Latest Answer: The BMRCL is now busy to launch Reach 2 from Mysore Road to Magadi Road and Reach 4 from National College to Puttenahalli. All construction works have been completed on these two stretches.
Latest Answer: The BMRCL has called for the tender and once the tender is allotted it will take three months to complete the internal trails. The trail run will begin in September-October
Latest Answer: Indiranagar, located on the east of Bangalore, has witnessed an array of residential units being crumpled down and reconstructed into commercial complexes, turning the residential hubs into a commercial district. With the CMH road offering access to commercial activity, the rentals are bound to hit the roof for both commercial and residential spaces.
Latest Answer: The metro rail projects would not be covered by this rating philosophy which are built and financed by private companies through the public-private-partnership route under concessions granted by the government.
Latest Answer: Namma Metro Green Line is witnessing increase in the number of commuters ever since the operation was extended from Peenya Industrial area to Nagasandra. The extended line has also increased the revenue for the Bangalore Metro Rail Corporation Limited
Latest Answer: The new phase has a total length of 72 km and will have four extensions of existing project — Mysore Road Terminal to Kengeri (6.46 km), Byappanahalli to Whitefield (15 km), Hesaraghatta cross to BIEC (3.77km), Puttenahalli Cross to Anjanapura Township (up to NICE road) and two new lines IIMB to Nagawara (21 km including 13.79 km underground stretch) and RV Road to Bommasandra (18.82 km).
Latest Answer: Even the Bangalore Water Supply and Sewerage Board too is planning to increase water tariff because of the higher cost of power after the new Cauvery project was commissioned.