ready. Hence I booked flat in Balaji Residency Phase 2, but when I went to take flat number after a month new plan was completly different & I was not allotted assured view flat. When I argued with the one who had taken first booking, person told me that all other flats are blocked even when I was from very first few to visit their office since plan was declared ready by them.
Rasik


so many complained file against trupati balaji group, as they are selling without plan passed & even this group no have their own land in Panvel, how they are doing & how people trusting them ???? God Save them.
26th July 2014


Are you talking about Balaji Residency Phase 1/2/3 from Tirupati Balaji Builders & Developers in New Panvel ? I am also planning to go with them in phase 3.

Can you provide me your contact no or call me at 8097032750 for more details ?

Thanks in Advance !
Devesh,  
13th August 2014


76
I have booked in balaji kalash phase 4 in June 2013. Just they are starting the work of phase 2, 3 & i am waiting for registration. ..
Nilesh Mhatre


Hi Nilesh, what do they say about phase 4 & 5? When do they plan to start work for that?
Raj, Apartment Resident, Mumbai
8th April 2014


Fraind Builder still not start Registration of 1 st Face.& also work slow down due to builder have no mony to give Material Suppler & Labour.Be Careful.
Sachin Patil,  Mumbai
22nd June 2014


i withdrawn my booking amount from project of balaji kalash adai. dont invest
9th April 2015


77
I have booked in balaji kalash phase 4 in april 2013. Just they are starting the work of phase 2, 3 & waiting for registration. Phase 1 is under 50-50 scheme.
Sandeep Golatkar


i withdrawn my booking amount from project of balaji kalash adai. dont invest
9th April 2015


i visited yesterday soon they will start thier work... will get possession as soon as completed
Surekha Satpute,  Mumbai
1st August 2015


Tirupati Balaji Group has many good projects in New Panvel . so if anyone is interested to INVEST in property then go with TBG only, because they are giving best facilities and features .
Ajit Wagh,  Mumbai
3rd August 2015


TBG is making fool to people, they dont have money so using poor people money. Since last 4 years they are still there, no progress........
10th October 2015


78
I have booked flat in Balaji Arcade Phase 4 in vichumbe usarli,Panvel. As per my understanding they do quality work...Is there any one who has booked in to the same.
Hitesh Niranjan


Hi.. Hitesh. I m planning to book a 1bhk flat in Balaji arcade phase 2. Please tell me whether all the legal documents of this project are clear such as IOD, CC,etc. And how is the quality of construction and your proposed possession date. Thanks in advance.
23rd April 2014


i have also booked 2BHK in balaji arcade , but steel a am waiting for resistration
29th April 2014


Can anyone my friend please tell me to how much amount you have given and what is the plan for the payment up to registration in percentage.
29th April 2014


Hitesh and other can we make one whats up group for discussion,my m.n. 9930126707 can other friend share
29th April 2014


Hi, I have booked a 1RK Flat at Balaji Arcade Phase 1. They have been telling me regarding the registration for the last 7 months. I have paid 20% as the down payment, more than a year back. I am not sure about their intentions. Should I ask for a refund of the down payment amount and cancel the booking?
Dr. Rajesh Roy
6th August 2014


Yes Mr.Hitesh, I like to book 2bhk in their Arcade Phase 4 plan, they told it will take 2&half year to complete it, 20%payment on booking then they will give allotment letter. How we can trust them for their timely construction & process? They They are waiting for CIDCO approval. They have a land in hand or not how we know. Simply collecting 20% for booking. Please if you know them about them pl.advice before investing. Have they finished any house project before? Thanks in advance.
Anant G.P,  Mumbai
18th September 2014


yes i have booked flat in balaji kashish park.. i have verified all the projects.. They are supporting me for the booking amount..
Reshma More,  Mumbai
1st August 2015


Ms.Reshma More, please give me your mobile no. I want to know how you verified all balaji projects. Thanks
Anant G.P,  Mumbai
9th August 2015


Reshma/Anant,

They will support you while you investing in there project but once you try to withdraw from the TBG project they will show you thier actul role. I have good experiance while withdrawing the money.
10th October 2015


hello hitesh,
are you cancel flat in arcade
VIJAYKUMAR,  Mumbai
4th May 2016


hello hitesh are yu cancelled booking
VIJAYKUMAR,  Mumbai
4th May 2016


79
Anyone has booked flat in this? Will be good to connect?
Raj


Hi raj this is bhumi i recently booked in balaji kashish park it was a very nice project & i verify in CIDCO office all peppars are cleared. i suggest to u also booked that project
bhumi vas,  Mumbai
3rd August 2015


Raj,

You may waste your money in the TBG project, there will be no devlopment till more 5-6 years. Search CIDCO area & buy good home.
10th October 2015


80
Have you ever been to any of their project? How is the construction quality
Anuj Gupta


81
Tirupati Balaji Pvt. Ltd are active in developing budget housing in the areas like navi Mumbai and Panvel. They do good quality construction.
Sanjana Jain


Yes, I have already booked Flat in Balaji Moderncity Project. This is Supportive Company and Good Construction Quality in Tirupati Balaji Group.
Shrikant Dalvi,  Mumbai
3rd August 2015


82

Ask a Question