Latest Answer: oh..one parallel bridge is very important for the Goshree bridge..especially in the second bridge. This is because of the problem of acute traffic snarls in this area. The delay in the opening of the bridge is causing great inconvenience to the people travelling from Vypeen. The students and others are often got stuck in the traffic block at the first goshree bridge during the peak hours.
Latest Answer: what the repair works are doing is that the concrete wearing course will be broken and re-laid with the proper gradient and drains so that water can seep away. I think there will also be a 25 mm layer of mastic asphalt that will be laid manually..and the rest of the work then..
Q:Hi, I heard that the Thammanam - Pullepady Rd is being extended? Is it true? I'm moving here soon and would like to know more about this road link project.
Latest Answer: They make such a fuss about everything saying that the government does not have enough funds for developing land. Even the work for flyovers at Vytilla and Kundanoor were scheduled to begin in September, 2014, but is yet to commence.