Latest Answer: Hi all,
Yes, and pre-development work on the Navi Mumbai international airport will start in February with the diversion of the Ulwe river, clearing, levelling and reclamation of muddy land, raising the level of land to 5.5 metre above sea level and relocation of power lines.
Latest Answer: Good afternoon friends,
Seawood - Uran commuter rail link which is under construction is one such corridor which connects the hub of Navi Mumbai with Ulwe, Dronagiri and Uran. It is 22.50 Km long and serve to the daily commuting needs of Navi Mumbai SEZ, proposed Navi Mumbai Airport, JNPT etc. CIDCO has planned several stations along the route and as such Dronagiri node will be served by 4-railway stations and Ulwe node by 1-station. This project is a joint venture between Central Railway and CIDCO. It is an approved project and presently construction is in progress and is expected to be completed by 2015.