Rs , sq ft

Removed from Shortlist

My Shortlist ()
Keep track of your shortlisted properties here. Shortlist a property to get started.

Real Estate Forum on Buying Advice

Real Estate Property Discussion Forum and Guide to Real Estate Queries

Filter On:


View Discussion from the month of
Q: What areas is the monorail supposed to cover in Coimbatore?
Latest Answer: Hey, few of the power plants set up in and around Coimbatore have started working. The first solar plant in this area, at Kuppepalayam is a 1 MW power plant that was set up by Swelect Energy Systems in October of 2012. It has been operational since then and supplies about 4000 units of energy on a daily basis. Coimbatore has been facing serious power shortage from 2010 due to an increase in population. To combat this problem several new solar power plants have been set up in and around the city. These solar plants provide over 1000 units of electricity on a daily basis. The frequency and duration of power cuts in your locality as well as in other parts of Coimbatore will definitely go down.
Reply


Q: What is the condition of roads on the Nanjundapuram Road near Ramanathapuram Junction?
Latest Answer: Hey are you planning to shift somewhere in the area near the Nanjundapuram road? If so then I should warn you that the condition of the road is very bad. Construction work that had been going on for setting up an underground sewage system. One side of the road is basically a long trench where the drainage pipe is being set up. Also, manholes are being placed every 30mts or so on the road. The onflowing traffic coming in both directions have to manage within the remaining half of the road, which is not enough. Even though the corporation has tried to cover up some parts of the trench using gravel, it has not helped the situation. The road is now extremely uneven and poses a threat to first time travellers. in the night.
Reply


Q: How is the power situation in Peelamedu in Coimbatore?
Latest Answer: The Peelamedu district in Coimbatore had been hit hard during the power crisis during 2010 – 2012. There were daily power cuts lasting several hours. Domestic life was badly hampered. Schools and colleges were out of power during class hours, which proved to be a big challenge for the students. But towards the end of last year, things have started looking up for Peelamedu. Coimbatore which used to rely mainly on wind power and hydroelectric power has now started looking into other energy options like solar power. For example, a 1 MW solar plant commissioned by Swelect Energy Systems has been set up under REC Scheme near Coimbatore in October 2012 to help with the power situation in the city.
Reply


Show More
Ask a Question
120 Characters Left

    Ask a Question
    120 Characters Left





      Trending Categories








      CommonFloor Property Search Mobile App now available on Android, iOS and Windows!