Latest Answer: Also during the trials, train will be tested at different speeds to measure the lateral and vertical acceleration (wobbling of coaches) at different locations. Heard that since both the curves are near the metro stations, it will not be a major problem in clearing the speed test.
Latest Answer: Hi all..i hope you all know that...the Jaipur metro will soon have the trail runs by April or May 2013. This inspection will be carried out by a research body of the ministry of railways named as Research Designs and Standards Organisation (RDSO).