anupam mann, Apartment Resident
Q: When the project will complete? Has builder got all the permissions? Do you have any idea? -Sasmira

My replies to this discussion
I had visited site yesterday(11/04/2013). The work going on in full swing at premier exotica building no 3 .The work of The Plinth is completed for AB wing & The basement work ( 4 Parking Floors) of C D E wing is presently under construction. The need to complete major work before mansoon otherwise it will not be possible to continue work during mansoon. All nearby SRA work is going in speed . The work of Building no 4 ( All 2-3 BHK flat) is started from 15 days ago. The basement work is underway at building no 4. I had visited site yesterday(11/04/2013). The work going on in full swing at premier exotica building no 3 .The work of The Plinth is completed for AB wing & The basement work ( 4 Parking Floors) of C D E wing is presently under construction. The need to complete major work before mansoon otherwise it will not be possible to continue work during mansoon. All nearby SRA work is going in speed . The work of Building no 4 ( All 2-3 BHK flat) is started from 15 days ago. The basement work is underway at building no 4.
work going on in full swing at premier exotica. The Plinth is completed for AB wing & presently they are constructing column for first Floor. The basement work of CDE wing is presently under construction. Very soon the Plinth and First floor payments are due for A B wing buyers.work going on in full swing at premier exotica. The Plinth is completed for AB wing & presently they are constructing column for first Floor. The basement work of CDE wing is presently under construction. Very soon the Plinth and First floor payments are due for A B wing buyers.
I too recieve demand notice for plinth work yesterday. The language is dirty and autocratic. Asked to pay in 3 days. But since the work is going on smothly and builder too need money to continue work in speed. If we want project completion in time then we need to pay amount in time other wise more delay will happen. I will be contacting builder in few days time. anyway work will slow or halt during mansoon(3-4 Month) I too recieve demand notice for plinth work yesterday. The language is dirty and autocratic. Asked to pay in 3 days. But since the work is going on smothly and builder too need money to continue work in speed. If we want project completion in time then we need to pay amount in time other wise more delay will happen. I will be contacting builder in few days time. anyway work will slow or halt during mansoon(3-4 Month)
Generally Builder charges transfer fee in both the cases whether agreement is done or not till society is formed. After that the transfer is done by society and transfer charges need to be paid to society.Generally Builder charges transfer fee in both the cases whether agreement is done or not till society is formed. After that the transfer is done by society and transfer charges need to be paid to society.
As on date 27/07/2013 Work is going on in full swing in both Phase I And II. For Exotica A/B Wing First Floor is almost ready. C/D/E basement Third floor work is going on. For Building 4 Work is almost reach to Plinth level. SRA work is fully stopped. Internal road work ( Conctrate ) is going on in Phase I.As on date 27/07/2013 Work is going on in full swing in both Phase I And II. For Exotica A/B Wing First Floor is almost ready. C/D/E basement Third floor work is going on. For Building 4 Work is almost reach to Plinth level. SRA work is fully stopped. Internal road work ( Conctrate ) is going on in Phase I.
I had visited site on Sat 02-Fab 13. Work is smothly going on on Exotica site Around 20-25 persons are at work. AB Plinth work and digging work of CD wing is under going.I also had few photo which i will upload soon. All the work at (SRA, Phase I )Kurla are going on smothly. If this rate of construction continue than you may expect complete building in 2-2.5 yr time. You need not worry Such delay is very much a part of real estate work in mumbai.I had visited site on Sat 02-Fab 13. Work is smothly going on on Exotica site Around 20-25 persons are at work. AB Plinth work and digging work of CD wing is under going.I also had few photo which i will upload soon. All the work at (SRA, Phase I )Kurla are going on smothly. If this rate of construction continue than you may expect complete building in 2-2.5 yr time. You need not worry Such delay is very much a part of real estate work in mumbai.
Builder only give wage reply. They said to me that the work is going on in exotica. When i said their is no worker at site. that they said today worker might not come. This was some 1 month back. Work is completely stopped at exotica.Builder only give wage reply. They said to me that the work is going on in exotica. When i said their is no worker at site. that they said today worker might not come. This was some 1 month back. Work is completely stopped at exotica.
The recent Photo are here at Link http://www.sendspace.com/file/efxltv You can download to view status at siteThe recent Photo are here at Link http://www.sendspace.com/file/efxltv You can download to view status at site
At present the SRA building work is going on. Phase is getting ready i thank it need another 4-5 month to complete it fully. Exotica work is fully stopped. The contractor is not paid so he had left the work. good news is that a new road is coming between complex and Railway line connecting vidyavihar station and santacruz chenbur link road ( Close to Lokmanya tilak terminus.)At present the SRA building work is going on. Phase is getting ready i thank it need another 4-5 month to complete it fully. Exotica work is fully stopped. The contractor is not paid so he had left the work. good news is that a new road is coming between complex and Railway line connecting vidyavihar station and santacruz chenbur link road ( Close to Lokmanya tilak terminus.)
My comments to replies
hi friends..i visited the site office today.the work is going on properly.the good news is that they have increased the booking rates and are quoting Rs 11551 per sq,ft plus floor rise.expected date of possession is dec 2014.
Thanks for update.That is a good news. They took 5 Year to complete Phase - I . Completing Phase II in less than 2 year is far fetch. Anyway hope for best.
25th April 2013

I had visited site yesterday(11/04/2013). The work going on in full swing at premier exotica building no 3 .The work of The Plinth is completed for AB wing & The basement work ( 4 Parking Floors) of C D E wing is presently under construction. The need to complete major work before mansoon otherwise it will not be possible to continue work during mansoon. All nearby SRA work is going in speed . The work of Building no 4 ( All 2-3 BHK flat) is started from 15 days ago. The basement work is underway at building no 4.
I never said that poccession by Diwali. I only say that underground work is not possible during mansson so they are sppeding it. Looking at speed of work it will take atleast 2 more year before flat are ready for pocession. soory to disapoint you.
15th April 2013

Dear Friends, I have also invested in Exotica. This week i have received a demand for payment of the installment for completion of the plinth work. They have asked to make the payment within 3 days which is ridiculous after having to wait for 2 years to reach this stage. I am quite concerned though to make any further payment since I hear that they are almost on the verge of bankruptcy. I do not know whether I will risk my investment further by paying an additional amount. Have any of you received such a demand. Have you made the payment? What do you feel about the risk? Thank u in advance for your feedback
Which is your wing no? Plinth of only A B wing is ready. CDE is not yet ready.
9th May 2013

dear friends, i sold off my flat in exotica recently.got good returns on my investment.the wait had become too long for me.
What was the rate going on for resale?
31st July 2013

I too recieve demand notice for plinth work yesterday. The language is dirty and autocratic. Asked to pay in 3 days. But since the work is going on smothly and builder too need money to continue work in speed. If we want project completion in time then we need to pay amount in time other wise more delay will happen. I will be contacting builder in few days time. anyway work will slow or halt during mansoon(3-4 Month)
builder on Delay payment may put in interest so better confirm it than take decision.
13th May 2013

even Phase II we have booked in sep,oct 2009, and pocession suppose to be Dec 2012,it's already more than 3 years,still we don't know how many year it's going to take.Another 2 year means even Phase II also 5 Years or more.
5 Year is a avg pocession period in mumbai at present. All the major projects are delayed. So HDIL is no exception. But once they start in full swing then they can complete work in 2 - 2.5 year , if work without intermediate stoppages.
26th April 2013

guys any latest update,Constrction is still on?
The SRA contract is terminated by MIAL. The SRA work is stopped fully. but Free sale compnent work ( Phase I & II is going on smothly. The SRA town will be a ghost town till some outcome came. HDIL is expected to approach legal court asking for compensation.
3rd June 2013
SRA project is un-certain but too close to Free sale FSI project. The incomplete building will not only look ugly and not maintain than create a problem if used for illegal activity (which is known in kurla ). But i think HDIL is clever enouph to sort out the mess. They will get a jackpot if allowed to sell SRA in open market.
3rd June 2013
Today the maharastra Govt clear the MIAL airport devlopment project. The slum on eastern side of airport ( Kurla, Kural Side) SRA plan is cleared by govt. they definatly need HDIL to shift peaple to its SRA project. They will re-negociate the plan in this devlopement.
4th June 2013
Free sale FSI project are independent of SRA project. But devloper need to give pocession of SRA project first than free sale project. They will find it difficult to get OC from BMC without fufilling this condition.
4th June 2013

As on date 27/07/2013 Work is going on in full swing in both Phase I And II. For Exotica A/B Wing First Floor is almost ready. C/D/E basement Third floor work is going on. For Building 4 Work is almost reach to Plinth level. SRA work is fully stopped. Internal road work ( Conctrate ) is going on in Phase I.
The possession of Premier Residence is going on but at the same time the leftover work is also going on. They are constructing a concrete road for residence. Last wing of residence is yet to complete.
30th July 2013

Hi, Anupam thanks for update,Please let us know when Payments is due for A & B Wing.
The demand note for Plinth is dispatched long back ( Around Sep-Oct 2012), They are not doing any followup but at that time the plinth was not ready I had pointed out this fact to them which they agree and said to pay at later date.
15th April 2013

Hello everyone.. Is there anyone who have a booking in Bldg. No. 4 in Premier Exotica? Have they started with the basement work for Bldg.No.4?
Basement work of Building No 4 is started some 20 25 days ago at present they are digging for basement.
6th May 2013
At present the basement work of Building 4 is going on. Looks like 4 basement parking plan.
13th May 2013

Thanks Anupam for update.. I have a flat in B wing but so far I have not received demand letter for payment. (Floor wise).
The first floor of B wing work is not fully ready. They will ditpatch demand note after the work get done.
30th July 2013
The HDIL person said that the demand note for 1 floor will be dispatch in Sep Month. They had made the Exotica G + 13 in place of G +12 priviouslly.
6th August 2013

guys any update on date of possessionfor exotica HDIL
Builder only give wage dates But it looking at spped of work it may take atleast 2 more year away.
15th April 2013

Builder only give wage reply. They said to me that the work is going on in exotica. When i said their is no worker at site. that they said today worker might not come. This was some 1 month back. Work is completely stopped at exotica.
I had given you the reply My E mail is asm_sasmira@yahoo.com
31st December 2012

Thanks for update, we all apperciate your hard work ,it's realy because you we all get all this information.please keep us posted.thanks again.
Work is going on smothly. at present First floor slab of A-B wing , Basement work of C-D-E , Basement work of Building 4 is on going in full swing. Mansoon is having no effect on speed of work.
24th June 2013

Q: The work is restarted after a gap of one year. Work is restarted in all the sections Phase I , II and SRA section. In Phase II (Exotica) 3 buildings are being constucted.

My replies to this discussion
I had gone to site on sunday 22/07/12 at 11 am. About 10 worker are working on Exotica site Bulding 3 , and few about 15 on site building 4. The plastering work is undergoing at SRA site and Tile work is going at Phase I Premier Residence . you can visit and see youself. The work is slow and Mr Vinay is right This will take another 2-4 year to complete Phase II.I had gone to site on sunday 22/07/12 at 11 am. About 10 worker are working on Exotica site Bulding 3 , and few about 15 on site building 4. The plastering work is undergoing at SRA site and Tile work is going at Phase I Premier Residence . you can visit and see youself. The work is slow and Mr Vinay is right This will take another 2-4 year to complete Phase II.
Q: I had gone to site on Sunday 22/07/12 at 11 am. About 10 workers are working on Exotica site Bulding 3, and few about 15 on site building 4. The plastering work is undergoing at SRA site and Tile work is going at Phase I Premier Residence . You can visit and see yourself. The work is slow and Mr Vinay is right, this will take another 2-4 years to complete Phase II.

My replies to this discussion
I had book flat at B wing ,1BHK. Almost all the work of all the project are slow and few are almost dead(No Work) from last one year. The new DCR rules make it costly and hence only the project where more than 70 % flat are sold are working in slow mode. All the project of HDIL are stopped from last one year. Builder only give wage reply and pass the time. They have no control on market.I had book flat at B wing ,1BHK. Almost all the work of all the project are slow and few are almost dead(No Work) from last one year. The new DCR rules make it costly and hence only the project where more than 70 % flat are sold are working in slow mode. All the project of HDIL are stopped from last one year. Builder only give wage reply and pass the time. They have no control on market.
I did not meet builder. I had come to know that builder had not paid to his contactors so many of his contactors are left due to unpaid material supply, services etc. I do not know about salary of staff. Builder is quating Dec 2012 for Phase I ( Residence). The agreement is silent on compensation due to time delay. Genrally agreements are one sided .I did not meet builder. I had come to know that builder had not paid to his contactors so many of his contactors are left due to unpaid material supply, services etc. I do not know about salary of staff. Builder is quating Dec 2012 for Phase I ( Residence). The agreement is silent on compensation due to time delay. Genrally agreements are one sided .
Q: The Premier Exotica Adv appear edin today's Times of India(11/08/12). Builder offers a rate of about 9000/- per sqft with special rate for first 50 flats. It appears that builder wants to gain speed in construction by selling remaining unsold flats.

My replies to this discussion
Mostly i will be visiting site on sunday 12/08/12. Will post the update soon.Mostly i will be visiting site on sunday 12/08/12. Will post the update soon.
My comments to replies
guys any update on payments,i have not recived any payment requiest.
I had recieve the demand note for Plinth + Service Tax + VAT due from HDIL premier exotica some 15 days back.
4th September 2012

Q: The work is in full swing at premier exotica site. Builder had created a new entrance just opposite Don Bosco Collage which directly lead to premier exotica Building-3. Builder had put a stall at site to entertain buyers. He is getting many new inquiry as seen by crowd. The Quoted rate is Rs 9450/_ psf which he intended to hike soon. Few 1 BHK of Area 792 and 826 are also available. Builder Procession date is in Dec 2013. The work is also going in SRA Site and Premier Residence. I also have few photo of site but this site do not have photo upload facility.

My replies to this discussion
Their is more Demand for 1 BHK. The Current rate is 20% lower than market rate of nearby other builders. Koninoor is quating 18000/-Psf , Sunteck around 15000/- , Neelkamal Commercial complex is getting ready soon (Just Opp Vidyavihar station). Start of Metro will further rise the price (1.5 km at Ghatkopper)Their is more Demand for 1 BHK. The Current rate is 20% lower than market rate of nearby other builders. Koninoor is quating 18000/-Psf , Sunteck around 15000/- , Neelkamal Commercial complex is getting ready soon (Just Opp Vidyavihar station). Start of Metro will further rise the price (1.5 km at Ghatkopper)
Thanks for news. I will visit soon at siteThanks for news. I will visit soon at site
Only the SRA work is going on. Some monnor work is in progress at phase-I. Work is stopped in Exotica from last one month. But good news is that Buider is constrcting a 60 ft road above a Nalla ( Back Side of SRA) which directly go to Vidyavihar station which is just 5 Min Walk through road. Easy for people going to station by walk.Only the SRA work is going on. Some monnor work is in progress at phase-I. Work is stopped in Exotica from last one month. But good news is that Buider is constrcting a 60 ft road above a Nalla ( Back Side of SRA) which directly go to Vidyavihar station which is just 5 Min Walk through road. Easy for people going to station by walk.
I had visited site on Sat 02-Fab 13. Work is smothly going on on Exotica site Around 20-25 persons are at work. AB Plinth work and digging work of CD wing is under going.I also had few photo which i will upload soon. All the work at (SRA, Phase I )Kurla are going on smothly. If this rate of construction continue than you may expect complete building in 2-2.5 yr time. You need not worry Such delay is very much a part of real estate work in mumbai.I had visited site on Sat 02-Fab 13. Work is smothly going on on Exotica site Around 20-25 persons are at work. AB Plinth work and digging work of CD wing is under going.I also had few photo which i will upload soon. All the work at (SRA, Phase I )Kurla are going on smothly. If this rate of construction continue than you may expect complete building in 2-2.5 yr time. You need not worry Such delay is very much a part of real estate work in mumbai.
My comments to replies
Their is more Demand for 1 BHK. The Current rate is 20% lower than market rate of nearby other builders. Koninoor is quating 18000/-Psf , Sunteck around 15000/- , Neelkamal Commercial complex is getting ready soon (Just Opp Vidyavihar station). Start of Metro will further rise the price (1.5 km at Ghatkopper)
Builder Can Not Modify the area in any registered agreement.That is why the agreement are done to protect end user from any future manupulation. The phase one area of 660 sft is modified to 710 sft in exotica and same is remodified to 790 sft in building no 4 ( New plan) . You need not worry.
17th August 2012

guys work is stop some issue with contactor it may start after diwali?
The work is continue in CDE wing and work is stopped at AB wing. The contactor of A B Wing M/s Remee Infratech had left due to non payment. The contactor of CDE wing M/s Morya constrction is presetly digging the pilling.
17th October 2012

Hi guys, I believe all of you have booked flat in Exotica. As you are the owners of flats in this project, you can join the owners group and discuss anything related to the project in the group with other owners there. To join click Join Owners Group.
I am in group
21st August 2012

the builder has again hiked the rate per sq,ft for exotica.the latest rate is rs 12500 per sq,ft..transfer charges too hiked again..its rs 1000 per sq,ft..parking charges hiked too by rs 2 lakh per parking lot..
After opening a gate for Phase I in Kohinoor City. They are getting many enquiry hence the upword revision of rates. The shopes at phase I are middle of Kohinoor City.
28th May 2013

Q: I have few photo of ongoing work at Exotica Site. The phase I (Premier Residence) Will be given possession In Dec 2012. At present Finishing work is in progress( Tile,Plumbing. Elect Etc).

My replies to this discussion
for exact avalability you need to contact builder at kurla office. I think 1,2,3 BHK are available in new Building no 4(New Plan), Only 2,3 BHK in Building 3 and 4.for exact avalability you need to contact builder at kurla office. I think 1,2,3 BHK are available in new Building no 4(New Plan), Only 2,3 BHK in Building 3 and 4.
My comments to replies
please can add on mSN ,whenever you get picture if you can mail,
At present the SRA work is going on. Phase-I work is slowly going on. Exotica work is fully stopped from last 2 month. A new road is comming behind HDIL complex connecting Vidyavihar station to Santacruz chembur link rd (Close to Lokmaya Tilak Terminus).Builder only give wage reply about constrction work.
26th December 2012

Q: I had receive a demand note for the plinth + Vat + Services Tax dues. I thank many other buyer might have receive the same. Can we all buyers have a joint meeting with builder on some Sunday to understand the future progress of work? After making the payment we may stuck with PreEMI liability for a stopped work.

My comments to replies
Hi Anupam, Have you joined the owners group of Exotica? If not then click Join Owners Group, and you can discuss this with other owners.
I had jion the group but not the log in to group is complex and very time consuming,I log in through yahoo Id. It take me to a foolish page with no continue option.I have to close it waste my time. Could not make any sence of it.
23rd August 2012

Hi, i suggest we all should go and meet the bulider. Even i have my initial payment stuck and there is no sign on the progress of the construction
You can conatct us at E mail Id ameya.sabnis@gmail.com And asm_sasmira@yahoo.com. We will finalise a time and meet with builder.
1st January 2013

My replies to this discussion
1:As per adv it is Sold out but you never know. you can contact builder office at 022-67880001. Contact person Rishi Raj The rates are 9450/- in Phase II. Phase I rates at the time of booking are 5560 to 6150/- 2: Else You can give your requirement and mobile no , E mail at this page I think many persons are interested to sell at the time of poceesion. They will conatct you directly. You will get seller at Other web site such as 99 acres, Magicbricks etc I had seen few seller at these sites. Contact them directly. 3: At last option contact a agent at nearby location for resell. Market is very tight and it is a buyer market so need to bargain. Hope this info is useful to you. 1:As per adv it is Sold out but you never know. you can contact builder office at 022-67880001. Contact person Rishi Raj The rates are 9450/- in Phase II. Phase I rates at the time of booking are 5560 to 6150/- 2: Else You can give your requirement and mobile no , E mail at this page I think many persons are interested to sell at the time of poceesion. They will conatct you directly. You will get seller at Other web site such as 99 acres, Magicbricks etc I had seen few seller at these sites. Contact them directly. 3: At last option contact a agent at nearby location for resell. Market is very tight and it is a buyer market so need to bargain. Hope this info is useful to you.
My comments to replies
Does anybody has recent photos of the construction progress on Exotica ?
I do not have recent photo but i will upload it soon after visit
9th May 2013

Q: present rate of premier exotica.
My replies to this discussion
As on date 27/07/2013 Work is going on in full swing in both Phase I And II. For Exotica A/B Wing First Floor is almost ready. C/D/E basement Third floor work is going on. For Building 4 Work is almost reach to Plinth level. SRA work is fully stopped. Internal road work ( Conctrate ) is going on in Phase I.As on date 27/07/2013 Work is going on in full swing in both Phase I And II. For Exotica A/B Wing First Floor is almost ready. C/D/E basement Third floor work is going on. For Building 4 Work is almost reach to Plinth level. SRA work is fully stopped. Internal road work ( Conctrate ) is going on in Phase I.
Present rate at HDIL is 12500/- psf. Stamp duty 5%, registration Charges 1%, VAT & services charges 2.55%, TDS 1%. Only 2 & 3 BHK flats are available at builder.Present rate at HDIL is 12500/- psf. Stamp duty 5%, registration Charges 1%, VAT & services charges 2.55%, TDS 1%. Only 2 & 3 BHK flats are available at builder.