By: Mani Group in Gobra
Change your area measurement
MASTER PLAN
FOUNDATION
R.C. Foundation resting on cast-in-situ Reinforced Concrete Bored Piles (complying
with IS-2911) and Pile Raft.
2
SUPERSTRUCTURE
Reinforced Concrete Framed Structure using minimum M30 grade and maximum
M60 concrete complying with IS-456 and Fe 500 / Fe 600 Steel Reinforcement
complying with IS-1786.
3
WALLS
a) External Walls
Reinforced Concrete with filler of 250 mm thick Autoclave Aerated Concrete (AAC) Block in
places.
b) Common Area, Internal Walls of Apartments
125 mm thick AAC Block.
4
ULTIMATE ROOF
Reinforced Concrete Roof with appropriate waterproofing and engineered
insulation system.
5
CEILING
a) Apartment
i) Living, Dining, Entrance, Foyer, Bedrooms, Study
Gypsum / POP False Ceiling duly finished with Plastic Emulsion Paint.
ii) Kitchens, Bathrooms, WC
Calcium Silicate / Cement Fibre False Ceiling duly finished with Plastic Emulsion Paint.
iii) Servants’ Quarters, Store, Other Areas
Paint Finish.
b) Common Areas
i) Lift Lobby
Gypsum Board False Ceiling with or without drops finished with Plastic Emulsion Paint.
ii) Car Park Areas
Cement & Sand Plaster finished in Cement Paint.
iii) Staircases, M & E Service Rooms, Shaft, Utilities
Cement & Sand Plaster with neat White Cement / POP Punning.
Staircases
– additionally finished with two coats of Plastic Emulsion Paint
FINISHES
a) 1) Wall - Apartment Units
i) Living, Dining, Entrance, Foyer, Bedrooms, Study,
Paint Finish.
Store, Other Areas
ii) Wet Kitchen, Bathrooms, WC
Wet Kitchen – Combination of high quality Imported Marble / Vitrified Tiles.
Bathrooms – Blend of Imported Marble / Vitrified Designer Tiles.
iii) Show Kitchen
Paint Finish.
iv) Servants’ Quarters
Paint Finish.
2) Wall - External Common Areas
Textured Paint and / or Weather-shield Paint Finish, with Double Glazed Façade System
at designated areas as per design.
3) Wall - Internal Common Areas
i) Corridors, Staircases, Landing, Other
Paint Finish.
Common Areas
ii) Car Park Areas
Cement & Sand Plaster finished in Cement Paint.
iii) Typical Lift Lobbies
Paint Finish in combination with Imported Marble or Granite Cladding / Timber Paneling /
Wallpaper as per interior designer.
iv) Ground Floor Entrance Lobby
Paint Finish in combination with Imported Marble or Granite Cladding / Timber Paneling /
Wallpaper as per interior designer.
b) 1) Floor - Apartment Units
i) Entrance Foyer, Living, Dining
Imported Marble.
ii) Bedrooms, Study, Internal Staircase (for Duplex)
Imported Marble or Engineered Wooden Flooring.
iii) Master Bedroom
Engineered Wooden Flooring.
iv) Bathrooms, WC
High quality Granite / Imported Marble / Vitrified Tiles.
v) Show Kitchen
Imported Marble / Engineered Wooden Flooring.
vi) Wet Kitchen
Imported Marble / Vitrified Tiles.
vii) External Terrace / Balconies
Granite / Vitrified Tiles.
viii) Store, Servants’ Quarters
Quality Vitrified Tiles / Indian Stone Flooring.
2) Floor - Common Areas
i) Staircases (including landings, corridors at car
Finished in Polished Kota Stone.
park level and typical floors)
ii) Lift Lobby / Vestibule
Imported Marble with Matching Skirting with or without inlay works at designated areas.
iii) Other Common Areas
Polished Kota Stone Flooring.
7
WINDOWS / FAÇADE
Low E, Double Glazed High Precision / High Performance Aluminium Windows /
Glazing / Sliding Door System (Powder coated / PVDF coated) with partially fixed
and partially openable shutters as per design.
8
FITTED DOORS
i) Living, Dining, Entrance, Foyer, Bedroom, Toilets, Study Hard Wood Timber Doors of 2.4 m height duly finished with lacquer and fitted
with quality hardware.
ii) Servants’ Quarters, Servants’ Toilets, Wet Kitchens, Phenol Bonded Hot Pressed Flush Door Shutters of 2.1 m height with Seasoned Hard
Other Services Areas
Wood Frames duly finished in high quality Spray Paint and fitted with quality hardware.
iii Staircases, Service Areas
Provided with Fire Resistant Doors.
9
SANITARYWARE, CP FITTINGS, SHOWER CUBICLES
i) Sanitaryware
Imported Sanitaryware
ii) CP Fittings
Imported CP Fittings
iii) Shower Cubicle Fittings
Imported Fittings
10
PLUMBING AND WATER MANAGEMENT
Efficient water distribution with Geysers in all bathrooms and kitchens.
Rainwater Harvesting System.
Sewage Treatment Plant with the latest technology for efficient handling of sewage /
waste water.
11 ELECTRICAL INSTALLATION
FRLS Cables and Wires with quality switches / sockets.
Fully-automated Lighting Controls in the apartment.
Air Conditioning Control with Temperature Set.
Cabling Provision for Motorised Curtain Controls in each room
TV / TELEPHONE POINTS
Compatible wiring which can be hooked up to a cable television network with connection
thereof in living room and all bedrooms. Telephone Points in living room and all bedrooms,
Centralized Satellite Dish provision to cater to television network.
13 LIGHTNING PROTECTION AND EARTHING
Lightning Protection – In compliance with IS 2309.
14 WATERPROOFING
Waterproofing floors of Toilets, Planter Boxes, Terraces, and Ultimate Roof using
advanced engineering technology.
15 AIR CONDITIONING
Fully air-conditioned apartments using Imported VRV / VRF System with temperature
control arrangement in each room adopting state-of-the-art technology.
16 FIRE DETECTION, ALARM AND SUPPRESSION
a) Fire Protection Strategy
Fire Protection system as per NBC / Fire Authority Norms with Hydrant and Sprinkler System.
b) External Fire Hydrant
External Yard Hydrant with hose cabinet located at strategic locations.
c) Addressable Fire Detection, Alarm System
Addressable Fire Detection and Alarm System with Fire Detection and Control Panel and
Multi-sensor Smoke Detectors in all rooms and Heat Detectors in the kitchens.
d) Manual Call Points, Hooters
Manual Call Points and Hooters with Strobe at strategic locations and integrated
with the control panel centrally located and monitored round the clock.
e) Public Address System
2-way Talk Back Public Address System located on different floors connected to the fire
alarm control panel.
f) Emergency Evacuation
Emergency Evacuation Maps in common areas
POWER AND BACKUP
24x7 Power.
100% Power Backup.
Instant change over between mains and Auto Synchronised DG Set using PLC System.
Solar Panels to cater to the Power Backup System.
18 SAFETY, SECURITY AND ACCESS CONTROL
24x7 vigilance facility with CCTV cameras and Boom Barrier Control.
Swipe Card access to entrance lobbies and lifts.
Video Door Phone monitoring for front door / entrance lobby to monitor visitors.
19 VERTICAL TRANSPORTATION
THYSSENKRUPP MAKE- 4 Nos. 3.5 mps Passenger Lifts and 1 No. 2.5 mps Service Lift for
the apartments; Passenger Lifts to have Tall Door And Tall Car with Customised Interior
Finish; LCD Displays in operating panels and LCD Hall Position Indicators at each landing.
Service Lift with the capacity of 1275 kg. with tall car and tall door.
20 DRIVEWAY
Reinforced Concrete Slab to Fire Tender Access / for Car Park / Car Park Ramp and
Driveway. Stone and / or Paver Block finish for external driveways.
Elegantly finished greens at designated places around driveway.
21 DATA NETWORKING
Entire premises will be Wi-Fi enabled along with the Signal Booster.
22 SALIENT FEATURES
i) Façade Glazing
High performance External Glazing / Window / Door system with Doubly Glazed Glass
with low U-Factor, optimum VLT and Shading Coefficient ensuring maximum light and
minimum heat radiation.
ii) Lobby
Exquisite fully air-conditioned Triple Height Entrance Lobby on the ground floor.
iii) Green Building Certification
LEED Gold Rating, as per IGBC Standards – Sustainable Green Building Measures adopted,
use of Materials with Recyclable Content, Certified Wood, Low VOC and low Emitting
Materials, Energy Efficiency Measures – Thermal and Day Lighting Control by using efficient
electrical fittings, high performance low E and U Value Glass; Low Flush Water Fixtures;
Water Recycling from STP – for landscape and toilet flushing.
iv) Club
Separate Club Floor on the 2nd floor with all amenities.
v) Car Parking
Separate Car Parking Facility at lower ground floor (Basement 1).
vi) Landscape, Waterscape
Exquisite Water Feature and Landscape at the ground floor entrance level
Introduction: Mani Vivara, is a sprawling luxury enclave of magnificent Apartments in Kolkata, elevating the contemporary lifestyle. These Residential Apartments in Kolkata offers you the kind of life that rejuvenates you, the one that inspires you to live life to the fullest. Mani Vivara by Mani Group in Gobra is meticulously designed with unbound convenience & the best of amenities and are an effortless blend of modernity and elegance. The builders of Mani Vivara understands the aesthetics of a perfectly harmonious space called ‘Home’, that is why the floor plan of Mani Vivara offers unique blend of spacious as well as well-ventilated rooms. Mani Vivara offers 4 BHK luxurious Apartments in Kolkata. The master plan of Mani Vivara comprises of unique design that affirms a world-class lifestyle and a prestigious accommodation in Apartments in Kolkata.
Amenities: The amenities in Mani Vivara comprises of 24Hrs Backup Electricity, Bank/ATM, Club House, Community Hall, Covered Car Parking, Gym, Health Facilities, Indoor Games, Intercom, Landscaped Garden, Lift, Play Area, Rain Water Harvesting, Security Personnel, Swimming Pool and Tennis Court.
Location Advantage: Location of Mani Vivara is a major plus for buyers looking to invest in property in Kolkata. It is one of the most prestigious address of Kolkata with many facilities and utilities nearby Gobra .
Address: The address of Mani Vivara is JBS Halden Avenue, Gobra, Kolkata, West Bengal, INDIA..
Bank and Legal Approvals: Bank and legal approvals of Mani Vivara comprises of All Leading Banks, KMDA.
9-IT Chambers Mani Square, 164/1, Maniktala Main Road, Kolkata, West Bengal, INDIA.
The project is located in JBS Halden Avenue, Gobra, Kolkata, West Bengal, INDIA.
Flat Size in the project is 8000
The area of 4 BHK units in the project is 8000 sqft
The project is spread over an area of 5.60 Acres.
3 BHK is not available is this project