Q: Mumbai Railway Vikas Corporation (MRVC) will reassess its detail project report for the CST-Panvel high-speed rail corridor, planning the route along Palm Beach Road in Navi Mumbai, right up to the proposed airport.
Latest Answer: Actually, this project is easier to execute because private land does not have to be acquired at all on the entire 49km long stretch. The corridor will be elevated up to Kurla and will run at ground level from Mankhurd onwards.