Vallarpadam ROB and flyover work started

Replies (9)
1
An official involved in this has also said that Traffic diversions have been proposed to ensure the smooth movement of vehicles till the completion of the bridge and the contractors have been asked to appoint traffic wardens for controlling traffic to keep it safe.
Ashwini Eradi


2
You know the Kolkatan company has grabbed the contract a lengthy competitive bidding on their part. Even the company has suggested that they will carry on with the work without disturbing the existing traffic situation. along the Go shree bridge area and the flyver area.
Maria Nair


3
The flyover and the rail over bridge projct has been approved by the Union govenrment under plan works. The CPT too have found a company that will work on the project. They are a company called M/s GPT-GEO JV from Kolkata.
Krishna gowda


4
I heard from a close friend of mine that some mo,re land on the Vallarpadam side will also be used for the same purposes. The Port Trust are very hopeful that they will be able to finisht the work by deadline. But knowwing that our bureaucracy gets ahead of itself, I think this will take longer than expected.
Rajagopal Menon


5
So to put a stop to this traffic situation and to find a better solution to halt. Th trust has come up with plans to build the flyover in front of the Exit Gate No. 1 of the ICTT and the rail over bridge that could continue on the already existing Go Shree Bridge no.2 which leads Mulavukad and Vallarpadam Islands.
Deepak Shetty


6
You know there's also problems for the public as they try to cross the level crossing at the Goshree Islands Development Authority (GIDA) Bridge (No 2) which is right around the corner here and gives hell to all pass by here.
Ramya Janagam


7
Some officials have said that, the movement of local traffic to and from the Puthuvypeen area along with the multi-axle container movement from Vallarpadam terminal and Container Freight Stations (CFS) always results in severe traffic jam which makes t
Amal Anthony


8
Yes. I read about it too. This project is expected to cost over Rs. 60 crores from inception to its end. The Port trust have also been optiisteic that this project will be completed by the May of 2016 which could immensely bring down the traffic.
Shiva Kuchibhottlla


9
You know the traffic near the Vallarpadam International Container Transshipment Terminal and the roads that lead to this place has been filled with a lot of traffic. So the Cochin Port Trust is expected to construct a flyover and a rail over bridge.
Ayesha Bibi


Hello, What do you think the cost of the project will be?
Sreekutty Nair,  Kochi
26th February 2015