Q:hello, I am aware of the water woes faced by the residents of Ganapathy and neighboring localities. What are the steps being taken by the corporation to solve this?
Latest Answer: While it is quite surprising that the project is actually nearing completion, it is important to know that this was possible for the civic body because of the new main storage reservoir that was being supplied to Pilloor 11, giving it about 65 million litres everyday. The point of the Pilloor 11 water tank is that it can now supply water to the areas that were previously being supplied by Pilloor 1 that was backed by the Tamil Nadu Water Supply and Drainage board. The Pilloor 11 project will supply about 125 million litres per day, which should be enough for Ganapathy and areas surrounding it.