Latest Answer: I agree with Yogendra and Mritunjoy because of the incomplete work residents are facing problems like the pipes have been left open, drain water has entered several houses, mixing with drinking water and the residents have got their sumps cleaned several times.Commuters are helpless as they have no other choice as it is the only road that connects Shantinagar with the main road. The students have to make the risky journey every day, as a primary school is situated on the road.
Latest Answer: All the 14 joints will be replaced at a cost of Rs. 2.65 crore. Replacement of each joint will require at least five days. The work of replacement is being taken up in phases to ensure that commuters are not inconvenienced
Latest Answer: The cost of sand was between Rs.3,000 and Rs.3,200. But soon after the ban was implemented the cost have been increased in a range between Rs.18,000 to Rs.30,000.