Latest Answer: Actually, there are a lot of things that have to be done before the piling works for the flyover will begin. I think that a good share of land for the flyovers has been handed over to DMRC, except for two plots. Timely handling over of full extent of land is crucial for relocating pipelines and cables before piling.