Latest Answer: I got to look at the details of the project as to what was supposed to be built in here. Basically, the project was conceived in 2006 and a tender was called in 2007. The requirement was a 3o metre wide and 800 metre long rail over bridge to ease the traffic in the Keshar Bagh area rail crossing.